Contractor dossier
350 projects on file, including joint ventures this contractor is part of.
Total projects
350
Total budget
₱11.9B
Average progress
93.3%
Completion rate
78.6%
Average risk score
51.3
Medium risk on average, out of 100
Flagged as unusual
25
7.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 343 | ₱11.5B | 51.2 | 25 | 93.2% |
| Region II | 5 | ₱238.8M | 57.4 | 0 | 94.3% |
| National Capital Region | 1 | ₱38.4M | 46.0 | 0 | 100.0% |
| Region III | 1 | ₱45.1M | 34.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 141 | ₱4.9B | 48.3 | 3 | 94.2% |
| Flood Control and Drainage | 66 | ₱2.7B | 48.4 | 1 | 96.9% |
| Bridges | 64 | ₱1.8B | 47.7 | 3 | 94.4% |
| Buildings and Facilities | 37 | ₱484.3M | 46.9 | 0 | 96.6% |
| OTHER | 16 | ₱864.9M | 78.6 | 6 | 90.8% |
| GAA 2025 OO-1 | 10 | ₱634.2M | 91.7 | 8 | 44.4% |
| Water Provision and Storage | 8 | ₱49.4M | 33.8 | 0 | 100.0% |
| GAA 2025 OO-2 | 4 | ₱291.4M | 91.2 | 1 | 71.7% |
| GAA 2025 SSP | 3 | ₱97.5M | 95.8 | 3 | 90.5% |
| Bridges, Roads | 1 | ₱24M | 48.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25II0029REHAB. OF ROAD, DOÑA ANECITA-DALE ROAD, NORTHERN SAMAR, SECOND DISTRICT, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | On-Going | ₱57.9M | 73% | High risk96 | Flagged0.015 |
| 25II0033CONSTRUCTION OF ROAD, BRGY. VIGO TO BRGY. ATIPOLO, LAOANG, NORTHERN SAMAR, NORTHERN SAMAR 2ND DISTYRICT | Region VIII | Northern Samar 2nd DEO | On-Going | ₱19.6M | 99% | High risk96 | Flagged0.008 |
| 25I00064SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0758+000 - K0758+200, K0758+600 - K0758+690, K | Region VIII | Region VIII | On-Going | ₱20M | 100% | High risk96 | Flagged0.004 |
| 25I00176NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BASEY-MAYDOLONG, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱235.5M | 6% | High risk95 | Flagged0.050 |
| 25I00094ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0753+635 - K0754+125, K0754+305 - K0755+059, K0759+900 - K0760+200, K0760+220 - K0760+640 | Region VIII | Region VIII | On-Going | ₱86.8M | 33% | High risk95 | Flagged0.016 |
| 25IB0005CONSTRUCTION OF NEW PERMANENT BRIDGE PAGNAMITAN (S00188SM) BR., ALONG GUIUAN - SULANGAN PENINSULA RD. | Region VIII | Eastern Samar DEO | On-Going | ₱94.4M | 30% | High risk95 | Flagged0.022 |
| 25IB0086REPLACEMENT OF PERMANENT WEAK BRIDGE LAWAAN BR. II (B00510SM) JCT. BUENAVISTA - LAWAAN - MARABUT RD | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 33% | High risk94 | Flagged0.010 |
| 25IH0019CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAROYONDOYON CREEK & KAGLANGKOY CREEK, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱144.7M | 43% | High risk94 | Flagged0.012 |
| 25I00124ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0701+490 - K0701+565 | Region VIII | Region VIII | On-Going | ₱33.7M | 80% | High risk93 | —-0.002 |
| 25I00091BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES - CAAGUIT-ITAN BR. 3 (B00240SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) | Region VIII | Region VIII | On-Going | ₱30.9M | 32% | High risk93 | Flagged0.009 |
| 25I00135BRIDGE - WIDENING OF PERMANENT BRIDGES - MINLAWAAN BR (B00344SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) | Region VIII | Region VIII | On-Going | ₱28.9M | 21% | High risk93 | Flagged0.013 |
| 25IK0039BRIDGE P563) ALONG WRIGHT - TAFT - BORONGAN RD, PARANAS, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱44.1M | 64% | High risk93 | Flagged0.006 |
| 25I00110ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROAS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0697+(-124) - K0697+(-054), SAMAR 1ST LD | Region VIII | Region VIII | On-Going | ₱24.1M | 46% | High risk92 | Flagged0.008 |
| 25IJ0006OO2: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GANDARA RIVER, PHASE II, BARANGAY TAWIRAN, GANDARA, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱48.7M | 100% | High risk91 | —-0.019 |
