Contractor dossier
51 projects on file, including joint ventures this contractor is part of.
Total projects
51
Total budget
₱3.7B
Average progress
94.9%
Completion rate
82.4%
Average risk score
53.0
Medium risk on average, out of 100
Flagged as unusual
2
3.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 20 | ₱2B | 55.2 | 2 | 88.6% |
| Region IV-B | 19 | ₱828.7M | 49.1 | 0 | 100.0% |
| Region IV-A | 7 | ₱162.6M | 50.3 | 0 | 100.0% |
| Region II | 3 | ₱303.8M | 62.2 | 0 | 100.0% |
| National Capital Region | 2 | ₱381.2M | 64.6 | 0 | 85.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 36 | ₱2.9B | 50.5 | 1 | 94.2% |
| OTHER | 4 | ₱193M | 73.3 | 0 | 100.0% |
| Bridges | 4 | ₱244.3M | 49.2 | 1 | 87.9% |
| Flood Control and Drainage | 3 | ₱175.1M | 70.0 | 0 | 100.0% |
| Buildings and Facilities | 2 | ₱138.2M | 50.3 | 0 | 100.0% |
| Bridges, Roads | 2 | ₱85.3M | 44.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22C00073CONVERGENCE AND SPECIAL SUPPORT PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF DINGALAN-DONA REMEDIOS TRINIDAD ROAD, PROVINCE OF AURORA | Region III | Region III | On-Going | ₱193M | 100% | High risk76 | Flagged0.002 |
| 20EB0102CONSTRUCTION OF ROAD INCLUDING BRIDGE, SO. PUSOG, BRGY. BURGOS, SABLAYAN, OCCIDENTAL MINDORO, STA. 0+000 - STA. 0+212 | Region IV-B | Mindoro Occidental DEO | Completed | ₱48.8M | 100% | High risk74 | —-0.014 |
| 20EB0099CONSTRUCTION OF UMBUYAN ROAD INCLUDING BRIDGE, BRGY. PITOGO, RIZAL, OCCIDENTAL MINDORO STA. 0+000 - STA. 1+700 | Region IV-B | Mindoro Occidental DEO | Completed | ₱49.5M | 100% | High risk74 | —-0.013 |
| 20EB0101CONSTRUCTION OF NALBU ROAD INCLUDING BRIDGE, BRGY. STO. NINO, RIZAL, OCCIDENTAL MINDORO, STA. 0+000 - STA. 2+700 | Region IV-B | Mindoro Occidental DEO | Completed | ₱49.4M | 100% | High risk74 | —-0.014 |
| 24C00564CONVERGENCE & SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF DINADIAWAN-DITAWINI BYPASS ROAD, DINADIAWAN, AURORA (PHASE 3), PROV. OF AUROR | Region III | Region III | On-Going | ₱144M | 72% | High risk74 | —-0.013 |
| 24C00554CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGARM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTION), CONSTRUCTION OF DINGALAN-DONA REMEDIOS TRINIDAD ROAD, AURORA (PHASE 3), PROV. OF AURORA | Region III | Region III | On-Going | ₱144M | 52% | High risk73 | Flagged0.015 |
| 22CN0027CONSTRUCTION OF KABATANGAN RIVER CONTROL, MA. AURORA, AURORA | Region III | Aurora DEO | Completed | ₱87.1M | 100% | High risk72 | —-0.050 |
| 20EB0100CONSTRUCTION OF IBA ROAD INCLUDING BRIDGE, BRGY. PITOGO , RIZAL, OCCIDENTAL MINDORO, STA. 0+000 - STA. 1+600 | Region IV-B | Mindoro Occidental DEO | Completed | ₱45.3M | 100% | High risk72 | —-0.007 |
| 17CN0136CONSTRUCTION OF SERIES OF GROUNDSILL ALONG BAUL RIVER, BRGY. DINADIAWAN, DIPACULAO, AURORA | Region III | Aurora DEO | Completed | ₱49M | 100% | High risk70 | —-0.052 |
| 24C00595CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONST. OF DINGALAN-DONA REMEDIOS TRINIDAD ROAD, AURORA | Region III | Region III | On-Going | ₱46.8M | 98% | High risk70 | —-0.039 |
| 20CN0132CONCRETING OF CULAT - COZO - SAN ILDEFONSO - DALUGAN ROAD, CASIGURAN, AURORA | Region III | Aurora DEO | Completed | ₱49M | 100% | High risk69 | —-0.042 |
| 17B00016MFO 1: NAT'L ROAD NETWORK SERVICES: NETWORK DEV'T: IMPV'T/WIDENING OF NAT'L ROADS OUTSIDE N1 ALONG SANTIAGO-TUGUEGARAO ROAD, K0399+000 TO K0402+440 (STA. 399+000 TO STA. 402+444), QUEZON, ISABELA | Region II | Region II | Completed | ₱125.7M | 100% | High risk68 | —-0.030 |
| 17B00010MFO 1- NATIONAL ROAD NETWORK SERVICES: NETWORK DEV'T: IMP'T/WIDENING OF NAT'L ROADS-OTHER PRIMARY ROADS-SANTIAGO-TUGUEGARAO ROAD, K0419+100- K0423+800=STA. 419+100-STA. 423+816.60, STA. MARIA, ISABELA | Region II | Region II | Completed | ₱139M | 100% | High risk68 | —-0.025 |
