Contractor dossier
124 projects on file, including joint ventures this contractor is part of.
Total projects
124
Total budget
₱1.4B
Average progress
90.2%
Completion rate
46.8%
Below 70%
Average risk score
49.4
Medium risk on average, out of 100
Flagged as unusual
10
8.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 124 | ₱1.4B | 49.4 | 10 | 90.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 54 | ₱634.5M | 43.2 | 0 | 95.1% |
| Buildings and Facilities | 32 | ₱252.2M | 39.0 | 1 | 85.2% |
| GAA 2025 SSP | 14 | ₱247.6M | 94.0 | 5 | 78.2% |
| Water Provision and Storage | 14 | ₱72.6M | 42.4 | 0 | 97.2% |
| OTHER | 3 | ₱56.2M | 80.9 | 3 | 70.2% |
| Flood Control and Drainage | 3 | ₱21.3M | 27.9 | 1 | 96.4% |
| GAA 2025 OO-2 | 2 | ₱79.6M | 84.7 | 0 | 91.4% |
| GAA 2025 OO-1 | 1 | ₱33.3M | 91.5 | 0 | 79.1% |
| Bridges | 1 | ₱4.9M | 46.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KD0065CONST OF RIVER CONTROL AND PUROK 1-A AND VILLA ERNESTO SUBDIVISION, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 2nd DEO | On-Going | ₱29.6M | 23% | High risk95 | Flagged0.019 |
| 25KH0084CONSTRUCTION OF THE MULTI-PURPOSE BUILDING (SENATOR AQUILINO PIMENTEL, JR. BARANGAY ECONOMIC ENTERPRISE (SAP-BEE)), KAUSWAGAN, CAGAYAN DE ORO, MISAMIS ORIENTAL | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱29.7M | 38% | High risk95 | Flagged0.013 |
| 25KH0047CONSTRUCTION OF ROADS WITH DRAINAGES IN BARANGAY CANITOAN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱24.7M | 100% | High risk95 | —-0.005 |
| 25KL0017CONSTRUCTION OF PEDESTRIAN OVERPASS ALONG BCIR-K1448+420, BRGY. LUYONG BONBON, OPOL, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱19.6M | 90% | High risk95 | Flagged0.000 |
| 25KH0023REHABILITATION OF CANITOAN-PAGATPAT ROAD, CAGAYAN DE ORO CITY, MISAMIS ORIENTAL | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱12.7M | 100% | High risk95 | —-0.005 |
| 25KH0053REHABILITATION/IMPROVEMENT OF ROAD AT BARANGAY CANITOAN, CAGAYAN DE ORO CITY, MISAMIS ORIENTAL | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱9.9M | 91% | High risk95 | —-0.002 |
| 25KL0086CONSTRUCTION OF MULTI-PURPOSE BUILDING INITAO, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱24.5M | 28% | High risk95 | Flagged0.015 |
| 25KH0045REHABILITATION OF ROADS IN BARANGAY PAGATPAT, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱9.8M | 90% | High risk95 | —-0.002 |
| 25KL0115CONSTRUCTION OF ROAD, BARANGAY KIMAYA TO BARANGAY NATUBO, JASAAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱13.9M | 100% | High risk95 | —-0.004 |
| 25KL0116CONSTRUCTION OF SCHOOL BUILDING, AYA-AYA, LUGAIT, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱19.3M | 42% | High risk94 | Flagged0.013 |
| 25KK0040CONSTRUCTION OF MULTI-PURPOSE BUILDING (BALINGOAN COMMUNITY COLLEGE), BALINGOAN, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | On-Going | ₱39.6M | 92% | High risk94 | —-0.001 |
| 25KH0014CONSTRUCTION OF MULTIPURPOSE BUILDING IN BARANGAY PAGATPAT, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱4.9M | 100% | High risk94 | —-0.005 |
| 25KK0061CONSTRUCTION OF ROAD AT BARANGAY BINAKALAN, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱5M | 100% | High risk92 | —-0.005 |
| 25KK0010ROAD WIDENING - PRIMARY ROADS - BUTUAN CITY - CAGAYAN DE ORO CITY - ILIGAN CITY RD - K1368 + 175 - K1368 + 236, K1369 + 148 - K1369 + 650 | Region X | Misamis Oriental 1st DEO | On-Going | ₱33.3M | 79% | High risk91 | —-0.007 |
| 25KL0090IMPROVEMENT OF BARANGAY ROAD, BRGY. PANIANGAN, MANTICAO, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱4.5M | 100% | High risk87 | —-0.006 |
| 25KH0025CONSTRUCTION OF DRAINAGE SYSTEMS IN BARANGAY CARMEN, CAGAYAN DE ORO CITY, MISAMIS ORIENTAL | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱31.6M | 83% | High risk86 | —-0.021 |
