Contractor dossier
131 projects on file, including joint ventures this contractor is part of.
Total projects
131
Total budget
₱2.4B
Average progress
95.1%
Completion rate
83.2%
Average risk score
38.0
Medium risk on average, out of 100
Flagged as unusual
12
9.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 130 | ₱2.4B | 38.0 | 12 | 95.1% |
| Region VIII | 1 | ₱39.2M | 45.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 48 | ₱286.8M | 21.6 | 0 | 99.8% |
| Roads | 32 | ₱502.3M | 38.6 | 0 | 99.7% |
| Flood Control and Drainage | 26 | ₱1.2B | 41.0 | 1 | 94.9% |
| GAA 2025 SSP | 8 | ₱39.2M | 94.7 | 7 | 54.4% |
| OTHER | 7 | ₱235.9M | 75.1 | 4 | 85.1% |
| Bridges | 6 | ₱110.9M | 41.2 | 0 | 97.3% |
| Water Provision and Storage | 3 | ₱12.1M | 25.4 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱22.5M | 39.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25NG0093CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. TAGANITO, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 44% | High risk95 | Flagged0.022 |
| 25NG0087CONSTRUCTION OF EVACUATION CENTER, BRGY. SAPA, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 61% | High risk95 | Flagged0.019 |
| 25NG0062CONSTRUCTION OF ROAD AT SITIO SABANG, BRGY. TAYAGA, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 3% | High risk95 | Flagged0.034 |
| 25NG0105CONSTRUCTION OF EVACUATION CENTER, BRGY. MAGALLANES, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 82% | High risk95 | Flagged0.013 |
| 25NG0101CONSTRUCTION OF SAN PEDRO - SAN ISIDRO - MAYAG ROAD, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 7% | High risk95 | Flagged0.031 |
| 25NG0027CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. SAN PABLO, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 66% | High risk95 | Flagged0.014 |
| 25NG0099CONSTRUCTION OF CAPAYAHAN-MARGA- SAN PABLO ROAD LEADING TO TOURISM AREA, TUBOD, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 73% | High risk95 | Flagged0.013 |
| 25NG0064CONSTRUCTION OF ROAD, BRGY. SABANG, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱4.9M | 100% | High risk95 | —-0.022 |
| 24NG0092CONSTRUCTION OF ANOMAR FLOOD MITIGATING STRUCTURE/ BARANGAY ANOMAR, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱86.8M | 84% | High risk89 | Flagged0.050 |
| 24NG0045CONSTRUCTION OF BINOCARAN - MALIMONO FLOOD MITIGATION STRUCTURE AT BARANGAY BINOCARAN, MALIMONO, SURIGAO DEL NORTE / BRGY. BINOCARAN, MALIMONO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱86M | 97% | High risk77 | Flagged0.006 |
| 16NF0149CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG SURIGAO-SAN JUAN COASTAL ROAD/SURIGAO CITY, K1119+485 - K1119+625.03, L/S K1119+633.09 - K1119+730.90, L/S, K1119+740 - K1119+813.25, L/S, K1119+823.45 - K1119+951, L/S | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱9.7M | 100% | High risk74 | —-0.023 |
| 25NG0024NRJ BRGY. CAMPO-BRGY. PAYAPAG ROAD LEADING TO SITIO LITTLE BAGUIO FALLS AND FARM, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 19% | High risk74 | Flagged0.018 |
| 24NG0007CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES INDUSTRIES AND ECONOMIC ZONES, CAMPO-CABUGAO ROAD IN SUPPORT TO AGRIBUSINESS INDUSTRY, BACUAG, SURIGAO DEL NORTE / BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱32.6M | 100% | High risk74 | —-0.019 |
| 16NF0141WIDENING OF PERMANENT BRIDGES TO MORE THAN TWO (2) LANES/SIANA BRIDGE (B00859MN) ALONG DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION) K1157+163.00 - K1157+179.00 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱15M | 100% | High risk74 | —-0.023 |
