Opening the dossier…
Opening the dossier…
Contractor dossier
111 projects on file, including joint ventures this contractor is part of.
Total projects
111
Total budget
₱5B
Average progress
97.8%
Completion rate
87.4%
Average risk score
49.5
Medium risk on average, out of 100
Flagged as unusual
6
5.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 101 | ₱4.4B | 49.2 | 5 | 98.2% |
| Region XIII | 7 | ₱339.2M | 44.8 | 0 | 100.0% |
| Negros Island Region | 2 | ₱187M | 84.4 | 1 | 83.4% |
| Region IV-B | 1 | ₱98.8M | 50.5 | 0 | 70.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 83 | ₱3B | 45.1 | 0 | 99.9% |
| OTHER | 6 | ₱426.8M | 67.6 | 2 | 90.4% |
| Flood Control and Drainage | 6 | ₱555.1M | 57.2 | 0 | 92.9% |
| Bridges | 6 | ₱318.6M | 51.6 | 0 | 100.0% |
| GAA 2025 OO-1 | 4 | ₱449.7M | 91.5 | 3 | 86.3% |
| Buildings and Facilities | 4 | ₱135.2M | 47.8 | 0 | 90.2% |
| GAA 2025 SSP | 1 | ₱98M | 95.7 | 1 | 60.7% |
| Water Provision and Storage | 1 | ₱29.7M | 44.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HC0055SPECIAL ROAD FUND- MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239: INSTALLATION OF ROADWAY LIGHTING STRUCTURES ALONG SAGBAYAN DANAO ROAD (SDR) PASSING ALL INABANGA NATIONAL ROADS, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱98M | 61% | High risk96 | Flagged0.029 |
| 25HL0031ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES: MALOH BR. (B00020NR) ALONG DUMAGUETE SOUTH RD, SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱114.6M | 67% | High risk95 | Flagged0.012 |
| 25HC0085ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0087+721-K0089+021, K0095+383-K0095+603, GETAFE, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱49.9M | 78% | High risk94 | Flagged0.005 |
| 25H00067OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD (S00104BH) - K0112+226 - K0112+434, K0113+531 - K0114 + 210, K0115+000-K0116+370 | Region VII | Region VII | On-Going | ₱142.6M | 100% | High risk89 | Flagged0.012 |
| 25H00068ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, LOAY INTERIOR RD (S00100BH) - K0139 + 765 - K0140 + 570, K0146 + 356 - K0147 + 069, K0151 + 522 - K0152 + 705 | Region VII | Region VII | Completed | ₱142.6M | 100% | High risk88 | —-0.009 |
| 18H00033ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD SYSTEM, BRIDGE PROGRAM REPLACEMENT OF PERMANENT WEAK BRIDGES BACONG BR. (B00005BH) ALONG TAGBILARAN JETAFE SECTION, BOHOL PROVINCE | Region VII | Region VII | Completed | ₱159.3M | 100% | High risk77 | Flagged0.012 |
| 24HL0014ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: WIDENING OF PERMANENT BRIDGES: MAYABON BR. (B00013NR) ALONG DUMAGUETE SOUTH RD, ZAMBOANGUITA, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱72.4M | 100% | High risk74 | —-0.027 |
| 25HA0037CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ABATAN-AGAHAY-BUSAO-TORIL-AGHAO ROAD (CABAWAN) LEADING TO SEVERAL TOURISM SITES, MARIBOJOC, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱25.9M | 92% | High risk66 | —-0.001 |
| 22H00075CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-RETROFITTING OF JACINTO BORJA 1 BRIDGE, (B00001BH), TAGBILARAN CITY, BOHOL | Region VII | Region VII | On-Going | ₱96.5M | 51% | High risk65 | Flagged0.012 |
| 24H00134CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF STORM SURGE PROTECTION STRUCTURE AT BARANGAY PITOGO, CARLOS P. GARCIA, BOHOL | Region VII | Region VII | On-Going | ₱197.6M | 82% | High risk64 | —-0.004 |
| 24H00014OO 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE-TERTIARY ROADS, JCT. (TNR) CORTES-BALILIHAN-CATIGBIAN-MACAAS RD, K0017+000-K0017+065, K0017+572-K0018+000, K0019+000-K0019+906, K0024+000-K0025+000,K0 | Region VII | Region VII | Completed | ₱193M | 100% | High risk64 | —-0.064 |
| 22HA0044CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINANGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, POBLACION AND POBLACION WESTE, STA. 000+000.00 - STA. 006+366.890, CATIGBIAN, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱95.4M | 100% | High risk64 | —-0.067 |
| 22HA0106CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AT ULBUJAN-CAMIAS-CANGGUHA-SAMPOANGON ROAD, CALAPE, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱99M | 100% | High risk63 | —-0.066 |
| 21H00007ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, ABATAN PARALLEL BR. ALONG TAGBILARAN NORTH ROAD (TAGBILARAN-JETAFE SECTION), K010+051.122-K010+425.00, BOHOL PROVINCE | Region VII | Region VII | Completed | ₱115.8M | 100% | High risk63 | —-0.026 |
