Contractor dossier
350 projects on file, including joint ventures this contractor is part of.
Total projects
350
Total budget
₱11.9B
Average progress
93.3%
Completion rate
78.6%
Average risk score
51.3
Medium risk on average, out of 100
Flagged as unusual
25
7.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 343 | ₱11.5B | 51.2 | 25 | 93.2% |
| Region II | 5 | ₱238.8M | 57.4 | 0 | 94.3% |
| National Capital Region | 1 | ₱38.4M | 46.0 | 0 | 100.0% |
| Region III | 1 | ₱45.1M | 34.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 141 | ₱4.9B | 48.3 | 3 | 94.2% |
| Flood Control and Drainage | 66 | ₱2.7B | 48.4 | 1 | 96.9% |
| Bridges | 64 | ₱1.8B | 47.7 | 3 | 94.4% |
| Buildings and Facilities | 37 | ₱484.3M | 46.9 | 0 | 96.6% |
| OTHER | 16 | ₱864.9M | 78.6 | 6 | 90.8% |
| GAA 2025 OO-1 | 10 | ₱634.2M | 91.7 | 8 | 44.4% |
| Water Provision and Storage | 8 | ₱49.4M | 33.8 | 0 | 100.0% |
| GAA 2025 OO-2 | 4 | ₱291.4M | 91.2 | 1 | 71.7% |
| GAA 2025 SSP | 3 | ₱97.5M | 95.8 | 3 | 90.5% |
| Bridges, Roads | 1 | ₱24M | 48.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25II0029REHAB. OF ROAD, DOÑA ANECITA-DALE ROAD, NORTHERN SAMAR, SECOND DISTRICT, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | On-Going | ₱57.9M | 73% | High risk96 | Flagged0.015 |
| 25II0033CONSTRUCTION OF ROAD, BRGY. VIGO TO BRGY. ATIPOLO, LAOANG, NORTHERN SAMAR, NORTHERN SAMAR 2ND DISTYRICT | Region VIII | Northern Samar 2nd DEO | On-Going | ₱19.6M | 99% | High risk96 | Flagged0.008 |
| 25I00064SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0758+000 - K0758+200, K0758+600 - K0758+690, K | Region VIII | Region VIII | On-Going | ₱20M | 100% | High risk96 | Flagged0.004 |
| 25I00176NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BASEY-MAYDOLONG, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱235.5M | 6% | High risk95 | Flagged0.050 |
| 25I00094ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0753+635 - K0754+125, K0754+305 - K0755+059, K0759+900 - K0760+200, K0760+220 - K0760+640 | Region VIII | Region VIII | On-Going | ₱86.8M | 33% | High risk95 | Flagged0.016 |
| 25IB0005CONSTRUCTION OF NEW PERMANENT BRIDGE PAGNAMITAN (S00188SM) BR., ALONG GUIUAN - SULANGAN PENINSULA RD. | Region VIII | Eastern Samar DEO | On-Going | ₱94.4M | 30% | High risk95 | Flagged0.022 |
| 25IB0086REPLACEMENT OF PERMANENT WEAK BRIDGE LAWAAN BR. II (B00510SM) JCT. BUENAVISTA - LAWAAN - MARABUT RD | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 33% | High risk94 | Flagged0.010 |
| 25IH0019CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAROYONDOYON CREEK & KAGLANGKOY CREEK, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱144.7M | 43% | High risk94 | Flagged0.012 |
| 25I00124ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0701+490 - K0701+565 | Region VIII | Region VIII | On-Going | ₱33.7M | 80% | High risk93 | —-0.002 |
| 25I00091BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES - CAAGUIT-ITAN BR. 3 (B00240SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) | Region VIII | Region VIII | On-Going | ₱30.9M | 32% | High risk93 | Flagged0.009 |
| 25I00135BRIDGE - WIDENING OF PERMANENT BRIDGES - MINLAWAAN BR (B00344SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) | Region VIII | Region VIII | On-Going | ₱28.9M | 21% | High risk93 | Flagged0.013 |
| 25IK0039BRIDGE P563) ALONG WRIGHT - TAFT - BORONGAN RD, PARANAS, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱44.1M | 64% | High risk93 | Flagged0.006 |
| 25I00110ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROAS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0697+(-124) - K0697+(-054), SAMAR 1ST LD | Region VIII | Region VIII | On-Going | ₱24.1M | 46% | High risk92 | Flagged0.008 |
