44 projects on file, including joint ventures this contractor is part of.
Total projects
44
Total budget
₱1.6B
Average progress
94.9%
Completion rate
86.4%
Average risk score
51.0
Medium risk on average, out of 100
Flagged as unusual
4
9.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 22 | ₱909.8M | 55.1 | 3 | 93.5% |
| Region II | 21 | ₱662.6M | 47.0 | 1 | 96.2% |
| Region VII | 1 | ₱6.7M | 45.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 16 | ₱673.6M | 53.6 | 0 | 100.0% |
| Buildings and Facilities | 14 | ₱291.5M | 39.4 | 0 | 100.0% |
| Bridges | 11 | ₱507.8M | 52.5 | 1 | 90.8% |
| OTHER | 2 | ₱57.8M | 80.6 | 2 | 76.4% |
| GAA 2025 SSP | 1 | ₱48.4M | 95.6 | 1 | 25.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BC0061CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (NWCGH), BRGY. PINILI, LIBERTAD, ABULUG, CAGAYAN (PACKAGE 4) | Region II | Cagayan 2nd DEO | On-Going | ₱48.4M | 25% | High risk96 | Flagged0.033 |
| 24PB0050COVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS( TOURISM ROAD INFRASTRUCTURE PROGRAM- TRIP), CAGLAYAN-PADDIG- CUPIS ROAD LEADING TO NABAUNGAN RIVER, BANSELAN CAVE, UPIS LOOMWEAVING | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱48.2M | 98% | High risk81 | Flagged0.006 |
| 25PB0036CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), CAGLAYAN-PADDIG-CUPIS ROAD LEADING TO NABUANGAN RIVER, BANSELAN CAVE, CUPIS LOOMWEAVING | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱9.6M | 55% | High risk80 | Flagged0.011 |
| 25PB0043NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS : PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD - PACKAGE 2 (CONSTRUCTION OF CONCRETE BRIDGE), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱141.7M | 3% | High risk67 | Flagged0.021 |
| 17BD0051MFO1: CONST. OF DRAINAGE STRUCTURE ALONG NAT'L. RD., CVR RGC RD. NETWORK, S00708LZ CHAINAGE000-CHAINAGE919 W/ EXCEPTION;S00709LZ CHAINAGE000-CHAINAGE278;S00711LZ CHAINAGE000-CHAINAGE286; S00713LZ CHAINAGE000-CHAINAGE733 W/ EXCEPTION;S00714LZ CHAINAGE000- | Region II | Cagayan 3rd DEO | Completed | ₱35.6M | 100% | High risk65 | —-0.048 |
| 17P00004ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) AYAGA - STA. MARCELA - FLORA - LASAM ROAD, CHAINAGE 12937 - CHAINAGE 14620, CHAINAGE 14694 - CHAINANGE 180 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | High risk61 | —-0.023 |
| 17PB0005OFF-CARRIAGE IMPROVEMENT INCLUDING DRAINAGE SECONDARY ROADS, ABBUT-CONNER ROADS, K0540+(-375) - K0540+(-255), K0540+(-225) - K0540+(-085), K0540+(-085) - K0541+240, K0541+258 - K0541+534 | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱27.1M | 100% | High risk60 | —-0.047 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BC0061CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (NWCGH), BRGY. PINILI, LIBERTAD, ABULUG, CAGAYAN (PACKAGE 4) | Region II | Cagayan 2nd DEO | On-Going | ₱48.4M | 25% | High risk96 | Flagged0.033 |
| 25PB0043NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS : PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD - PACKAGE 2 (CONSTRUCTION OF CONCRETE BRIDGE), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱141.7M | 3% | High risk67 | Flagged0.021 |
| 25PB0036CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), CAGLAYAN-PADDIG-CUPIS ROAD LEADING TO NABUANGAN RIVER, BANSELAN CAVE, CUPIS LOOMWEAVING | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱9.6M | 55% | High risk80 | Flagged0.011 |