| 24NG0106CONSTRUCTION OF DRRM BUILDING, MAINIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱979.3K | 96% | High risk64 | Flagged0.037 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24NG0092CONSTRUCTION OF ANOMAR FLOOD MITIGATING STRUCTURE/ BARANGAY ANOMAR, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱86.8M | 84% | High risk89 | Flagged0.050 |
| 24NG0106CONSTRUCTION OF DRRM BUILDING, MAINIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱979.3K | 96% | High risk64 | Flagged0.037 |
| 25NG0062CONSTRUCTION OF ROAD AT SITIO SABANG, BRGY. TAYAGA, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 3% | High risk95 | Flagged0.034 |
| 25NG0101CONSTRUCTION OF SAN PEDRO - SAN ISIDRO - MAYAG ROAD, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 7% | High risk95 | Flagged0.031 |
| 25NG0093CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. TAGANITO, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 44% | High risk95 | Flagged0.022 |
| 25NG0087CONSTRUCTION OF EVACUATION CENTER, BRGY. SAPA, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 61% | High risk95 | Flagged0.019 |
| 25NG0024NRJ BRGY. CAMPO-BRGY. PAYAPAG ROAD LEADING TO SITIO LITTLE BAGUIO FALLS AND FARM, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 19% | High risk74 | Flagged0.018 |
| 23NG0155REPAIR OF CABUGAO FLOOD CONTROL / BRGY. CABUGAO, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱30M | 0% | Medium risk59 | Flagged0.016 |
| 25NG0027CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. SAN PABLO, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 66% | High risk95 | Flagged0.014 |
| 25NG0099CONSTRUCTION OF CAPAYAHAN-MARGA- SAN PABLO ROAD LEADING TO TOURISM AREA, TUBOD, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 73% | High risk95 | Flagged0.013 |
| 25NG0105CONSTRUCTION OF EVACUATION CENTER, BRGY. MAGALLANES, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 82% | High risk95 | Flagged0.013 |
| 24NG0045CONSTRUCTION OF BINOCARAN - MALIMONO FLOOD MITIGATION STRUCTURE AT BARANGAY BINOCARAN, MALIMONO, SURIGAO DEL NORTE / BRGY. BINOCARAN, MALIMONO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱86M | 97% | High risk77 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 21NG0117CONSTRUCTION (COMPLETION) OF THE MUNICIPAL BUILDING / SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱9.9M | 100% | Medium risk38 | —-0.082 |
| 77 | 23NG0055CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (MUNICIPAL BUILDING)/BARANGAY SAN PEDRO, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱9.8M | 100% | Medium risk38 | —-0.084 |
| 78 | 19NG0004CONSTRUCTION OF RIVERBANK IN BRGY. MABINI / BRGY. MABINI, MAINIT, SURIGAO DEL NORTE, LINE A: STA.0+020.00 K0+103..45; LINE B: STA.0+095.70 - K0+159.00 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱9.3M | 100% | Medium risk38 | —-0.068 |
| 79 | 23NG0076CONSTRUCTION OF TWO-STOREY (6 CLASSROOMS) SCHOOL BUILDING/ BACUAG NATIONAL AGRO-INDUSTRIAL SCHOOL, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱18.8M | 100% | Medium risk38 | —-0.003 |
| 80 | 19NG0006CONSTRUCTION OF FLOOD CONTROL / BRGY. CABUGAO, BACUAG, SURIGAO DEL NORTE, STA.0+067.00 - STA.0+200.00 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱19.6M | 100% | Medium risk38 | —-0.068 |
| 81 | 21NG0016CONSTRUCTION OF MAGTIACO RIVER FLOOD CONTROL ALONG MAGTIACO RIVER / BRGY. SAN PEDRO, ALEGRIA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱9.9M | 100% | Medium risk38 | —-0.070 |
| 82 | 20NG0049CONSTRUCTION OF MAGTIACO RIVER FLOOD CONTROL ALONG MAGTIACO RIVER / BRGY. SAN PEDRO, ALEGRIA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱9.4M | 100% | Medium risk37 | —-0.069 |
| 83 | 19NG0012CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, LADGARON RIVER / BRGY. LADGARON, CLAVER, SURIGAO DEL NORTE STA.0+314.00 - STA.0+381.60 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱9.3M | 100% | Medium risk37 | —-0.066 |