| 25IJ0006OO2: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GANDARA RIVER, PHASE II, BARANGAY TAWIRAN, GANDARA, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱48.7M | 100% | High risk91 | —-0.019 |
| 24IH0111CONSTRUCTION OF SEAWALL, VICTORIA, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.5M | 76% | High risk91 | Flagged0.059 |
| 25II0018CONSTRUCTION OF GAMAY FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM, GAMAY RIVER BASIN, GAMAY, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | On-Going | ₱49M | 63% | High risk91 | —-0.004 |
| 25BA0015ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINSTMAJOR FLOODS- FLOOD MANAGEMENT PROGRAM:CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:CONSTRUCTION OF GUARDWALL ALONG AIRPORT-MAUYEN PORT ROAD, ITBAYAT, BATANES | Region II | Batanes DEO | On-Going | ₱49M | 81% | High risk90 | —-0.003 |
| 25II0056CONCRETING OF BRGY. BANGON TO BRGY. BONIFACIO FMR, BRGY. BANGON AND BRGY. BONIFACIO, GAMAY, NORTHERN SAMAR 2ND DISTRICT | Region VIII | Northern Samar 2nd DEO | On-Going | ₱14.9M | 62% | High risk90 | Flagged0.056 |
| 24I00056NETWORKDEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (S00223LT) - K1018+620 - K1018+710, K1024+000 - K1024+231, K1039+088 - K1039+236, K1039+379 - K1041+595, K1043+128 - K1043+220 | Region VIII | Region VIII | On-Going | ₱174.5M | 80% | High risk84 | Flagged0.029 |
| 24I00276ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR) - K0680+(-106) - K0680+088, K0688+410 - K0688+570, NORTHERN SAMAR 1ST LD | Region VIII | Region VIII | On-Going | ₱96.2M | 74% | High risk82 | Flagged0.008 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IH0111CONSTRUCTION OF SEAWALL, VICTORIA, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.5M | 76% | High risk91 | Flagged0.059 |
| 25II0056CONCRETING OF BRGY. BANGON TO BRGY. BONIFACIO FMR, BRGY. BANGON AND BRGY. BONIFACIO, GAMAY, NORTHERN SAMAR 2ND DISTRICT | Region VIII | Northern Samar 2nd DEO | On-Going | ₱14.9M | 62% | High risk90 | Flagged0.056 |
| 25I00176NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BASEY-MAYDOLONG, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱235.5M | 6% | High risk95 | Flagged0.050 |
| 24I00056NETWORKDEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (S00223LT) - K1018+620 - K1018+710, K1024+000 - K1024+231, K1039+088 - K1039+236, K1039+379 - K1041+595, K1043+128 - K1043+220 | Region VIII | Region VIII | On-Going | ₱174.5M | 80% | High risk84 | Flagged0.029 |
| 18IH0022WIDENING OF PERMANENT BRIDGES NAHIBANG BRIDGE (B00292SM) ALONG ALLEN - CATARMAN RD, BOBON, N. SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱17.9M | 49% | Medium risk49 | Flagged0.024 |
| 25IB0005CONSTRUCTION OF NEW PERMANENT BRIDGE PAGNAMITAN (S00188SM) BR., ALONG GUIUAN - SULANGAN PENINSULA RD. | Region VIII | Eastern Samar DEO | On-Going | ₱94.4M | 30% | High risk95 | Flagged0.022 |
| 25I00094ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0753+635 - K0754+125, K0754+305 - K0755+059, K0759+900 - K0760+200, K0760+220 - K0760+640 | Region VIII | Region VIII | On-Going | ₱86.8M | 33% | High risk95 | Flagged0.016 |
| 25II0029REHAB. OF ROAD, DOÑA ANECITA-DALE ROAD, NORTHERN SAMAR, SECOND DISTRICT, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | On-Going | ₱57.9M | 73% | High risk96 | Flagged0.015 |
| 23IJ0025WIDENING OF PERMANENT BRIDGES, CABACUNGAN BR. (B00367SM) ALONG CALBAYOG - CATARMAN ROAD | Region VIII | Samar 1st DEO | On-Going | ₱48.3M | 77% | High risk80 | Flagged0.013 |
| 25I00135BRIDGE - WIDENING OF PERMANENT BRIDGES - MINLAWAAN BR (B00344SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) | Region VIII | Region VIII | On-Going | ₱28.9M | 21% | High risk93 | Flagged0.013 |