| 24KH0128CONSTRUCTION OF FLOOD CONTROL STRUCTURE IN BARANGAY IPONAN (PACKAGE 13), CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱20.3M | 100% | High risk85 | Flagged0.031 |
| 25KK0069CONCRETING OF BRGY. MALINAO FMR, BRGY. MALINAO, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱14.9M | 85% | High risk84 | Flagged0.039 |
| 25KL0040CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUNCALALAN RIVER, TABOC SECTION (PACKAGE 1), OPOL, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱48M | 100% | High risk83 | —-0.055 |
| 25K00430STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATION CENTERS, REGION X, NAAWAN, MISAMIS ORIENTAL PHASE II | Region X | Region X | On-Going | ₱21.1M | 26% | High risk73 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KK0069CONCRETING OF BRGY. MALINAO FMR, BRGY. MALINAO, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱14.9M | 85% | High risk84 | Flagged0.039 |
| 25KL0149CONSTRUCTION OF SCHOOL BUILDING, BULAHAN INTEGRATED SCHOOL, BARANGAY BULAHAN CLAVERIA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱15M | 4% | Low risk25 | Flagged0.036 |
| 24KH0128CONSTRUCTION OF FLOOD CONTROL STRUCTURE IN BARANGAY IPONAN (PACKAGE 13), CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱20.3M | 100% | High risk85 | Flagged0.031 |
| 25KD0065CONST OF RIVER CONTROL AND PUROK 1-A AND VILLA ERNESTO SUBDIVISION, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 2nd DEO | On-Going | ₱29.6M | 23% | High risk95 | Flagged0.019 |
| 25KL0086CONSTRUCTION OF MULTI-PURPOSE BUILDING INITAO, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱24.5M | 28% | High risk95 | Flagged0.015 |
| 25KH0084CONSTRUCTION OF THE MULTI-PURPOSE BUILDING (SENATOR AQUILINO PIMENTEL, JR. BARANGAY ECONOMIC ENTERPRISE (SAP-BEE)), KAUSWAGAN, CAGAYAN DE ORO, MISAMIS ORIENTAL | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱29.7M | 38% | High risk95 | Flagged0.013 |
| 25KL0116CONSTRUCTION OF SCHOOL BUILDING, AYA-AYA, LUGAIT, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱19.3M | 42% | High risk94 | Flagged0.013 |
| 24KH0120CONSTRUCTION OF DRAINAGE SYSTEM IN BARANGAY CARMEN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱14.5M | 89% | Medium risk51 | Flagged0.011 |
| 25K00430STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATION CENTERS, REGION X, NAAWAN, MISAMIS ORIENTAL PHASE II | Region X | Region X | On-Going | ₱21.1M | 26% | High risk73 | Flagged0.005 |
| 25KL0017CONSTRUCTION OF PEDESTRIAN OVERPASS ALONG BCIR-K1448+420, BRGY. LUYONG BONBON, OPOL, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱19.6M | 90% | High risk95 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25KD0065CONST OF RIVER CONTROL AND PUROK 1-A AND VILLA ERNESTO SUBDIVISION, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 2nd DEO | On-Going | ₱29.6M | 23% | High risk95 | Flagged0.019 |
| 2 | 25KH0084CONSTRUCTION OF THE MULTI-PURPOSE BUILDING (SENATOR AQUILINO PIMENTEL, JR. BARANGAY ECONOMIC ENTERPRISE (SAP-BEE)), KAUSWAGAN, CAGAYAN DE ORO, MISAMIS ORIENTAL | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱29.7M | 38% | High risk95 | Flagged0.013 |
| 3 | 25KH0047CONSTRUCTION OF ROADS WITH DRAINAGES IN BARANGAY CANITOAN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱24.7M | 100% | High risk95 | —-0.005 |
| 4 | 25KL0017CONSTRUCTION OF PEDESTRIAN OVERPASS ALONG BCIR-K1448+420, BRGY. LUYONG BONBON, OPOL, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱19.6M | 90% | High risk95 | Flagged0.000 |
| 5 | 25KH0023REHABILITATION OF CANITOAN-PAGATPAT ROAD, CAGAYAN DE ORO CITY, MISAMIS ORIENTAL | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱12.7M | 100% | High risk95 | —-0.005 |
