Opening the dossier…
Opening the dossier…
Contractor dossier
111 projects on file, including joint ventures this contractor is part of.
Total projects
111
Total budget
₱5B
Average progress
97.8%
Completion rate
87.4%
Average risk score
49.5
Medium risk on average, out of 100
Flagged as unusual
6
5.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 101 | ₱4.4B | 49.2 | 5 | 98.2% |
| Region XIII | 7 | ₱339.2M | 44.8 | 0 | 100.0% |
| Negros Island Region | 2 | ₱187M | 84.4 | 1 | 83.4% |
| Region IV-B | 1 | ₱98.8M | 50.5 | 0 | 70.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 83 | ₱3B | 45.1 | 0 | 99.9% |
| OTHER | 6 | ₱426.8M | 67.6 | 2 | 90.4% |
| Flood Control and Drainage | 6 | ₱555.1M | 57.2 | 0 | 92.9% |
| Bridges | 6 | ₱318.6M | 51.6 | 0 | 100.0% |
| GAA 2025 OO-1 | 4 | ₱449.7M | 91.5 | 3 | 86.3% |
| Buildings and Facilities | 4 | ₱135.2M | 47.8 | 0 | 90.2% |
| GAA 2025 SSP | 1 | ₱98M | 95.7 | 1 | 60.7% |
| Water Provision and Storage | 1 | ₱29.7M | 44.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HC0055SPECIAL ROAD FUND- MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239: INSTALLATION OF ROADWAY LIGHTING STRUCTURES ALONG SAGBAYAN DANAO ROAD (SDR) PASSING ALL INABANGA NATIONAL ROADS, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱98M | 61% | High risk96 | Flagged0.029 |
| 25HL0031ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES: MALOH BR. (B00020NR) ALONG DUMAGUETE SOUTH RD, SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱114.6M | 67% | High risk95 | Flagged0.012 |
| 25HC0085ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0087+721-K0089+021, K0095+383-K0095+603, GETAFE, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱49.9M | 78% | High risk94 | Flagged0.005 |
| 25H00067OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD (S00104BH) - K0112+226 - K0112+434, K0113+531 - K0114 + 210, K0115+000-K0116+370 | Region VII | Region VII | On-Going | ₱142.6M | 100% | High risk89 | Flagged0.012 |
| 25H00068ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, LOAY INTERIOR RD (S00100BH) - K0139 + 765 - K0140 + 570, K0146 + 356 - K0147 + 069, K0151 + 522 - K0152 + 705 | Region VII | Region VII | Completed | ₱142.6M | 100% | High risk88 | —-0.009 |
| 18H00033ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD SYSTEM, BRIDGE PROGRAM REPLACEMENT OF PERMANENT WEAK BRIDGES BACONG BR. (B00005BH) ALONG TAGBILARAN JETAFE SECTION, BOHOL PROVINCE | Region VII | Region VII | Completed | ₱159.3M | 100% | High risk77 | Flagged0.012 |
| 24HL0014ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: WIDENING OF PERMANENT BRIDGES: MAYABON BR. (B00013NR) ALONG DUMAGUETE SOUTH RD, ZAMBOANGUITA, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱72.4M | 100% | High risk74 | —-0.027 |
| 25HA0037CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ABATAN-AGAHAY-BUSAO-TORIL-AGHAO ROAD (CABAWAN) LEADING TO SEVERAL TOURISM SITES, MARIBOJOC, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱25.9M | 92% | High risk66 | —-0.001 |
| 22H00075CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-RETROFITTING OF JACINTO BORJA 1 BRIDGE, (B00001BH), TAGBILARAN CITY, BOHOL | Region VII | Region VII | On-Going | ₱96.5M | 51% | High risk65 | Flagged0.012 |
| 24H00134CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF STORM SURGE PROTECTION STRUCTURE AT BARANGAY PITOGO, CARLOS P. GARCIA, BOHOL | Region VII | Region VII | On-Going | ₱197.6M | 82% | High risk64 | —-0.004 |
| 24H00014OO 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE-TERTIARY ROADS, JCT. (TNR) CORTES-BALILIHAN-CATIGBIAN-MACAAS RD, K0017+000-K0017+065, K0017+572-K0018+000, K0019+000-K0019+906, K0024+000-K0025+000,K0 | Region VII | Region VII | Completed | ₱193M | 100% | High risk64 | —-0.064 |
| 22HA0044CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINANGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, POBLACION AND POBLACION WESTE, STA. 000+000.00 - STA. 006+366.890, CATIGBIAN, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱95.4M | 100% | High risk64 | —-0.067 |
| 22HA0106CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AT ULBUJAN-CAMIAS-CANGGUHA-SAMPOANGON ROAD, CALAPE, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱99M | 100% | High risk63 | —-0.066 |