| 25IH0019CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAROYONDOYON CREEK & KAGLANGKOY CREEK, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱144.7M | 43% | High risk94 | Flagged0.012 |
| 18II0063CONSTRUCTION OF MISSING LINKS/NEW ROADS, ARTECHE - BRGY. CATUMSAN - JIPAPAD - LAS NAVAS - CATUBIG - RAWIS ROAD (NORTHERN SAMAR SIDE), INCL. ROW, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Terminated | ₱14.5M | 100% | High risk79 | Flagged0.011 |
| 25IB0086REPLACEMENT OF PERMANENT WEAK BRIDGE LAWAAN BR. II (B00510SM) JCT. BUENAVISTA - LAWAAN - MARABUT RD | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 33% | High risk94 | Flagged0.010 |
| 18IH0026ROAD WIDENING - ALLEN OLD ROAD - K0697+452 - K0698+519, ALLEN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱27.7M | 0% | Medium risk49 | Flagged0.010 |
| 24IH0102CONCRETING OF BRGY. CAHICSAN - BRGY. CAGMANABA ROAD - BRGY. CAHICSAN, CAGMANABA, MONDRAGON, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱68.6M | 76% | Medium risk58 | Flagged0.010 |
| 25I00091BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES - CAAGUIT-ITAN BR. 3 (B00240SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) | Region VIII | Region VIII | On-Going | ₱30.9M | 32% | High risk93 | Flagged0.009 |
| 22IK0089CONSTRUCTION OF BRIDGE, BRGY. SAN ANDRES, VILLAREAL, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱28.8M | 50% | Medium risk50 | Flagged0.008 |
| 24I00276ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR) - K0680+(-106) - K0680+088, K0688+410 - K0688+570, NORTHERN SAMAR 1ST LD | Region VIII | Region VIII | On-Going | ₱96.2M | 74% | High risk82 | Flagged0.008 |
| 25I00110ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROAS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0697+(-124) - K0697+(-054), SAMAR 1ST LD | Region VIII | Region VIII | On-Going | ₱24.1M | 46% | High risk92 | Flagged0.008 |
| 25II0033CONSTRUCTION OF ROAD, BRGY. VIGO TO BRGY. ATIPOLO, LAOANG, NORTHERN SAMAR, NORTHERN SAMAR 2ND DISTYRICT | Region VIII | Northern Samar 2nd DEO | On-Going | ₱19.6M | 99% | High risk96 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 226 | 19II0026CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION, STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF GAMAY RIVER CONTROL, GAMAY, RIVER BASIN, GAMAY, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱47M | 100% | Medium risk48 | —-0.079 |
| 227 | 25I00118NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0705+167 - K0705+308, K0705+494 - K0705+607, K0705+607 - K0705+724 | Region VIII | Region VIII | On-Going | ₱12.9M | 100% | Medium risk48 | —-0.063 |
| 228 | 18II0058REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, CATARMAN-LAOANG ROAD, K0766+283 - K0766+492, K0766+639 - K0766+889, K0767+151 - K0767+705, K0767+775.0 - K0767+916.00, SAN ROQUE, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱45.9M | 100% | Medium risk48 | —-0.094 |
| 229 | 22IJ0049OO1: ROAD WIDENING, CALBAYOG - CATARMAN RD., KO809+164.20-KO809+801, CALBAYOG CITY,SAMAR | Region VIII | Samar 1st DEO | Completed | ₱22.3M | 100% | Medium risk48 | —-0.094 |
| 230 | 23IJ0062CSSP: CONSTRUCTION OF ROAD, BARANGAY LAPAZ - BARANGAY PATONG, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱24.3M | 73% | Medium risk48 | —-0.038 |
| 231 | 19II0013ROAD WIDENING, TERTIARY ROADS, ARTECHE - JIPAPAD - LAS NAVAS ROAD, K0812+807 - K0813+000, K0813+650 - K0813+800, K0814+323 - K0815+005, 2ND DISTRICT, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱37.5M | 100% | Medium risk48 | —-0.094 |
| 232 | 22IJ0062(RE-ADVERTISE OO1: REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,SLOPE COLLAPSE LANDSLIDE-SECONDARY ROADS (CALBAYOG-CATARMAN RD) KO790+000-KO790+018, KO790+236-KO790+256 | Region VIII | Samar 1st DEO | Completed | ₱19.6M | 100% | Medium risk48 | —-0.094 |