| 23H00093OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE-SECONDARY ROADS, TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA)-K0125+996-K0127+007, K0135+488-K0136+000, K0136+280-K0138+000, K0149+000-K0150+000, BOHOL PROVI | Region VII | Region VII | Completed | ₱159.2M | 100% | High risk63 | —-0.013 |
| 19HB0123ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS-LOAY INTERIOR ROAD KO155+548-KO156+239, KO192+216-KO192+470, KO105+928-KO186+624 | Region VII | Bohol 3rd DEO | Completed | ₱40M | 100% | High risk62 | —-0.030 |
| 19HC0020001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION- PREVENTIVE MAINTENANCE- SECONDARY ROAD AT LOAY INTERIOR ROAD K0148+000-K0149+000 AND K0149+000-K0150+000, DAGOHOY, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱32.7M | 100% | High risk61 | —-0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HC0055SPECIAL ROAD FUND- MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239: INSTALLATION OF ROADWAY LIGHTING STRUCTURES ALONG SAGBAYAN DANAO ROAD (SDR) PASSING ALL INABANGA NATIONAL ROADS, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱98M | 61% | High risk96 | Flagged0.029 |
| 25H00067OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD (S00104BH) - K0112+226 - K0112+434, K0113+531 - K0114 + 210, K0115+000-K0116+370 | Region VII | Region VII | On-Going | ₱142.6M | 100% | High risk89 | Flagged0.012 |
| 18H00033ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD SYSTEM, BRIDGE PROGRAM REPLACEMENT OF PERMANENT WEAK BRIDGES BACONG BR. (B00005BH) ALONG TAGBILARAN JETAFE SECTION, BOHOL PROVINCE | Region VII | Region VII | Completed | ₱159.3M | 100% | High risk77 | Flagged0.012 |
| 22H00075CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-RETROFITTING OF JACINTO BORJA 1 BRIDGE, (B00001BH), TAGBILARAN CITY, BOHOL | Region VII | Region VII | On-Going | ₱96.5M | 51% | High risk65 | Flagged0.012 |
| 25HL0031ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES: MALOH BR. (B00020NR) ALONG DUMAGUETE SOUTH RD, SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱114.6M | 67% | High risk95 | Flagged0.012 |
| 25HC0085ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0087+721-K0089+021, K0095+383-K0095+603, GETAFE, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱49.9M | 78% | High risk94 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 18HC0001ASSET PRESERVATION-PREVENTIVE MAINTENANCE: ASPHALT OVERLAY AT ANTEQUERA-SAN ISIDRO-LIBERTAD (TUBIGON) ROAD, K0034+498-K0034+992 SAN ISIDRO, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱7.3M | 100% | Medium risk45 | —-0.097 |
| 77 | 22HC0002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROAD: JCT. (LIR) CARMEN-SAGBAYAN-BACANI RD K0182+000- K0183+970, SAGBAYAN, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱39.2M | 100% | Medium risk45 | —-0.095 |
| 78 | 23HC0045ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION - PREVENTIVE MAINTENANCE- TERTIARY ROADS- JCT (TNR)-TALIBON RD - K0133+(-208) - K0114+000, K0113+(-222)-K0113+(-208), - K0113(-455) - K0113+(-222), TALIBON, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱40.3M | 100% | Medium risk45 | —-0.089 |
| 79 | 18HC0054CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS AT TAMING BRGY. ROAD LEADING TO GRAND CANYON VIEW OF DANAO ADVENTURE PARK, BRGY. TAMING, DANAO, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱29.9M | 100% | Medium risk45 | —-0.088 |
| 80 | 24HB0175CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM - REHABILITATION OF LOAY WATERWORKS SYSTEM, LOAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱29.7M | 100% | Medium risk45 | —-0.051 |
| 81 | 23HC0001ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS- TAGBILARAN EAST RD (TAGBILARAN-JAGNA)- K0122+000-K0123+046, TRINIDAD, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱40.2M | 100% | Medium risk45 | —-0.094 |
| 82 | 19HC0016001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION- PREVENTIVE MAINTENANCE -SAGBAYAN-DANAO ROAD-K0077+(-471)-K0077+018, K0088+323-K0088+711, SAGBAYAN AND DANAO, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱16M | 100% | Medium risk44 | —-0.095 |
| 83 | 22HC0001ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROAD: JCT. (LIR) CARMEN-SAGBAYAN-BACANI RD K0180+000- K0180+975, SAGBAYAN, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱19.4M | 100% | Medium risk44 | —-0.096 |