| 24PB0050COVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS( TOURISM ROAD INFRASTRUCTURE PROGRAM- TRIP), CAGLAYAN-PADDIG- CUPIS ROAD LEADING TO NABAUNGAN RIVER, BANSELAN CAVE, UPIS LOOMWEAVING | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱48.2M | 98% | High risk81 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25BC0061CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (NWCGH), BRGY. PINILI, LIBERTAD, ABULUG, CAGAYAN (PACKAGE 4) | Region II | Cagayan 2nd DEO | On-Going | ₱48.4M | 25% | High risk96 | Flagged0.033 |
| 2 | 24PB0050COVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS( TOURISM ROAD INFRASTRUCTURE PROGRAM- TRIP), CAGLAYAN-PADDIG- CUPIS ROAD LEADING TO NABAUNGAN RIVER, BANSELAN CAVE, UPIS LOOMWEAVING | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱48.2M | 98% | High risk81 | Flagged0.006 |
| 3 | 25PB0036CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), CAGLAYAN-PADDIG-CUPIS ROAD LEADING TO NABUANGAN RIVER, BANSELAN CAVE, CUPIS LOOMWEAVING | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱9.6M | 55% | High risk80 | Flagged0.011 |
| 4 | 25PB0043NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS : PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD - PACKAGE 2 (CONSTRUCTION OF CONCRETE BRIDGE), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱141.7M | 3% | High risk67 | Flagged0.021 |
| 5 | 17BD0051MFO1: CONST. OF DRAINAGE STRUCTURE ALONG NAT'L. RD., CVR RGC RD. NETWORK, S00708LZ CHAINAGE000-CHAINAGE919 W/ EXCEPTION;S00709LZ CHAINAGE000-CHAINAGE278;S00711LZ CHAINAGE000-CHAINAGE286; S00713LZ CHAINAGE000-CHAINAGE733 W/ EXCEPTION;S00714LZ CHAINAGE000- | Region II | Cagayan 3rd DEO | Completed | ₱35.6M | 100% | High risk65 | —-0.048 |
| 6 | 17P00004ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) AYAGA - STA. MARCELA - FLORA - LASAM ROAD, CHAINAGE 12937 - CHAINAGE 14620, CHAINAGE 14694 - CHAINANGE 180 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | High risk61 | —-0.023 |
| 7 | 17PB0005OFF-CARRIAGE IMPROVEMENT INCLUDING DRAINAGE SECONDARY ROADS, ABBUT-CONNER ROADS, K0540+(-375) - K0540+(-255), K0540+(-225) - K0540+(-085), K0540+(-085) - K0541+240, K0541+258 - K0541+534 | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱27.1M | 100% | High risk60 | —-0.047 |
| 8 | 17PB0004OFF-CARRIAGEWAY IMPROVEMENT-SECONDARY ROADS INCLUDING DRAINAGE ALONG CONNER-KABUGAO ROAD, K0566+ (-)262 - K0566+411, K0575+775 - K0576+665 | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱20.3M | 100% | Medium risk60 | —-0.048 |
| 9 | 17PC0005OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY ROAD K0640+105, KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY ROAD K0640+1057 - K0643+086, K0669+132 - K0670+420, K0673+021 - K0677+100 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱46.4M | 100% | Medium risk59 | —-0.045 |
| 10 | 17PC0006OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG AYAGA - STA. MARCELA - FLORA - LASAM ROAD CHAINAGE 1945 TO CHAINAGE 4000 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱18.6M | 100% | Medium risk59 | —-0.047 |
| 11 | 18PC0009ROAD UPGRADING (UNPAVED TO PAVED) CLAVERIA-CALANASAN-KABUGAO ROAD, KO673+234-K0674+303, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱59M | 100% | Medium risk59 | —-0.073 |
| 12 | 18PC0010ROAD UPGRADING (UNPAVED TO PAVED) AYAGA-STA. MARCELA-FLORA-LASAM ROAD (22619-23768)-(23777-24448)-(24489-26002), APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱93.6M | 100% | Medium risk58 | —-0.066 |
