Contractor dossier
188 projects on file, including joint ventures this contractor is part of.
Total projects
188
Total budget
₱5.9B
Average progress
97.3%
Completion rate
91.0%
Average risk score
33.9
Medium risk on average, out of 100
Flagged as unusual
4
2.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 183 | ₱5.5B | 33.3 | 4 | 97.7% |
| Region XI | 5 | ₱440.9M | 57.7 | 0 | 84.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 80 | ₱2.8B | 33.0 | 0 | 98.4% |
| Buildings and Facilities | 58 | ₱400.5M | 26.8 | 0 | 100.0% |
| Flood Control and Drainage | 33 | ₱1.4B | 35.6 | 0 | 95.0% |
| Bridges | 8 | ₱819.5M | 43.4 | 0 | 90.7% |
| GAA 2025 OO-1 | 4 | ₱259.8M | 93.0 | 2 | 79.0% |
| GAA 2025 SSP | 2 | ₱31.2M | 93.8 | 1 | 75.9% |
| Water Provision and Storage | 2 | ₱7.6M | 14.3 | 0 | 100.0% |
| OTHER | 1 | ₱190.1M | 79.6 | 1 | 98.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CF0062ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS - STA. ROSA - FORT MAGSAYSAY RD - K0 111+000 - K0 111+063.60, K0 111+424.60 - K0 112+000, K0 113+048 - K0 114+000, K0 115+000 - K0 116+000, K0 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱89.9M | 71% | High risk94 | Flagged0.002 |
| 25CF0086BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CSWDO) - PHASE II, BARANGAY KAPITAN PEPE, CABANATUAN CITY, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱16.6M | 83% | High risk94 | —-0.001 |
| 25CF0121ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - NUEVA ECIJA-AURORA RD - K0167+020-K0167+070 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱96M | 99% | High risk94 | —-0.004 |
| 25CF0084SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY KAPT. PEPE, CABANATUAN CITY, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱14.5M | 68% | High risk93 | Flagged0.005 |
| 25CF0123ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - CABANATUAN CITY - CARMEN RD - K0123+(-908) - K0123+040, K0127+208-K0127+705 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱48.8M | 51% | High risk93 | Flagged0.002 |
| 25CF0071ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - CABANATUAN CITY - CARMEN RD - K0123+(-909)-K0123+(-835), K0123+(-681)-K0123+000, K0123+340-K0123+602, K0123+660-K0123+688, K0123+790-K0123+8 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱25.1M | 95% | High risk91 | —-0.013 |
| 24CF0128SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ELISEO TRINIDAD ANGELES BRIDGE ALONG PAMPANGA RIVER (PHASE III), S | Region III | Nueva Ecija 2nd DEO | On-Going | ₱190.1M | 98% | High risk80 | Flagged0.010 |
| 25C00470ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱73.1M | 98% | High risk72 | —-0.040 |
| 21CF0147CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) CONSTRUCTION OF TWO STOREY OFFICERS QUARTER, ARMY ARTILLERY REGIMENT, PHILIPPINE ARMY, FORT RAMON | Region III | Nueva Ecija 2nd DEO | Completed | ₱8.8M | 100% | High risk69 | —-0.074 |
| 20CF0088REHABILITATION OF PAMPANGA RIVER CONTROL EARTH DIKE, BRGY. PAGAS, CABANATUAN CITY, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱34M | 100% | High risk64 | —-0.063 |
| 24LA0023CONSTRUCTION OF ROAD FROM NATIONAL HIGHWAY TO PANTUKAN NATIONAL HIGH SCHOOL TO ROXAS STREET, BARANGAY KINGKING, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱95M | 90% | High risk62 | —-0.032 |
| 24LA0038SURIGAO-DAVAO COASTAL RD., K1781 + (-586) - K1781 + 385, K1783 + 550 - K1784 + 560, K1785 + 062 - K1785 + 515, K1785 + 624 - K1786 + 007, K1787 + 640 - K1788 + 439, K1792 + 298 - K1792 + 808 | Region XI | Davao de Oro 1st DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.071 |
| 24LA0051CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY NAPNAPAN, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.057 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CF0128SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ELISEO TRINIDAD ANGELES BRIDGE ALONG PAMPANGA RIVER (PHASE III), S | Region III | Nueva Ecija 2nd DEO | On-Going | ₱190.1M | 98% | High risk80 | Flagged0.010 |
| 25CF0084SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY KAPT. PEPE, CABANATUAN CITY, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱14.5M | 68% | High risk93 | Flagged0.005 |
| 25CF0123ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - CABANATUAN CITY - CARMEN RD - K0123+(-908) - K0123+040, K0127+208-K0127+705 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱48.8M | 51% | High risk93 | Flagged0.002 |
| 25CF0062ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS - STA. ROSA - FORT MAGSAYSAY RD - K0 111+000 - K0 111+063.60, K0 111+424.60 - K0 112+000, K0 113+048 - K0 114+000, K0 115+000 - K0 116+000, K0 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱89.9M | 71% | High risk94 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25CF0062ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS - STA. ROSA - FORT MAGSAYSAY RD - K0 111+000 - K0 111+063.60, K0 111+424.60 - K0 112+000, K0 113+048 - K0 114+000, K0 115+000 - K0 116+000, K0 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱89.9M | 71% | High risk94 | Flagged0.002 |
