Contractor dossier
106 projects on file, including joint ventures this contractor is part of.
Total projects
106
Total budget
₱4.4B
Average progress
95.5%
Completion rate
84.0%
Average risk score
46.5
Medium risk on average, out of 100
Flagged as unusual
7
6.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 61 | ₱2.5B | 45.6 | 4 | 94.9% |
| Region I | 44 | ₱1.9B | 47.8 | 3 | 96.3% |
| Region IV-A | 1 | ₱7.9M | 45.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 57 | ₱2B | 46.1 | 1 | 94.4% |
| Flood Control and Drainage | 34 | ₱2B | 46.9 | 4 | 97.0% |
| Buildings and Facilities | 8 | ₱114M | 36.9 | 0 | 100.0% |
| Bridges | 3 | ₱51.4M | 35.8 | 0 | 100.0% |
| GAA 2025 OO-2 | 2 | ₱191M | 65.7 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱36.4M | 91.9 | 1 | 56.3% |
| OTHER | 1 | ₱19.7M | 83.3 | 1 | 90.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AG0010NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - PANGASINAN - ZAMBALES RD - K0325+120 - K0326+140 AT ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | On-Going | ₱36.4M | 56% | High risk92 | Flagged0.014 |
| 25CL0181CONCRETING OF BRGY. STO. NIÑO TO SITIO MAPORAK NEW SAN JUAN FMR, BRGY. STO. NIÑO, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱19.7M | 90% | High risk83 | Flagged0.039 |
| 24CL0208CONSTRUCTION OF REVETMENT ALONG GABOR RIVER, PHASE 1, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 0% | High risk82 | Flagged0.060 |
| 24CL0209CONSTRUCTION OF REVETMENT ALONG GABOR RIVER, PHASE 2, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 100% | High risk82 | Flagged0.034 |
| 25CL0015CONSTRUCTION OF REVETMENT ALONG GABOR RIVER, PHASE 4, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 99% | High risk82 | —-0.021 |
| 24CL0007CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KILING RIVER (PHASE 5), CADMANG SECTION, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk80 | —-0.045 |
| 24CL0018CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TANGUAY RIVER (PHASE 4), CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk80 | —-0.045 |
| 24CL0059CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SANTO TOMAS RIVER (PHASE 6), SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk80 | —-0.045 |
| 24CL0057ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - SN MARCELINO-SN ANTONIO-SN NARCISO RD - K0157+046 -K0158+000, K0159+000 - K0160+000, SAN ANTONIO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.5M | 100% | High risk76 | —-0.050 |
| 24CL0102ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-SN MARCELINO-SN ANTONIO-SN NARCISO RD-K0162+407.72-K0163+000,K0164+000-K0164+404,K0165+000-K0165+705, K0166+286-K0166+639, SAN ANTONIO & SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 99% | High risk75 | —-0.020 |
| 25CL0017CONSTRUCTION OF REVETMENT ALONG GABOR RIVER, PHASE 5, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱47.8M | 100% | High risk74 | —-0.031 |
| 24CL0151ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - TERTIARY ROADS AMUNGAN-PALAUIG-BANLOG RD - K0213+878 - K0215+551, K0216+532 - K0217+077, K0223+000 - K0223+550, PALAUIG, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk73 | —-0.047 |
| 24CL0042REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - OLONGAPO-BUGALLON RD - K0190 + 017 - K0191 + 000, K0193 + 718 - K0194 + 000, K0196 + 050 - K0197 + 000, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱69.9M | 100% | High risk73 | —-0.057 |
| 25CL0180CONCRETING OF BRGY, CADMANG BACULI FMR, BRGY. CADMANG BACULI, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱19.7M | 0% | High risk69 | Flagged0.042 |
| 17CD0074ASSET PRESERVATION OF NATIONAL ROADS CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG MUZON - TUNGKONG MANGGA ROAD K0042+823 - K0044+350; K0043+256 - K0043+316 | Region III | Bulacan 2nd DEO | Completed | ₱14M | 100% | High risk69 | —-0.070 |
| 25CL0129CONSTRUCTION OF CANIAN- DOLORES ROAD, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱9.8M | 0% | High risk69 | —-0.010 |
| 24CL0159CONSTRUCTION OF CANIAN ROAD, BRGY. DOLORES, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱9.7M | 100% | High risk69 | —-0.062 |
| 25CL0111ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS OLONGAPO-BUGALLON RD - K0256 + 658 - K0258 + 000, K0261 + 750 - K0262 + 000, STA. CRUZ, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱48.3M | 100% | High risk69 | —-0.036 |
| 25AG0029FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ALAMINOS RIVER, AMANDIEGO SECTION, BARANGAY AMANDIEGO, ALAMINOS CITY,PANG | Region I | Pangasinan 1st DEO | Completed | ₱95.5M | 100% | High risk69 | —-0.024 |
| 25AG0028FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF RIVERBANK PROTECTION ALONG BALINGCAGUING RIVER, BANGAN-ODA SECTION (SEGMENT B),BRGY. BANGAN-ODA, AGNO,PANG | Region I | Pangasinan 1st DEO | Completed | ₱95.5M | 100% | High risk62 | —-0.024 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CL0208CONSTRUCTION OF REVETMENT ALONG GABOR RIVER, PHASE 1, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 0% | High risk82 | Flagged0.060 |
| 25CL0180CONCRETING OF BRGY, CADMANG BACULI FMR, BRGY. CADMANG BACULI, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱19.7M | 0% | High risk69 | Flagged0.042 |
| 25CL0181CONCRETING OF BRGY. STO. NIÑO TO SITIO MAPORAK NEW SAN JUAN FMR, BRGY. STO. NIÑO, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱19.7M | 90% | High risk83 | Flagged0.039 |
| 24CL0209CONSTRUCTION OF REVETMENT ALONG GABOR RIVER, PHASE 2, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 100% | High risk82 | Flagged0.034 |