| 84 | 21NH0093CONSTRUCTION OF PROPOSED CAMP OF PHILIPPINE ARMY, BRGY. DAYOAN, TAGO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱37.1M | 100% | Medium risk37 | —-0.068 |
| 85 | 19NH0096CONCRETING OF BRGY. SIAGAO - BRGY. TINA FMR, BRGY. SIAGAO AND BRGY. TINA, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱29.9M | 100% | Medium risk37 | —-0.023 |
| 86 | 18NF0122CONSTRUCTION OF TWO-STOREY (4 CLASSROOMS) SCHOOL BUILDING / MAGTANGALE ELEMENTARY SCHOOL, SAN FRANCISCO (ANAO-AON), SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱11.4M | 100% | Medium risk36 | —-0.044 |
| 87 | 23NG0069CONSTRUCTION OF 1 STOREY 2 CLASSROOM SCHOOL BUILDING/HINAPAYAW ELEMENTARY SCHOOL, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱7.5M | 100% | Medium risk36 | —-0.044 |
| 88 | 24N00199DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP), LGU HOSPITALS - SURIGAO DEL NORTE PROVINCIAL HOSPITAL, SURIGAO DEL NORTE | Region XIII | Region XIII | On-Going | ₱9.6M | 98% | Medium risk36 | —-0.014 |
| 89 | 21NG0102CONCRETING OF BRGY. SAN ISIDRO TO BRGY. MAYAG FMR, BRGY. SAN ISIDRO AND BRGY. MAYAG, SISON, SURIGAO DEL NORTE/ BRGY. SAN ISIDRO, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱12.4M | 100% | Medium risk36 | —-0.038 |
| 90 | 18NH0103CONCRETING OF PUROK 7-SITIO MANSALARAY,BRGY. SIAGAO FMR,BRGY. SIAGAO,SAN MIGUEL,SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱24.9M | 100% | Medium risk36 | —-0.023 |
| 91 | 23NG0073CONSTRUCTION OF 1 STOREY 2 CLASSROOM SCHOOL BUILDING/BANBAN ELEMENTARY SCHOOL, TAGANA-AN, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱8M | 100% | Medium risk36 | —-0.044 |
| 92 | 23NE0100CONSTRUCTION OF 1STY2CL, MATINGBE ELEMENTARY SCHOOL, SAN JOSE, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | Completed | ₱8M | 100% | Medium risk35 | —-0.045 |
| 93 | 18NF0116CONSTRUCTION OF TWO-STOREY (6 CLASSROOMS) SCHOOL BUILDING / BACUAG ELEMENTARY SCHOOL, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱13.8M | 100% | Medium risk35 | —-0.042 |
| 94 | 18NF0119CONSTRUCTION OF TWO-STOREY (4 CLASSROOMS) SCHOOL BUILDING / ELLAPERRAL ELEMENTARY SCHOOL, PLACER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱12.8M | 100% | Medium risk35 | —-0.042 |
| 95 | 23NG0061CONCRETING OF PUROK 4 TO PUROK 6, BRGY. PAUTAO FMR, BRGY. PAUTAO, BACUAG, SURIGAO DEL NORTE/BRGY. PAUTAO, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱11.7M | 100% | Medium risk34 | —-0.038 |
| 96 | 23NG0062CONCRETING OF PUROK 3 TO PUROK 2, BRGY. PONGTUD FMR, BRGY. PONGTUD, BACUAG, SURIGAO DEL NORTE/BRGY. PONGTUD, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱11.9M | 100% | Medium risk34 | —-0.038 |
| 97 | 23NG0063CONCRETING OF PUROK 1, BRGY. CAMBUAYON FMR, BRGY. CAMBUAYON, BACUAG, SURIGAO DEL NORTE/BRGY. CAMBUAYON, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱11.9M | 100% | Medium risk34 | —-0.038 |
| 98 | 24NG0107CONSTRUCTION OF MUNICIPAL BUILDING COMFORT ROOM, BARANGAY MAGPAYANG, MAINIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱2M | 90% | Low risk26 | —-0.011 |
| 99 | 20NG0093CONSTRUCTION OF RAIN WATER COLLECTOR SYSTEM/ ELLAPERAL ES, SANI-SANI ES, LAKANDULA ES, LAKANDULA NHS, TIMAMANA ES, CAMPO ES, PANANAY-AN ES, STA. CRUZ ES, SISON CES, ALEGRIA TERMINAL, OMBONG ES, ALEGRIA CES, BUDLINGIN ES, ALIPAO ES, ROXAS ES, MAGPAYANG ES | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱4M | 100% | Low risk18 | —-0.049 |
| 100 | 18NF0087CONSTRUCTION OF RAIN WATER COLLECTOR SYSTEM, LASICAM-PERRAL NHS, WILFREDO D. RAFOLS MEM. NHS, TAGANAAN NHS (ASA), MAT-I NHS, CIVIL SERVICE COMMISSION FIELD OFFICE, TIMAMANA NHS, SAPA ES, SURIGAO CITY STAND ALONE, AMOSLOG ES, PLACER CENTRAL ES, MAINIT CENT | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱3.2M | 100% | Low risk17 | —-0.045 |