Opening the dossier…
Opening the dossier…
Contractor dossier
5 projects on file, including joint ventures this contractor is part of.
Total projects
5
Total budget
₱90M
Average progress
100.0%
Completion rate
100.0%
Average risk score
47.8
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 5 | ₱90M | 47.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 4 | ₱60.3M | 48.5 | 0 | 100.0% |
| Flood Control and Drainage | 1 | ₱29.7M | 44.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Nothing to report.
No high-risk projects here.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24A00517BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI - PURPOSE FACILITY (MUNICIPAL HALL VICINITY AREA), BRGY. RIZAL, TAGUDIN, ILOCOS SUR | Region I | Region I | Completed | ₱39.5M | 100% | Medium risk52 | —-0.083 |
| 2 | 24A00296BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARACBAC COMMUNITY SCHOOL, TAGUDIN, ILOCOS SUR | Region I | Region I | Completed | ₱9.9M | 100% | Medium risk50 | —-0.086 |
| 3 | 24AD0062REHABILITATION OF MULTI-PURPOSE BUILDING (GABALDON BLDG.), ILOCOS SUR POLYTECHNIC COLLEGE, TAGUDIN, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱4.9M | 100% | Medium risk49 | —-0.083 |
| 4 | 24A00516BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AMBURAYAN RIVER, BRGYS. PALLOGAN, CABULANGLANGAN, AG-AGUMAN AND PULA, TAGUDIN, ILOCOS SUR | Region I | Region I | Completed | ₱29.7M | 100% | Medium risk45 | —-0.070 |
| 5 | 24A00573COMPLETION/EQUIPPING OF SUPER HEALTH CENTERS - TAGUDIN SUPER HEALTH CENTER, ILOCOS SUR | Region I | Region I | Completed | ₱6M | 100% | Medium risk43 | —-0.046 |