| 13 | 21BD0110LOCAL PROGRAM -NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - CONSTRUCTION OF CIVIL SERVICE COMMISSION REGIONAL OFFICE 02 BUILDING, RGC, CARIG SUR, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱48.2M | 100% | Medium risk57 | —-0.070 |
| 14 | 19PB0006NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS / NEW ROADS ABRA-KALINGA-APAYAO ROAD (BULUAN-BANBAN-PUGUIN-SACPIL- PINUKPOK), PACKAGE 3, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱56.3M | 100% | Medium risk56 | —-0.073 |
| 15 | 20PL0056NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS ALONG KALINGA-CAGAYAN ROAD (CALANAN-ENRILE SECTION), K0496+-593 - K0496+-027, K0496+523-K0497+134, K0513+800-K0514+549 | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱62.6M | 100% | Medium risk55 | —-0.077 |
| 16 | 24PB0052LOCAL PROGRAM- NATIONAL BUILDING PROGRAM -BUILDINGS AND OTHER STRUCTURES, CONSTRUCTION(COMPLETION) OF DPWH APAYAO 1ST DEO BUILDING, CAGLAYAN,CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱9.8M | 100% | Medium risk55 | —-0.043 |
| 17 | 21BD0077LOCAL PROG. - LOCAL ROADS & BRIDGES - LOCAL ROADS - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - IGUIG BYPASS ROAD (MANAOAG BRIDGE), IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱67.5M | 100% | Medium risk54 | —-0.034 |
| 18 | 22BB0007OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES - REPLACEMENT OF BRIDGE - BITAG GRANDE BR. 2 (B04257LZ) ALONG BBDSMR, BAGGAO, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱57.3M | 100% | Medium risk54 | —-0.033 |
| 19 | 17PC0007CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - REPLACEMENT OF PERMANENT WEAK BRIDGES INCLUDING APPROACHES PAPAGAN BRIDGE (MABEY) (B04306LZ) ALONG AYAGA-STA. MARCELA-LASAM ROAD | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱18.6M | 100% | Medium risk54 | —-0.015 |
| 20 | 20BB0012OO1: ENSURE SAFE AND RELIABLE NATIONAL ROADS SYSTEM-BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES - BITAG GRANDE BRIDGE NO. 1 (B04256LZ) ALONG BAYBAYOG-BAGGAO-DALIN-STA. MARGARITA RD, BAGGAO, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱47.3M | 100% | Medium risk52 | —-0.024 |
| 21 | 19PB0023NETWORK DEVELOPMENT-OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS, CONNER-KABUGAO RD | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱8.3M | 100% | Medium risk51 | —-0.080 |
| 22 | 24BB0046OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES, CONSTRUCTION OF CONCRETE BRIDGE - TALLANG BRIDGE 1 (PHASE II) ALONG BAYBAYOG-BAGGAO-DALIN-STA. MARGARITA RD, BAGGAO, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱48.9M | 96% | Medium risk51 | —-0.011 |
| 23 | 23PB0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMRPOVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS(TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), CAGLAYAN,PADDIG-CUPIS ROAD LEADING TO NABUANGAN RIVER,BANSELAN CAVE,CUPIS LOONWEAVING | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱38.4M | 100% | Medium risk51 | —-0.078 |
| 24 | 19PB0022NETWORK DEVELOPMENT-OFF-CARRIAGEWAY IMPROVEMENT SECONDARY ROADS, ABBUT-CONNER RD | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱34.6M | 100% | Medium risk50 | —-0.080 |
| 25 | 23PB0041ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS,SLOPE COLLAPSE AND LANSLIDE - TERTIARY ROADS, APAYAO-ILOCOS NORTE RD-K0621+090-K0621+130,K0623+(-347)-K0623+(-319), K0624+656-K0624+672 | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱16.2M | 100% | Medium risk50 | —-0.078 |