| 24IH0111CONSTRUCTION OF SEAWALL, VICTORIA, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.5M | 76% | High risk91 | Flagged0.059 |
| 25II0018CONSTRUCTION OF GAMAY FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM, GAMAY RIVER BASIN, GAMAY, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | On-Going | ₱49M | 63% | High risk91 | —-0.004 |
| 25BA0015ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINSTMAJOR FLOODS- FLOOD MANAGEMENT PROGRAM:CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:CONSTRUCTION OF GUARDWALL ALONG AIRPORT-MAUYEN PORT ROAD, ITBAYAT, BATANES | Region II | Batanes DEO | On-Going | ₱49M | 81% | High risk90 | —-0.003 |
| 25II0056CONCRETING OF BRGY. BANGON TO BRGY. BONIFACIO FMR, BRGY. BANGON AND BRGY. BONIFACIO, GAMAY, NORTHERN SAMAR 2ND DISTRICT | Region VIII | Northern Samar 2nd DEO | On-Going | ₱14.9M | 62% | High risk90 | Flagged0.056 |
| 24I00056NETWORKDEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (S00223LT) - K1018+620 - K1018+710, K1024+000 - K1024+231, K1039+088 - K1039+236, K1039+379 - K1041+595, K1043+128 - K1043+220 | Region VIII | Region VIII | On-Going | ₱174.5M | 80% | High risk84 | Flagged0.029 |
| 24I00276ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR) - K0680+(-106) - K0680+088, K0688+410 - K0688+570, NORTHERN SAMAR 1ST LD | Region VIII | Region VIII | On-Going | ₱96.2M | 74% | High risk82 | Flagged0.008 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IH0111CONSTRUCTION OF SEAWALL, VICTORIA, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.5M | 76% | High risk91 | Flagged0.059 |
| 25II0056CONCRETING OF BRGY. BANGON TO BRGY. BONIFACIO FMR, BRGY. BANGON AND BRGY. BONIFACIO, GAMAY, NORTHERN SAMAR 2ND DISTRICT | Region VIII | Northern Samar 2nd DEO | On-Going | ₱14.9M | 62% | High risk90 | Flagged0.056 |
| 25I00176NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BASEY-MAYDOLONG, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱235.5M | 6% | High risk95 | Flagged0.050 |
| 24I00056NETWORKDEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (S00223LT) - K1018+620 - K1018+710, K1024+000 - K1024+231, K1039+088 - K1039+236, K1039+379 - K1041+595, K1043+128 - K1043+220 | Region VIII | Region VIII | On-Going | ₱174.5M | 80% | High risk84 | Flagged0.029 |
| 18IH0022WIDENING OF PERMANENT BRIDGES NAHIBANG BRIDGE (B00292SM) ALONG ALLEN - CATARMAN RD, BOBON, N. SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱17.9M | 49% | Medium risk49 | Flagged0.024 |
| 25IB0005CONSTRUCTION OF NEW PERMANENT BRIDGE PAGNAMITAN (S00188SM) BR., ALONG GUIUAN - SULANGAN PENINSULA RD. | Region VIII | Eastern Samar DEO | On-Going | ₱94.4M | 30% | High risk95 | Flagged0.022 |
| 25I00094ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0753+635 - K0754+125, K0754+305 - K0755+059, K0759+900 - K0760+200, K0760+220 - K0760+640 | Region VIII | Region VIII | On-Going | ₱86.8M | 33% | High risk95 | Flagged0.016 |
| 25II0029REHAB. OF ROAD, DOÑA ANECITA-DALE ROAD, NORTHERN SAMAR, SECOND DISTRICT, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | On-Going | ₱57.9M | 73% | High risk96 | Flagged0.015 |
| 23IJ0025WIDENING OF PERMANENT BRIDGES, CABACUNGAN BR. (B00367SM) ALONG CALBAYOG - CATARMAN ROAD | Region VIII | Samar 1st DEO | On-Going | ₱48.3M | 77% | High risk80 | Flagged0.013 |
| 25I00135BRIDGE - WIDENING OF PERMANENT BRIDGES - MINLAWAAN BR (B00344SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) | Region VIII | Region VIII | On-Going | ₱28.9M | 21% | High risk93 | Flagged0.013 |
| 25IH0019CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAROYONDOYON CREEK & KAGLANGKOY CREEK, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱144.7M | 43% | High risk94 | Flagged0.012 |
