Opening the dossier…
Opening the dossier…
Contractor dossier
39 projects on file, including joint ventures this contractor is part of.
Total projects
39
Total budget
₱785.6M
Average progress
100.0%
Completion rate
100.0%
Average risk score
31.3
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 39 | ₱785.6M | 31.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 16 | ₱483.3M | 36.5 | 0 | 100.0% |
| Roads | 13 | ₱158.7M | 27.9 | 0 | 100.0% |
| Buildings and Facilities | 9 | ₱129.1M | 26.9 | 0 | 100.0% |
| Bridges | 1 | ₱14.5M | 29.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17CH0011CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RETAI | Region III | Pampanga 2nd DEO | Completed | ₱11.5M | 100% | High risk68 | —-0.062 |
| 15CC0330REPAIR/REHABILITATION/IMPROVEMENT OF CONCRETE SLOPE PROTECTION ALONG PAMPANGA RIVER STA. LUCIA, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.4M | 100% | High risk61 | —-0.012 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 17CH0011CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RETAI | Region III | Pampanga 2nd DEO | Completed | ₱11.5M | 100% | High risk68 | —-0.062 |
| 2 | 15CC0330REPAIR/REHABILITATION/IMPROVEMENT OF CONCRETE SLOPE PROTECTION ALONG PAMPANGA RIVER STA. LUCIA, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.4M | 100% | High risk61 | —-0.012 |
| 3 | 22CH0044REHABILITATION/IMPROVEMENT OF GUAGUA PASAK RIVER, PHASE 3, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.078 |
| 4 | 18CH0154SLOPE PROTECTION ALONG SAPANG UYONG RIZAL, GUAGUA, PAMPANGA STA. 0+000-STA.1+844.60, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱23.6M | 100% | Medium risk40 | —-0.030 |
| 5 | 22CH0093CONSTRUCTION MULTI-PURPOSE BUILDING (INFIRMARY BUILDING), GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱29.4M | 100% | Medium risk35 | —-0.100 |
| 6 | 21CH0115CONCRETING OF PUROK 1 TO PUROK 2 FMR, BRGY. CALZADANG BAYU, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱16.9M | 100% | Medium risk35 | —-0.041 |
| 7 | 21CH0021CONSTRUCTION OF MULTIPURPOSE BUILDING (INFIRMARY BUILDING), GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱9.8M | 100% | Medium risk33 | —-0.103 |
| 8 | 23CC0323CONSTRUCTION OF RIVER PROTECTION ALONG ANGAT RIVER, K008+210 TO K008+360, BARANGAY SAN JOSE, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.094 |
| 9 | 23CC0320CONSTRUCTION OF RIVER PROTECTION ALONG ANGAT RIVER, K009+520 TO K009+670, TIAONG, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.094 |
| 10 | 23CC0321CONSTRUCTION OF RIVER PROTECTION ALONG ANGAT RIVER, K011+810 TO K011+960, CULIANIN, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.093 |
| 11 | 22CG0252SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF MANGGA CACUTUD - GATIAWIN ROAD, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱23.4M | 100% | Medium risk32 | —-0.105 |
| 12 | 19CG0157ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - STO. TOMAS - MINALIN RD (MINALIN-MACABEBE SECT) K0072+098 - K0072+873; K0073+344 - K0074+458.70, MINALIN, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱14.4M | 100% | Medium risk31 | —-0.103 |
| 13 | 19CG0163ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - BALIWAG - CANDABA - STA. ANA RD. K0058+(-050) - K0058+042, K0059+060 - K0059+452, K0061+951- K0062+979, K0063+000 - K0063+041, K0063+169 - K0063+210, K0063+236 - K0063+593, K0063+757 - | Region III | Pampanga 1st DEO | Completed | ₱17.2M | 100% | Medium risk31 | —-0.106 |
| 14 | 20CG0089ASSET PRESERVATION PROGRAM: REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS- PRIMARY ROADS - MANILA NORTH RD - K0064+192 - K0064+393, STO. TOMAS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱14.9M | 100% | Medium risk31 | —-0.105 |
| 15 | 19CG0140ASSET PRESERVATION PROGRAM; PREVENTIVE MAINTENANCE - TERTIARY ROAD - CANDABA - SN MIGUEL RD - K0080+000 - K0080+133, K0080+806 - K0080+930, K0081+057 - K0081+228, K0081+403 - K0081+705, K0083+000 - K0083+252, K0084+000 - K0084+083, CANDABA - SN MIGUEL, PA | Region III | Pampanga 1st DEO | Completed | ₱12M | 100% | Medium risk30 | —-0.104 |
| 16 | 20CG0230CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS: LOCAL ROADS AND BRIDGES - LOCAL BRIDGES - CONSTRUCTION OF PEDESTRIAN OVERPASS AT OUR LADY OF FATIMA ALONG MNR, CITY OF SAN FERNANDO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱14.2M | 100% | Medium risk30 | —-0.100 |
| 17 | 20CG0231CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS: LOCAL ROADS AND BRIDGES - LOCAL BRIDGES - CONSTRUCTION OF PEDESTRIAN OVERPASS AT MT. CARMEL ALONG MNR, CITY OF SAN FERNANDO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱14.2M | 100% | Medium risk30 | —-0.100 |
| 18 | 21CG0076FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CONCRETE SLOPE PROTECTION AT SAN ESTEBAN ELEMENTARY SCHOOL, SAN ESTEBAN, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱9.5M | 100% | Medium risk30 | —-0.092 |
| 19 | 22CG0209BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF STA. LUCIA PAGUIABA 2-STOREY MULTI-PURPOSE BUILDING, BRGY. STA. LUCIA PAGUIABA, MASANTOL, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱4.7M | 100% | Low risk30 | —-0.107 |
| 20 | 19CH0133CONCRETING OF ROAD, SAN AGUSTIN, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱9.8M | 100% | Low risk30 | —-0.105 |
| 21 | 21CH0117BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - REPAIR/REHABILITATION OF PERMANENT WEAK BRIDGE LUBAO BR. (B01518LZ) ALONG SAN FERNANDO - LUBAO ROAD, LUBAO, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱14.5M | 100% | Low risk30 | —-0.066 |
| 22 | 19CG0124ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - TERTIARY ROAD - BAHAY PARE - SN LUIS - STO. DOMINGO RD. - K0065+122 - K0065+181, K0065+610 - K0065+796, K0065+808 - K0066+109, BAHAY PARE-SN LUIS-STO. DOMINGO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱7M | 100% | Low risk30 | —-0.103 |
| 23 | 23CG0159BASIC INFRASTRUCTURE PROGRAM: FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - REHABILITATION OF ERODED PAMPANGA RIVER BANK ALONG STA. CATALINA, SAN LUIS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱14.5M | 100% | Low risk29 | —-0.094 |
| 24 | 19CC0021CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER RUEDA SECTION PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱23.3M | 100% | Low risk29 | —-0.094 |
| 25 | 19CC0042CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG ANGAT RIVER STA. BARBARA (TIAONG) SECTION BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱20.2M | 100% | Low risk29 | —-0.094 |