| 84 | 18HC0044CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS AT TAMING TO VILLA ANUNCIADO ROAD LEADING TO HIGHLAND TOURISM, BRGY. TAMING, DANAO, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱18.3M | 100% | Medium risk44 | —-0.096 |
| 85 | 18HC0012ASSET PRESERVATION-PREVENTIVE MAINTENANCE: ASPHALT OVERLAY WITH CORRECTION AT SAGBAYAN-DANAO ROAD, K0090+000-K0090+184 & K0090+214.50-K0091+050, DANAO, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱15.4M | 100% | Medium risk44 | —-0.096 |
| 86 | 22HC0020ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE- SECONDARY ROAD: LOAY INTERIOR RD K0127+000 - K0127+788, TRINIDAD, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱15.7M | 100% | Medium risk44 | —-0.095 |
| 87 | 22HC0003ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS: LOAY INTERIOR RD K0129+000-K0129+855, TRINIDAD, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱17M | 100% | Medium risk44 | —-0.095 |
| 88 | 18NG0018REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - JCT DEL CARMEN - STA. MONICA - SAN ISIDRO ROAD. (K0022 + 417 - K0024 + 414, K0046 + 700- K0047 + 150, K0056 + 716 - K0057 + 311), SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱84.5M | 100% | Medium risk44 | —-0.071 |
| 89 | 20HC0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS -SAN MIGUEL-BAYONGAN-BULILIS-MABUHAY(UBAY) ROAD LEADING TO DANAO ADVENTURE PARK, UBAY, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱28.2M | 100% | Medium risk44 | —-0.094 |
| 90 | 18HC0053CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO U-OG FISHPORT, INABANGA, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱19.1M | 100% | Medium risk44 | —-0.096 |
| 91 | 24HC0085ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM -ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS: TAGBILARAN NORTH RD (TAGBILRAN-JETAFE SECT)- K0062+266-K0062+321, K0062+337-K0062+342, CLARIN, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱6.2M | 100% | Medium risk44 | —-0.098 |
| 92 | 19HB0085ASSET PRESERVATION-PREVENTIVE MAINTENANCE -TERTIARY ROADS- ASPHALT OVERLAY-BALILIHAN-HANOPOL-BATUAN ROAD KO048+594-KO049+005 WITHIN THE DISTRICT | Region VII | Bohol 3rd DEO | Completed | ₱5.1M | 100% | Medium risk43 | —-0.093 |
| 93 | 21HA0020PREVENTIVE MAINTENANCE - BALILIHAN-HANOPOL-BATUAN RD - K0034+000 - K0034+444 | Region VII | Bohol 1st DEO | Completed | ₱9.4M | 100% | Medium risk43 | —-0.092 |
| 94 | 20HB0025ASSET PRESERVATION PROGRAM -PREVENTIVE MAINTENANCE- SECONDARY ROADS- ASPHALT OVERLAY- TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA) KO 206+321 - KO 206+ 927 | Region VII | Bohol 3rd DEO | Completed | ₱12.5M | 100% | Medium risk43 | —-0.094 |
| 95 | 19HC0045003 - CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - DANAO-SAGBAYAN ROAD JCT. TO STO. NINO TO MAGTANGTANG BARANGAY ROAD LEADING TO DANAO ADVENTRUE PARK, DANAO, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱9.3M | 100% | Medium risk43 | —-0.096 |
| 96 | 21HC0006OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION- PREVENTIVE MAINTENANCE - TERTIARY ROADS- JCT (LIR) BUENAVISTA-CARMEN-DANAO-JETAFE RD- K0173+289- K0173+733, DANAO, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱9.5M | 100% | Medium risk43 | —-0.096 |
| 97 | 20HC0032CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS: TAMING BARANGAY ROAD LEADING TO GRAND CANYON VIEW OF DANAO ADVENTURE PARK, BRGY. TAMING, DANAO, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱9.3M | 100% | Medium risk43 | —-0.096 |
| 98 | 19HC0026003: CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION /IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS- TAMING BARANGAY ROAD LEADING TO GRAND CANYON VIEW OF DANAO ADVENTURE PARK, BRGY. TAMING, DANAO, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱9.3M | 100% | Medium risk43 | —-0.097 |
| 99 | 21HC0007ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE -TERTIARY ROADS- JCT (TNR)- TALIBON RD - K0114+000-K0114+467, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱6.6M | 100% | Medium risk43 | —-0.096 |
| 100 | 21HC0004OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION- PREVENTIVE MAINTENANCE- SECONDARY ROAD: TAGBILARAN EAST RD (TAGBILARAN-JAGNA) - K0138+775-K0139+599, UBAY, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱9.4M | 100% | Medium risk43 | —-0.095 |