| 233 | 23IJ0008OO1: REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, CALBAYOG - CATARMAN RD. K0785+712 - K0785+761.5, K0786+743 - K0786+860 | Region VIII | Samar 1st DEO | Completed | ₱20.7M | 100% | Medium risk48 | —-0.094 |
| 234 | 22II0054REHABILITATION OF SEAWALL, BRGY. DEL NORTE, LAPINIG, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.079 |
| 235 | 24IC0086REHABILITATION OF ROAD, BRGY. SAN ISIDRO, ALANGALANG, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱6.8M | 100% | Medium risk48 | —-0.096 |
| 236 | 22II0037RETROFITTING/STRENGTHENING OF BRIDGES, PAMBUJAN BR. (B00299SM) ALONG CATARMAN-LAOANG RD., PAMBUJAN, N. SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱29.4M | 100% | Medium risk48 | —-0.057 |
| 237 | 20II0021WIDENING OF PERMANENT BRIDGES, CAMPARANGA BR. ALONG (B00302SM), CATARMAN - LAOANG RD., PAMBUJAN, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱46.1M | 100% | Medium risk48 | —-0.054 |
| 238 | 24BA0025ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS; FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF SEA WALL AT IVANA SHELTER PORT, IVANA, BATANES | Region II | Batanes DEO | On-Going | ₱39.2M | 99% | Medium risk48 | —-0.027 |
| 239 | 24II0079CONCRETING OF BRGY. BONIFACIO-BRGY. LONOY FMR, PHASE III, GAMAY, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱14.9M | 100% | Medium risk48 | —-0.039 |
| 240 | 20II0064CONCRETING OF BRGY. BANGON TO BRGY. BONIFACIO TO BRGY. LONOY FRM, BRGY. BANGON, BRGY. BONIFACIO & LONOY, GAMAY, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱24.1M | 100% | Medium risk48 | —-0.037 |
| 241 | 22II0038REHABILITATION/MAJOR REPAIR OF PERMANENTBRIDGES, PALAPAG BR. (B00552SM) ALONG PANGPANG-PALAPAG-MAPANAS-GAMAY-LAPINIG RD, PALAPAG, N. SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱29.4M | 100% | Medium risk48 | —-0.053 |
| 242 | 20IK0043CONSTURCTION OF CALBIGA FLOOD CONTROL ALONG CALBIGA RIVER, CALBIGA, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱36.8M | 100% | Medium risk47 | —-0.079 |
| 243 | 22IK0033CONSTRUCTION OF FLOOD CONTROL STRUCTURE SILAGA BRUDGE ALONG DAANG MAHARLIKA, BRGY. TULAY, STA. RITA, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.080 |
| 244 | 18IK0042CONST. OF FLOOD CONTROL PROTECTION WORKS STRUCTURE, POLANGI BRIDGE ALONG DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BR) | Region VIII | Samar 2nd DEO | Completed | ₱14.3M | 100% | Medium risk47 | —-0.078 |
| 245 | 25II0014RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, OPONG BR.2 (B00323SM) ALONG RAWIS-CATUBIG RD., CATUBIG, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱6.8M | 100% | Medium risk47 | —-0.054 |
| 246 | 22IH0080CONSTRUCTION OF ACCESS ROADS LEADING TO DALAKIT - TAMBURUSAN-BOBON COASTAL BOULEVARD, BRGY. DALAKIT (POBLACION), CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱7.2M | 100% | Medium risk47 | —-0.093 |
| 247 | 21II0027CONSTRUCTION OF BANGON - MALIDONG - CADEAN - GUIBWANGAN - CADAC-AN ROAD, GAMAY, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱28.4M | 100% | Medium risk47 | —-0.092 |
| 248 | 20IH0019REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVEMENT - DAANG MAHARLIKA (SM) (SAN ISIDRO - SAN JUANICO BR.) K0689+346 - K0689+574.40, K0689+773 - K0690+000, SAN ISIDRO, N. SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱9.2M | 100% | Medium risk47 | —-0.094 |
| 249 | 18IK0064CONST./EXTENSION OF FLOOD CONTROL STRUCTURE, SILAGA BRIDGE ALONG DAANG MAHARLIKA, BRGY. TULAY, STA. RITA, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱19M | 95% | Medium risk47 | —-0.000 |
| 250 | 22IK0022CONSTRUCTION OF FLOOD CONTROL PROTECTION WORKS STRUCTURE, BICAL BRIDGE ALONG SAN JUANICO - BASEY - SOHOTON ROAD, STA. RITA, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱21.9M | 100% | Medium risk47 | —-0.019 |