| 25AG0010NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - PANGASINAN - ZAMBALES RD - K0325+120 - K0326+140 AT ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | On-Going | ₱36.4M | 56% | High risk92 | Flagged0.014 |
| 24AG0182FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVERBANK PROTECTION ALONG BALINGCAGUING RIVER, ANAPAO SECTION (SEGMENT A), BARANGAY ANAPAO, BURGOS, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | Medium risk59 | Flagged0.005 |
| 24AG0183FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVERBANK PROTECTION ALONG BALINGCAGUING RIVER, ANAPAO SECTION (SEGMENT B), BARANGAY ANAPAO, BURGOS, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | Medium risk59 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 18CL0098CONSTRUCTION OF MULTI-PURPOSE BUILDING (FACULTY AND STUDENT CENTER), STA. CRUZ NORTH CENTRAL ELEMENTARY SCHOOL, POBLACION SOUTH, STA. CRUZ, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱14.6M | 100% | Medium risk34 | —-0.093 |
| 77 | 22CL0081CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL STRUCTURE ALONG TAMBAK RIVER (UPSTREAM), PHASE 6, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱49.5M | 100% | Medium risk34 | —-0.085 |
| 78 | 23CL0058CONSTRUCTION OF TANGUAY RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 3, BARANGAY STO NIÑO, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱49M | 100% | Medium risk33 | —-0.086 |
| 79 | 19CL0065CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TUBO-TUBO NORTH, MUNICIPALITY OF SANTA CRUZ, PROVINCE OF ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱4.9M | 100% | Medium risk33 | —-0.094 |
| 80 | 22CL0076UPGRADING OF CANIAN-DOLORES ROAD, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱9.9M | 100% | Medium risk33 | —-0.097 |
| 81 | 22CL0075CONSTRUCTION OF ROAD, BRGY. MABANGLIT, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱9.6M | 100% | Medium risk33 | —-0.097 |
| 82 | 19CL0075CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY PAUDPOD, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱4.9M | 100% | Medium risk33 | —-0.099 |
| 83 | 19CL0076CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY BELBEL, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱4.9M | 100% | Medium risk33 | —-0.099 |
| 84 | 23CL0103IMPROVEMENT OF NAMNEL ROAD, BRGY. SAN JUAN, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱9.7M | 100% | Medium risk32 | —-0.097 |
| 85 | 22CL0031CONSTRUCTION OF ROAD AT BARANGAY BENEG, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱4.8M | 100% | Medium risk32 | —-0.096 |
| 86 | 21CL0051CONSTRUCTION OF ROAD, PAMALABAGAN, SANTIAGO, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱9.5M | 100% | Medium risk32 | —-0.097 |
| 87 | 20CL0077IMPROVEMENT OF NAMNEL ROAD IN BRGY. SAN JUAN, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱9.4M | 100% | Medium risk32 | —-0.097 |
| 88 | 24CJ0202CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION AND ROAD COMPONENT ALONG INERANGAN RIVER (SEGMENT O), RAMOS, TARLAC | Region III | Tarlac DEO | Completed | ₱50M | 100% | Medium risk32 | —-0.088 |
| 89 | 18CL0026REHABILITATION/ IMPROVEMENT OF LAUIS RIVER WITH SLOPE PROTECTION WORKS, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱28.2M | 100% | Medium risk32 | —-0.083 |
| 90 | 19CL0003RAISING OF GRADE OF SLOPE PROTECTION ALONG BUCAO RIVER, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱15.5M | 100% | Medium risk31 | —-0.087 |
| 91 | 20CL0007CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL ALONG BANCAL RIVER (CABATUHAN PHASE 2), UPSTREAM, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱17.6M | 100% | Medium risk31 | —-0.087 |
| 92 | 20CL0003CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL AT MARANGLA, PALAUIG, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱31.5M | 100% | Medium risk31 | —-0.085 |
| 93 | 21CL0036CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL FACILITIES AT TAMBAK RIVER PHASE 3, UPSTREAM, STA. 0+869.55 - STA. 1 + 012.55, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱29.5M | 100% | Medium risk31 | —-0.086 |
| 94 | 22CL0079CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TAMBAK RIVER (UPSTREAM), PHASE III, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱37.6M | 100% | Medium risk31 | —-0.086 |
| 95 | 22CL0073CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TAMBAK RIVER (UPSTREAM), PHASE II, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱39.3M | 100% | Medium risk31 | —-0.086 |
| 96 | 18CL0025CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL, BAYTO RIVER CONTROL, NORTH APPROACH, STA. CRUZ, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱18.8M | 100% | Medium risk31 | —-0.083 |
| 97 | 21CL0092CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL, BRGY. POONBATO, MUNICIPALITY OF BOTOLAN, PROVINCE OF ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱24.8M | 100% | Medium risk31 | —-0.087 |
| 98 | 21CL0100CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL AT STO. TOMAS RIVER, UPSTREAM, SOUTH APPROACH, STA. 0+569 - STA. 1+269, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱39.2M | 100% | Medium risk31 | —-0.087 |
| 99 | 17AG0069CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS (COLOS BOA BR. BOO710LZ) AT PANGASINAN- | Region I | Pangasinan 1st DEO | Completed | ₱3.5M | 100% | Medium risk31 | —-0.021 |
| 100 | 18CL0023CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL ALONG PAMATAWAN RIVER, PHASE IV, STA. 1+369.50- STA. 2+051, SAN ANTONIO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱38.2M | 100% | Medium risk31 | —-0.087 |