| 21H00007ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, ABATAN PARALLEL BR. ALONG TAGBILARAN NORTH ROAD (TAGBILARAN-JETAFE SECTION), K010+051.122-K010+425.00, BOHOL PROVINCE | Region VII | Region VII | Completed | ₱115.8M | 100% | High risk63 | —-0.026 |
| 23H00093OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE-SECONDARY ROADS, TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA)-K0125+996-K0127+007, K0135+488-K0136+000, K0136+280-K0138+000, K0149+000-K0150+000, BOHOL PROVI | Region VII | Region VII | Completed | ₱159.2M | 100% | High risk63 | —-0.013 |
| 19HB0123ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS-LOAY INTERIOR ROAD KO155+548-KO156+239, KO192+216-KO192+470, KO105+928-KO186+624 | Region VII | Bohol 3rd DEO | Completed | ₱40M | 100% | High risk62 | —-0.030 |
| 19HC0020001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION- PREVENTIVE MAINTENANCE- SECONDARY ROAD AT LOAY INTERIOR ROAD K0148+000-K0149+000 AND K0149+000-K0150+000, DAGOHOY, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱32.7M | 100% | High risk61 | —-0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HC0055SPECIAL ROAD FUND- MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239: INSTALLATION OF ROADWAY LIGHTING STRUCTURES ALONG SAGBAYAN DANAO ROAD (SDR) PASSING ALL INABANGA NATIONAL ROADS, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱98M | 61% | High risk96 | Flagged0.029 |
| 25H00067OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD (S00104BH) - K0112+226 - K0112+434, K0113+531 - K0114 + 210, K0115+000-K0116+370 | Region VII | Region VII | On-Going | ₱142.6M | 100% | High risk89 | Flagged0.012 |
| 18H00033ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD SYSTEM, BRIDGE PROGRAM REPLACEMENT OF PERMANENT WEAK BRIDGES BACONG BR. (B00005BH) ALONG TAGBILARAN JETAFE SECTION, BOHOL PROVINCE | Region VII | Region VII | Completed | ₱159.3M | 100% | High risk77 | Flagged0.012 |
| 22H00075CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-RETROFITTING OF JACINTO BORJA 1 BRIDGE, (B00001BH), TAGBILARAN CITY, BOHOL | Region VII | Region VII | On-Going | ₱96.5M | 51% | High risk65 | Flagged0.012 |
| 25HL0031ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES: MALOH BR. (B00020NR) ALONG DUMAGUETE SOUTH RD, SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱114.6M | 67% | High risk95 | Flagged0.012 |
| 25HC0085ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0087+721-K0089+021, K0095+383-K0095+603, GETAFE, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱49.9M | 78% | High risk94 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 25HA0003PREVENTIVE MAINTENANCE - TERTIARY ROADS - BALILIHAN-HANOPOL-BATUAN RD - K0028 + 438 - K0029 + 574 | Region VII | Bohol 1st DEO | Completed | ₱39.2M | 100% | Medium risk54 | —-0.062 |
| 27 | 23HA0024PREVENTIVE MAINTENANCE - TERTIARY ROADS - JCT (TNR) CORTES-BALILIHAN-CATIGBIAN-MACAAS RD - K0010 + (-1113) - K0010 + (-983), K0010 + (-983) - K0010 + (-683), K0010 + (-683) - K0010 + 000, K0010 + 000 - K0011 + 000, K0018 + 000 - K0019 + 000, K0036 + 993 - | Region VII | Bohol 1st DEO | Completed | ₱85M | 100% | Medium risk54 | —-0.086 |
| 28 | 22HA0104INSTALLATION OF SOLAR LED LIGHTINGS ON ROADS LEADING TO NEW BOHOL-PANGLAO INTERNATIONAL AIRPORT - PANGLAO ISLAND CIRCUMFERENTIAL ROAD (VIA TANGNAN) | Region VII | Bohol 1st DEO | Completed | ₱77.2M | 100% | Medium risk54 | —-0.088 |
| 29 | 23HA0001PREVENTIVE MAINTENANCE - SECONDARY ROADS - TAGBILARAN NORTH RD (TAGBILARAN-JETAFE SECT) - K0000 + 050 - K0001 + 000 | Region VII | Bohol 1st DEO | Completed | ₱58.2M | 100% | Medium risk54 | —-0.091 |
| 30 | 23HA0002PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT (TER) DAUIS-PANGLAO RD - K0007 + 750 - K0008 + 000, K0011 + 842.40 - K0013+400 | Region VII | Bohol 1st DEO | Completed | ₱56.7M | 100% | Medium risk54 | —-0.092 |
| 31 | 24HA0003PREVENTIVE MAINTENANCE - SECONDARY ROADS - TAGBILARAN NORTH RD (TAGBILARAN-JETAFE SECT) - K0042+500 - K0045+028 | Region VII | Bohol 1st DEO | Completed | ₱60.9M | 100% | Medium risk54 | —-0.092 |
| 32 | 25HA0002PREVENTIVE MAINTENANCE - TERTIARY ROADS - TAGBILARAN CITY-CORELLA-SIKATUNA-LOBOC RD - K0011 + 017 - K0012 + 000, K0012 + 401 - K0013 + 359 | Region VII | Bohol 1st DEO | Completed | ₱65.5M | 100% | Medium risk54 | —-0.090 |