| 18II0063CONSTRUCTION OF MISSING LINKS/NEW ROADS, ARTECHE - BRGY. CATUMSAN - JIPAPAD - LAS NAVAS - CATUBIG - RAWIS ROAD (NORTHERN SAMAR SIDE), INCL. ROW, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Terminated | ₱14.5M | 100% | High risk79 | Flagged0.011 |
| 25IB0086REPLACEMENT OF PERMANENT WEAK BRIDGE LAWAAN BR. II (B00510SM) JCT. BUENAVISTA - LAWAAN - MARABUT RD | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 33% | High risk94 | Flagged0.010 |
| 18IH0026ROAD WIDENING - ALLEN OLD ROAD - K0697+452 - K0698+519, ALLEN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱27.7M | 0% | Medium risk49 | Flagged0.010 |
| 24IH0102CONCRETING OF BRGY. CAHICSAN - BRGY. CAGMANABA ROAD - BRGY. CAHICSAN, CAGMANABA, MONDRAGON, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱68.6M | 76% | Medium risk58 | Flagged0.010 |
| 25I00091BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES - CAAGUIT-ITAN BR. 3 (B00240SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) | Region VIII | Region VIII | On-Going | ₱30.9M | 32% | High risk93 | Flagged0.009 |
| 22IK0089CONSTRUCTION OF BRIDGE, BRGY. SAN ANDRES, VILLAREAL, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱28.8M | 50% | Medium risk50 | Flagged0.008 |
| 24I00276ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR) - K0680+(-106) - K0680+088, K0688+410 - K0688+570, NORTHERN SAMAR 1ST LD | Region VIII | Region VIII | On-Going | ₱96.2M | 74% | High risk82 | Flagged0.008 |
| 25I00110ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROAS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0697+(-124) - K0697+(-054), SAMAR 1ST LD | Region VIII | Region VIII | On-Going | ₱24.1M | 46% | High risk92 | Flagged0.008 |
| 25II0033CONSTRUCTION OF ROAD, BRGY. VIGO TO BRGY. ATIPOLO, LAOANG, NORTHERN SAMAR, NORTHERN SAMAR 2ND DISTYRICT | Region VIII | Northern Samar 2nd DEO | On-Going | ₱19.6M | 99% | High risk96 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 18II0045CONSTRUCTION OF BY-PASS ROAD AND DIVERSION ROADS LAPINIG BY-PASS ROAD, NORTHERN SAMAR, LAPINIG, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱46.1M | 100% | High risk76 | —-0.036 |
| 27 | 18II0020CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, GAMAY BY-PASS ROAD, GAMAY, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱45.6M | 100% | High risk76 | —-0.036 |
| 28 | 17II0013REHAB./RECONST. OF NATL. ROADS W/ SLIPS, SLOPE COLLAPSE AND LANDLIDE, SECONDARY ROADS, PANGPANG-PALAPAG-MAPANAS-GAMAY-LAPINIG ROAD,K0831+150-K0831+193, K0835+482-K0835+512, K0840+070-K0840+117-K0824+(-536),K0824+(-443), 2ND DIST., N. SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱12.6M | 100% | High risk75 | —-0.029 |
| 29 | 18IH0028ROAD WIDENING - ALLEN OLD RD INCL. ROW - CHAINAGE 0 (S00041SM) - CHAINAGE 90, ALLEN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱5.3M | 100% | High risk74 | —-0.030 |
| 30 | 17II0024OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE PANGPANG-PALAPAG-MAPANAS-GAMAY-LAPINIG ROAD, K0799+000 - K0800+091, K0810+799 - K0813+460, PALAPAG, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱44.9M | 100% | High risk74 | —-0.036 |
| 31 | 25II0005CONST./UPGRADING/REHAB. OF DRAINAGE ALONG NATIONAL ROADS, SECONDARY ROADS, CATARMAN-LAOANG RD., K0777+710-K0778+125, SECOND DISTRICT, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱6.9M | 100% | High risk74 | —-0.032 |
| 32 | 18II0003CONSTRUCTION OF RAWIS EXTENSION ROAD, PHASE II, LAOANG, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱9.2M | 100% | High risk73 | —-0.034 |
| 33 | 17II0022CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, LAOANG-CALOMOTAN ROAD, K0791+(-200) - K0792+738, SECOND DISTRICT, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱39M | 100% | High risk72 | —-0.030 |
| 34 | 17I00044CONSTRUCTION OF EVACUATION CENTER, ALLEN, NORTHERN SAMAR | Region VIII | Region VIII | Completed | ₱32.3M | 100% | High risk68 | —-0.064 |