| 17DQ0066MFO 2 - FLOOD MANAGEMENT SERVICES - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL ALONG BANCAL RIVER, BRGY. POBLACION II, GMA, CAVITE AND CONSTRUCTION OF FLOOD CONTROL ALONG BANCAL RIVER, BRGY | Region IV-A | Cavite 3rd DEO | Completed | ₱39M | 100% | High risk68 | —-0.033 |
| 20O00032WIDENING OF GENERAL SANTOS AVENUE, BRGY. LOWER BICUTAN TO BRGY. CENTRAL BICUTAN, TAGUIG CITY | National Capital Region | National Capital Region | On-Going | ₱232.6M | 80% | High risk65 | —-0.005 |
| 20O00033CONSTRUCTION OF GENERAL SANTOS AVENUE, BRGY. LOWER BICUTAN TO BRGY. CENTRAL BICUTAN | National Capital Region | National Capital Region | On-Going | ₱148.6M | 90% | High risk65 | —-0.018 |
| 17CN0061REPAIR/REHABILITATION OF CONCRETE ROAD, BRGY. POBLACION, DILASAG, AURORA | Region III | Aurora DEO | Completed | ₱9.9M | 100% | High risk64 | —-0.067 |
| 17EB0070ASSET PRESERVATION OF NATIONAL ROADS - CONSTRUCTION/UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, BULALACAO-SN JOSE-JCT MAPAYA RD - K0220 + 488, K0220 + 689, K0223 + 450, K0224 + 684 - K0227 + 607, S00141MRMAGSAYSAY AND SAN JOSE, OCCIDENTA | Region IV-B | Mindoro Occidental DEO | Completed | ₱48.8M | 100% | High risk62 | —-0.035 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24C00554CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGARM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTION), CONSTRUCTION OF DINGALAN-DONA REMEDIOS TRINIDAD ROAD, AURORA (PHASE 3), PROV. OF AURORA | Region III | Region III | On-Going | ₱144M | 52% | High risk73 | Flagged0.015 |
| 22C00073CONVERGENCE AND SPECIAL SUPPORT PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF DINGALAN-DONA REMEDIOS TRINIDAD ROAD, PROVINCE OF AURORA | Region III | Region III | On-Going | ₱193M | 100% | High risk76 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 22C00072CONVERGENCE & SPECIAL SUPPORT PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONST. OF DINADIAWAN-DITAWINI BYPASS ROAD, DINADIAWAN, AURORA | Region III | Region III | Completed | ₱115.8M | 100% | Medium risk48 | —-0.069 |
| 27 | 22DQ0016BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD (CONGRESSIONAL ROAD), BARANGAY G. DE JESUS, GENERAL MARIANO ALVAREZ, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱29.7M | 100% | Medium risk48 | —-0.105 |
| 28 | 18DQ0036LOCAL PROGRAM - CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS - IMPROVEMENT/ WIDENING OF CONGRESSIONAL AVENUE, INCLUDING RROW, GMA, CAVITE | Region IV-A | Region IV-A | Completed | ₱29.1M | 100% | Medium risk48 | —-0.106 |
| 29 | 21DQ0085LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS - WIDENING OF CONGRESSIONAL AVENUE, GENERAL MARIANO ALVAREZ (GMA), CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱29.4M | 100% | Medium risk48 | —-0.107 |
| 30 | 20DQ0121LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - WIDENING OF CONGRESSIONAL AVENUE, GMA, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱19.8M | 100% | Medium risk47 | —-0.108 |
| 31 | 19DQ0081LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF PAVEMENT, BRGY. CALIMAG TO DACON, GENERAL MARIANO ALVAREZ, CAVITE | Region IV-A | Region IV-A | Completed | ₱9.5M | 100% | Medium risk46 | —-0.109 |
| 32 | 18EB0028BRIDGE PROGRAM - REHAB./MAJOR REPAIR OF PERMANENT BRIDGES, BUSWANGAN BR. (B00089MR) ALONG MINDORO WEST COASTAL RD. CALINTAAN, OCC. MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱50.9M | 100% | Medium risk44 | —-0.046 |
| 33 | 18EB0012ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROADS, MINDORO WEST COASTAL RD - K0335 + 500 - K0337 + 200, K0348 + 250 - K0349 + 000, K0396 + 000 - K0397 + 635 (S00095MR)SABLAYAN, OCCIDE | Region IV-B | Mindoro Occidental DEO | Completed | ₱47.8M | 100% | Medium risk43 | —-0.080 |