| 33 | 23HC0088ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS- TERTIARY ROADS- ANTEQUERA-SAN ISIDRO-LIBERTAD (TUBIGON) RD- K0034+992-K0037+064, SAN ISI | Region VII | Bohol 2nd DEO | Completed | ₱81.2M | 100% | Medium risk53 | —-0.086 |
| 34 | 22HA0158PREVENTIVE MAINTENANCE - TERTIARY ROADS - JCT (TNR) CORTES-BALILIHAN-CATIGBIAN-MACAAS RD - K0042+000 -K0043+400, K0045+000-K0046+000 | Region VII | Bohol 1st DEO | Completed | ₱57.8M | 100% | Medium risk53 | —-0.092 |
| 35 | 22HC0106ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROAD: JCT (LIR) CARMEN- SAGBAYAN- BACANI RD K0174+(-001) - K0177+000, SAGBAYAN, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱72.3M | 100% | Medium risk52 | —-0.090 |
| 36 | 17N00098CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, DAPA PORT - CONSUELO - CORAZON - STA. CRUZ - STA. FE - LIBERTAD - CABITOONAN - CATANGNAN - GENERAL LUNA ROAD, SURIGAO DEL NORTE 1ST LD. | Region XIII | Region XIII | Completed | ₱56M | 100% | Medium risk51 | —-0.042 |
| 37 | 20HA0105REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - JCT (TNR) CORTES - BALILIHAN - CATIGBIAN - MACAAS RD - K0032+933-K0033+152, K0033+157-K0034+060, K0038+556-K0039+062, K0039+122-K0039+486 | Region VII | Bohol 1st DEO | Completed | ₱53.5M | 100% | Medium risk51 | —-0.093 |
| 38 | 22HC0109CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BUGAONG, BUENAVISTA, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱66.6M | 100% | Medium risk51 | —-0.067 |
| 39 | 25EF0078CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PUNTA BAJA, JOSE P. RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱98.8M | 70% | Medium risk50 | —-0.011 |
| 40 | 24H00050CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF CAHAYAG FLOOD CONTROL STRUCTURE, CAHAYAG TUBIGON, BOHOL | Region VII | Region VII | On-Going | ₱48.2M | 89% | Medium risk50 | —-0.030 |
| 41 | 24H00051CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONST. OF MARIBOJOC FLOOD CONTROL STRUCTURE, PHASE 2, POBLACION-ANISLAG-BAYACABAC-PUNSOD, MARIBOJOC, B | Region VII | Region VII | On-Going | ₱48.2M | 86% | Medium risk50 | —-0.029 |
| 42 | 17NG0042DAPA PORT - CONSUELO - CORAZON - MABUHAY - SALVACION ROAD CONSTRUCTION OF CONCRETE ROAD, PILAR, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱37.3M | 100% | Medium risk50 | —-0.047 |
| 43 | 17N00099CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO SEAPORTS, DAPA PORT-CONSUELO-CORAZON-STA. CRUZ-STA. FE-LIBERTAD-CABITOONAN-CATANGNAN-GENERAL LUNA ROAD (CONSTRUCTION OF BRIDGE 1 AND BRIDGE 2, SURIGAO DEL NORTE 1ST LD, SURIGAO DEL NORTE, SIARGAO ISLANDS | Region XIII | Region XIII | Completed | ₱67.5M | 100% | Medium risk49 | —-0.001 |
| 44 | 24HB0148CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BALBALAN - PAGSA, | Region VII | Bohol 3rd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.091 |
| 45 | 23HA0026PREVENTIVE MAINTENANCE - TERTIARY ROADS - BALILIHAN-HANOPOL-BATUAN RD - K0033 + 680 - K0034 + 000, K0034 + 444 - K0036 + 000 | Region VII | Bohol 1st DEO | Completed | ₱51.2M | 100% | Medium risk48 | —-0.094 |
| 46 | 25HA0001PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT (TER) DAUIS-PANGLAO RD - K0013 + 533 - K0014 + 000, K0016 + 000 - K0017 + 000 | Region VII | Bohol 1st DEO | Completed | ₱46.7M | 100% | Medium risk48 | —-0.094 |
| 47 | 23H00003ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, ABATAN BR. (B00227BH) ALONG TAGBILARAN NORTH RD (TAGBILARAN-JETAFE SECT), BOHOL PROVINCE | Region VII | Region VII | Completed | ₱38.6M | 100% | Medium risk48 | —-0.055 |
| 48 | 24HA0134CONSTRUCTION OF MULTI-PURPOSE BUILDING, BALILIHAN, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱21.7M | 100% | Medium risk48 | —-0.093 |
| 49 | 23HA0088REPLACEMENT OF PERMANENT WEAK BRIDGES - BUACAN BR. (B00023BH) ALONG JCT (TNR) CORTES-BALILIHAN-CATIGBIAN-MACAAS RD | Region VII | Bohol 1st DEO | Completed | ₱11.7M | 100% | Medium risk47 | —-0.057 |
| 50 | 19HA0001PREVENTIVE MAINTENANCE - JCT. (TER) DAUIS-PANGLAO ROAD, K0014+000 - K0015+798, PANGLAO, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱45.5M | 100% | Medium risk47 | —-0.094 |