| 35 | 24IH0031CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SOMOGE, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱139.9M | 97% | High risk66 | —-0.021 |
| 36 | 21I00042BRIDGE-REPLACEMENT OF BRIDGES (TEMPORARY TO PERMANENT)-PAMBUJAN BR. (B00545SM) ALONG SN ROQUE-CABABTOAN OLD RD., PAMBUJAN, CATARMAN, NORTHERN SAMAR | Region VIII | Region VIII | Completed | ₱152.7M | 100% | High risk66 | —-0.028 |
| 37 | 25I00161ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0861+453 - K0862+355, K0862+380 - K0862+786, K0863+064 - K0863+364, K0863+600 - K0863+685, K0863+685 - | Region VIII | Region VIII | On-Going | ₱151.5M | 32% | High risk66 | —-0.021 |
| 38 | 24I00093ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR) - K0734+578 - K0735+526, K0742+826 - K0745+000, SAMAR 1ST LD | Region VIII | Region VIII | Completed | ₱147.3M | 100% | High risk65 | —-0.072 |
| 39 | 18II0055REPLACEMENT OF BRIDGES, (TEMPORARY TO PERMANENT), TALISAY BRIDGE (B00572SBM) ALONG RAWIS - TALISAY ROAD, LAOANG, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱117.1M | 100% | High risk63 | —-0.043 |
| 40 | 24I00199CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DAPDAP RIVER, BRGY. DAPDAP, ALANGALANG, LEYTE | Region VIII | Region VIII | Completed | ₱96.4M | 100% | High risk63 | —-0.069 |
| 41 | 20I00054VIILP - LOCAL ROADS AND BRIDGES - LOCAL ROADS - ROAD OPENING / CONCRETING OF HINANGUTDAN, STA. RITA TO SAN ROQUE, VILLAREAL, SAMAR (PHASE I) | Region VIII | Region VIII | Completed | ₱136.8M | 100% | High risk62 | —-0.067 |
| 42 | 21I00034CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-ACCESS ROAD FROM BRGY. POLANGI-BRGY. PANAYURAN-BRGY. LITERON LEADING TO LULUGAYAN FALLS, CALBIGA RIVER AND ...... CALBIGA SAMAR | Region VIII | Region VIII | Completed | ₱102.7M | 100% | High risk61 | —-0.072 |
| 43 | 21I00011CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - ROAD OPENING/CONCRETING OF HINANGUTDAN - STA. RITA TO SAN ROQUE - VILLAREAL, SAMAR (PHASE III), SAMAR 2ND LD | Region VIII | Region VIII | Completed | ₱99.4M | 100% | High risk60 | —-0.076 |
| 44 | 22II0063REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROADS, SN POLICARPO - ARTECHE - LAPINIG RD, K0861+212 - K0862+060, 2ND DISTRICT, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱94.5M | 100% | High risk60 | —-0.077 |
| 45 | 24II0006REHAB./RECONSTRUCTION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROADS, SN POLICARPO-ARTECHE-LAPINIG RD. K0852+790-K0852+940; K0853+526-K0853+613; K0854+735-K0854+850; K0857+470-K0857+630; K0858+675-K0858+928, 2ND DISTRICT, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱95.8M | 100% | High risk60 | —-0.082 |
| 46 | 25IM0065REHABILITATION OF ROAD WITH DRAINAGE STRUCTURE, BARANGAY 83-C, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱4.9M | 0% | Medium risk60 | —-0.001 |
| 47 | 21IJ0088CONST.OF ROAD SLOPE PROTECTION STRUCTURE, CALBAYOG-CATARMAN RD-KO785+(-200)-KO785+(-118),KO785+(-082)-KO785+(051),KO785+000-KO785+050,KO785_071-KO785+182, KO785+198-KO785+285.5, KO785+322-KO785+381, KO785+624-KO785+695 | Region VIII | Samar 1st DEO | Completed | ₱96.1M | 100% | Medium risk59 | —-0.083 |
| 48 | 22II0064REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROADS, SN POLICARPO - ARTECHE - LAPINIG RD, K0862+747 - K0863+085, 2ND DISTRICT, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱91.7M | 100% | Medium risk59 | —-0.078 |
| 49 | 23IH0082REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG CATARMAN - CALBAYOG ROAD - K0784+325 - K0784+439, LOPE DE VEGA, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱96.4M | 100% | Medium risk59 | —-0.083 |
| 50 | 23IH0083REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG CATARMAN - CALBAYOG ROAD - K0784+211 - K0784+325, LOPE DE VEGA, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱96.4M | 100% | Medium risk59 | —-0.083 |