| 34 | 19EB0006ROAD WIDENING - ALONG MINDORO ORIENTAL/OCCIDENTAL EAST COASTAL RD (S00094MR) K0218+390 - K0220+428, MAGSAYSAY, OCC. MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱47.5M | 100% | Medium risk43 | —-0.069 |
| 35 | 20EB0105ROAD WQIDENING OF MINDORO WEST COAST RD - K0335 + 032 - K0336 + K0700, BRGY. SAN FRANCISCO, SABLAYAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱49.5M | 100% | Medium risk43 | —-0.082 |
| 36 | 20EB0014ROAD WIDENING ALONG MINDORO WEST COASTAL RD - K0313+892 - K0315+212, SABLAYAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱49M | 100% | Medium risk43 | —-0.085 |
| 37 | 20EB0108REHABILITATION/RECONSTRUCTION OF MINDORO WEST COASTAL RD, K0352 + 342 - K0354 + 030, BRGY. PAG-ASA, SABLAYAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱49M | 100% | Medium risk43 | —-0.088 |
| 38 | 20EB0104CONSTRUCTION OF ROAD, SO. BAGOLAYAG, BRGY. STA. MARIA-BRGY. MANANAO, PALUAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱49.2M | 100% | Medium risk43 | —-0.072 |
| 39 | 20CN0053CONCRETING OF ROAD, BRGY. CULAT, CASIGURAN, AURORA | Region III | Aurora DEO | Completed | ₱47.7M | 100% | Medium risk40 | —-0.087 |
| 40 | 19EB0077WIDENING OF BR. - MATABANG BR. (B00200MR) ALONG MINDORO WEST COASTAL RD., ABRA DE ILOG, OCC. MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱28.6M | 100% | Medium risk40 | —-0.048 |
| 41 | 20CN0107CONCRETING OF CULAT - COZO - SAN ILDEFONSO - DALUGAN ROAD, CASIGURAN, AURORA | Region III | Aurora DEO | Completed | ₱48.5M | 100% | Medium risk40 | —-0.098 |
| 42 | 21CN0114CONSTRUCTION OF COZO-SAN ILDEFONSO ROAD, CASIGURAN, AURORA | Region III | Aurora DEO | Completed | ₱49.5M | 100% | Medium risk40 | —-0.088 |
| 43 | 20EB0107ROAD WIDENING OF MINDORO WEST COASTAL RD - K0398 + 506 - K0400 + 000, BRGY, BALANSAY, MAMBURAO, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱44.1M | 100% | Medium risk40 | —-0.084 |
| 44 | 20EB0106ROAD WIDENING OF MINDORO WEST COASTAL RD - K0396+000 - K0397+507, BRGY. FATIMA, MAMBURAO, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱44.1M | 100% | Medium risk40 | —-0.084 |
| 45 | 18EB0036BRIDGE PROGRAM - CONSTRUCTION OF NEW PERMANENT BRIDGES, SIGMAN BR. ALONG MINDORO WEST COASTAL RD, ABRA DE ILOG, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱20.8M | 100% | Medium risk40 | —-0.048 |
| 46 | 23C00103CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRA PROJS. ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL RDS. &/OR BRS. (OR, RDS. THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONST. OF DINGALAN-DOÑA REMEDIOS TRINIDAD ROAD, PROV. OF AURORA | Region III | Region III | On-Going | ₱84M | 50% | Medium risk39 | —-0.045 |
| 47 | 20C00048LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONCRETING OF ROADS FROM CASIGURAN TOWN PROPER LEADING TO CASAPSAPAN BAY AND CASAPSAPAN TO DINIOG, AURORA | Region III | Region III | Completed | ₱79.2M | 100% | Medium risk39 | —-0.064 |
| 48 | 20EB0103CONCRETING OF JCT NATIONAL HIGHWAY-SO. ANTIPOLO, STA. 0+000 - STA. 1+628, BRGY. MANGARIN, SAN JOSE, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱34.6M | 100% | Medium risk39 | —-0.084 |
| 49 | 20EB0059CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO SABLAYAN PORT, SABLAYAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱44M | 100% | Medium risk39 | —-0.073 |
| 50 | 20EB0109REHABILITATION/RECONSTRUCTION OF JCT MWCR (SN ISIDRO)-PENAL COLONY-JCT YAPANG RD - K0306+432 - K0306+736.94, K0306+925.62 - K0307+294.98, K0308+400 - K0308+918, BRGY. BATONG BUHAY, SABLAYAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱27.7M | 100% | Medium risk37 | —-0.087 |