| 2 | 25CF0086BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CSWDO) - PHASE II, BARANGAY KAPITAN PEPE, CABANATUAN CITY, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱16.6M | 83% | High risk94 | —-0.001 |
| 3 | 25CF0121ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - NUEVA ECIJA-AURORA RD - K0167+020-K0167+070 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱96M | 99% | High risk94 | —-0.004 |
| 4 | 25CF0084SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY KAPT. PEPE, CABANATUAN CITY, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱14.5M | 68% | High risk93 | Flagged0.005 |
| 5 | 25CF0123ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - CABANATUAN CITY - CARMEN RD - K0123+(-908) - K0123+040, K0127+208-K0127+705 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱48.8M | 51% | High risk93 | Flagged0.002 |
| 6 | 25CF0071ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - CABANATUAN CITY - CARMEN RD - K0123+(-909)-K0123+(-835), K0123+(-681)-K0123+000, K0123+340-K0123+602, K0123+660-K0123+688, K0123+790-K0123+8 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱25.1M | 95% | High risk91 | —-0.013 |
| 7 | 24CF0128SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ELISEO TRINIDAD ANGELES BRIDGE ALONG PAMPANGA RIVER (PHASE III), S | Region III | Nueva Ecija 2nd DEO | On-Going | ₱190.1M | 98% | High risk80 | Flagged0.010 |
| 8 | 25C00470ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱73.1M | 98% | High risk72 | —-0.040 |
| 9 | 21CF0147CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) CONSTRUCTION OF TWO STOREY OFFICERS QUARTER, ARMY ARTILLERY REGIMENT, PHILIPPINE ARMY, FORT RAMON | Region III | Nueva Ecija 2nd DEO | Completed | ₱8.8M | 100% | High risk69 | —-0.074 |
| 10 | 20CF0088REHABILITATION OF PAMPANGA RIVER CONTROL EARTH DIKE, BRGY. PAGAS, CABANATUAN CITY, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱34M | 100% | High risk64 | —-0.063 |
| 11 | 24LA0023CONSTRUCTION OF ROAD FROM NATIONAL HIGHWAY TO PANTUKAN NATIONAL HIGH SCHOOL TO ROXAS STREET, BARANGAY KINGKING, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱95M | 90% | High risk62 | —-0.032 |
| 12 | 24LA0038SURIGAO-DAVAO COASTAL RD., K1781 + (-586) - K1781 + 385, K1783 + 550 - K1784 + 560, K1785 + 062 - K1785 + 515, K1785 + 624 - K1786 + 007, K1787 + 640 - K1788 + 439, K1792 + 298 - K1792 + 808 | Region XI | Davao de Oro 1st DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.071 |
| 13 | 24LA0051CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY NAPNAPAN, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.057 |
| 14 | 16CF0217REPAIR/REHABILITATION OF JCT. TABLANG-GABALDON ROAD, LAUR, NUEVA ECIJA K0150+350.00 - K0150+560 | Region III | Nueva Ecija 2nd DEO | Completed | ₱19.2M | 100% | Medium risk60 | —-0.007 |
| 15 | 16CF0231REHABILITATION/IMPROVEMENT OF PROTECTION WORKS BRGY. SAN VICENTE, LAUR, NUEVA ECIJA STA. 0+843.11 TO STA. 1+174.11 | Region III | Nueva Ecija 2nd DEO | Completed | ₱14.4M | 100% | Medium risk59 | —-0.010 |
| 16 | 25CF0012FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PAMPANGA RIVER, BARANGAY PAGAS, CABANATUAN CITY, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱95.1M | 100% | Medium risk57 | —-0.078 |
| 17 | 23C00039BRIDGE PROGRAM-REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, STA. ROSA BRIDGE (BO1334LZ) ALONG STA. ROSA-TARLAC ROAD, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱105.3M | 53% | Medium risk53 | —-0.003 |
| 18 | 24CF0134SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE, ELISEO TRINIDAD ANGELES BRIDGE CROSSING PAMPANGA RIVER, SA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱235.2M | 73% | Medium risk52 | —-0.003 |
| 19 | 21CF0191LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL BRIDGES - CONSTRUCTION OF THE ELISEO TRINIDAD ANGELES BRIDGE ALONG PAMPANGA RIVER, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱183.4M | 100% | Medium risk52 | —-0.037 |
| 20 | 23CF0103CONSTRUCTION OF THE ELISEO TRINIDAD ANGELES BRIDGE ALONG PAMPANGA RIVER (PHASE II), STA. ROSA, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱104.6M | 100% | Medium risk52 | —-0.052 |
| 21 | 24L00335REHABILITATION AND IMPROVEMENT OF REVETMENT - FLOOD MITIGATION STRUCTURE ALONG SALOG RIVER LEADING TO MATIAO RIVER, PUROK 10, SITIO BANABA, BRGY. NAPNAPAN, PANTUKAN, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱76.6M | 39% | Medium risk52 | —-0.009 |
| 22 | 24L00337REHABILITATION AND IMPROVEMENT OF REVETMENT - FLOOD MITIGATION STRUCTURE ALONG MATIAO RIVER (DOWNSTREAM), BRGY. BONGBONG, PANTUKAN, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱76.3M | 94% | Medium risk52 | —-0.027 |
| 23 | 24C00030ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, DAANG MAHARLIKA (LZ), PROVINCE OF NUEVA ECIJA | Region III | Region III | Completed | ₱178.2M | 100% | Medium risk51 | —-0.075 |
| 24 | 23C00038ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-NUEVA ECIJA-AURORA ROAD, PROVINCE OF NUEVA ECIJA | Region III | Region III | Completed | ₱174.3M | 100% | Medium risk50 | —-0.074 |
| 25 | 23C00037ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, NEUVA ECIJA-AURORA ROAD, PROVINCE OF NUEVA ECIJA | Region III | Region III | Completed | ₱144.7M | 100% | Medium risk49 | —-0.077 |