| 6 | 25KH0053REHABILITATION/IMPROVEMENT OF ROAD AT BARANGAY CANITOAN, CAGAYAN DE ORO CITY, MISAMIS ORIENTAL | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱9.9M | 91% | High risk95 | —-0.002 |
| 7 | 25KL0086CONSTRUCTION OF MULTI-PURPOSE BUILDING INITAO, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱24.5M | 28% | High risk95 | Flagged0.015 |
| 8 | 25KH0045REHABILITATION OF ROADS IN BARANGAY PAGATPAT, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱9.8M | 90% | High risk95 | —-0.002 |
| 9 | 25KL0115CONSTRUCTION OF ROAD, BARANGAY KIMAYA TO BARANGAY NATUBO, JASAAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱13.9M | 100% | High risk95 | —-0.004 |
| 10 | 25KL0116CONSTRUCTION OF SCHOOL BUILDING, AYA-AYA, LUGAIT, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱19.3M | 42% | High risk94 | Flagged0.013 |
| 11 | 25KK0040CONSTRUCTION OF MULTI-PURPOSE BUILDING (BALINGOAN COMMUNITY COLLEGE), BALINGOAN, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | On-Going | ₱39.6M | 92% | High risk94 | —-0.001 |
| 12 | 25KH0014CONSTRUCTION OF MULTIPURPOSE BUILDING IN BARANGAY PAGATPAT, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱4.9M | 100% | High risk94 | —-0.005 |
| 13 | 25KK0061CONSTRUCTION OF ROAD AT BARANGAY BINAKALAN, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱5M | 100% | High risk92 | —-0.005 |
| 14 | 25KK0010ROAD WIDENING - PRIMARY ROADS - BUTUAN CITY - CAGAYAN DE ORO CITY - ILIGAN CITY RD - K1368 + 175 - K1368 + 236, K1369 + 148 - K1369 + 650 | Region X | Misamis Oriental 1st DEO | On-Going | ₱33.3M | 79% | High risk91 | —-0.007 |
| 15 | 25KL0090IMPROVEMENT OF BARANGAY ROAD, BRGY. PANIANGAN, MANTICAO, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱4.5M | 100% | High risk87 | —-0.006 |
| 16 | 25KH0025CONSTRUCTION OF DRAINAGE SYSTEMS IN BARANGAY CARMEN, CAGAYAN DE ORO CITY, MISAMIS ORIENTAL | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱31.6M | 83% | High risk86 | —-0.021 |
| 17 | 24KH0128CONSTRUCTION OF FLOOD CONTROL STRUCTURE IN BARANGAY IPONAN (PACKAGE 13), CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱20.3M | 100% | High risk85 | Flagged0.031 |
| 18 | 25KK0069CONCRETING OF BRGY. MALINAO FMR, BRGY. MALINAO, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱14.9M | 85% | High risk84 | Flagged0.039 |
| 19 | 25KL0040CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUNCALALAN RIVER, TABOC SECTION (PACKAGE 1), OPOL, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱48M | 100% | High risk83 | —-0.055 |
| 20 | 25K00430STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATION CENTERS, REGION X, NAAWAN, MISAMIS ORIENTAL PHASE II | Region X | Region X | On-Going | ₱21.1M | 26% | High risk73 | Flagged0.005 |
| 21 | 24KH0120CONSTRUCTION OF DRAINAGE SYSTEM IN BARANGAY CARMEN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱14.5M | 89% | Medium risk51 | Flagged0.011 |
| 22 | 25KH0001ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS CDO-AIRPORT-BUKIDNON RD - K1451 + 320 - K1451 + 359, K1452 + 011 - K1452 + 405, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱49M | 99% | Medium risk49 | —-0.060 |
| 23 | 25KH0002ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS LUMBIA-UGUIABAN BY-PASS RD - (S00618MN) CHAINAGE 1965 - CHAINAGE 2065, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱49M | 93% | Medium risk49 | —-0.056 |
| 24 | 25KL0132CONCRETING OF BRGY. BOLISONG FMR, BRGY. BOLISONG, EL SALVADOR CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱14.8M | 93% | Medium risk47 | —-0.003 |
| 25 | 25KH0086CONCRETING OF BRGY. LUMBIA FMR (PHASE II), BRGY. LUMBIA, CAGAYAN DE ORO CITY, MISAMIS ORIENTAL | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱14.9M | 91% | Medium risk46 | —-0.001 |