Opening the dossier…
Opening the dossier…
Contractor dossier
321 projects on file, including joint ventures this contractor is part of.
Total projects
321
Total budget
₱25B
Average progress
91.9%
Completion rate
71.7%
Average risk score
63.4
High risk on average, out of 100
Flagged as unusual
30
9.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 291 | ₱22.6B | 63.2 | 18 | 92.9% |
| Region VII | 17 | ₱1.5B | 71.5 | 7 | 89.4% |
| National Capital Region | 11 | ₱901.6M | 58.2 | 4 | 72.7% |
| Region VIII | 1 | ₱27M | 49.3 | 1 | 58.5% |
| Cordillera Administrative Region | 1 | ₱34.1M | 47.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 148 | ₱12B | 61.6 | 8 | 96.1% |
| Roads | 103 | ₱7.3B | 62.5 | 1 | 92.2% |
| Buildings and Facilities | 39 | ₱3B | 60.2 | 4 | 89.2% |
| OTHER | 9 | ₱887.8M | 78.3 | 6 | 79.3% |
| GAA 2025 OO-2 | 7 | ₱1B | 93.0 | 3 | 68.0% |
| GAA 2025 SSP | 6 | ₱453.2M | 95.5 | 5 | 60.5% |
| Water Provision and Storage | 4 | ₱102.9M | 53.9 | 0 | 100.0% |
| Bridges | 3 | ₱128.4M | 57.9 | 3 | 74.8% |
| Bridges, Roads | 2 | ₱144.8M | 62.1 | 0 | 61.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25FK0069CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BRGY. TAGBAC-BRGY. PAWALA ROAD, DONSOL, SORSOGON ( | Region V | Sorsogon DEO | On-Going | ₱95.5M | 17% | High risk96 | Flagged0.030 |
| 25HO0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO TONGA (RIGHT SIDE), BRGY. MONTAÑEZA, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱97M | 82% | High risk96 | Flagged0.024 |
| 25HO0108CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO LINAYUGAN (LEFT SIDE), BRGY. MONTAÑEZA, MALABUYOC, CEB | Region VII | Cebu 7th DEO | On-Going | ₱97.3M | 86% | High risk96 | Flagged0.023 |
| 25FK0061CLUSTER XIX-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-1.) ROAD IMPROVEMENT OF BARANGAYS FROM CRISTO TO OGOD, | Region V | Sorsogon DEO | On-Going | ₱57.3M | 19% | High risk95 | Flagged0.021 |
| 25FK0013CLUSTER IV- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES 1.) CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY CENTRAL, DONSOL, SORSOGON 2.) | Region V | Sorsogon DEO | On-Going | ₱49M | 64% | High risk95 | Flagged0.008 |
| 25FK0012CLUSTER III - CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES 1.) CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PAMURAYAN, SORSOGON CITY, SORS | Region V | Sorsogon DEO | On-Going | ₱57.1M | 95% | High risk95 | —-0.002 |
| 25F00025ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, INAMIGAN RIVER, BARANGAY PAOLBO, | Region V | Region V | On-Going | ₱169.4M | 82% | High risk94 | —-0.000 |
| 25F00024ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, INAGYANAN RIVER, PACKAGE 1, BARAN | Region V | Region V | On-Going | ₱146.7M | 81% | High risk94 | —-0.004 |
| 25F00026ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TIGMAN RIVER, BARANGAY CAGSAO AND | Region V | Region V | On-Going | ₱142.5M | 87% | High risk94 | —-0.007 |
| 25FL0058CONST. OF FLOOD MITIGATION STRUCTURE, CADAC-AN RIVER, BARANGAY MONBON AND BARANGAY TINAMPO, IROSIN, | Region V | Sorsogon 2nd DEO | On-Going | ₱144M | 38% | High risk93 | Flagged0.009 |
| 25FL0057CONST. OF FLOOD MITIGATION STRUCTURE, CADAC-AN RIVER, BARANGAY BATANG - BARANGAY MACAWAYAN, IROSIN, | Region V | Sorsogon 2nd DEO | On-Going | ₱143M | 60% | High risk93 | Flagged0.006 |
| 25FL0050CONSTRUCTION OF CADAC-AN RIVER FLOOD MITIGATION STRUCTURE, BARANGAY GUMAPIA, IROSIN, SORSOGON | Region V | Sorsogon 2nd DEO | On-Going | ₱188.2M | 34% | High risk93 | Flagged0.020 |
| 25FL0006CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY CARRIEDO, GUBAT, SORSOGON | Region V | Sorsogon 2nd DEO | On-Going | ₱107.6M | 94% | High risk92 | —-0.012 |
| 23HO0273ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG YLAYA RIVER (PUROK MANGA SECTION), B | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 100% | High risk87 | Flagged0.056 |
| 23HO0257ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG YLAYA RIVER (PUROK MANGA SECTION), B | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 100% | High risk87 | Flagged0.056 |
| 24HO0162CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO ILIHAN - SITIO DAAN LUNGSO | Region VII | Cebu 7th DEO | On-Going | ₱94.8M | 91% | High risk87 | Flagged0.050 |
| 23FF0089CONSTRUCTION OF MULTI PURPOSE BUILDING NAGA CITY CENTER FOR SAFETY & RESILLIENCY (CESAR) PHASE 1 NAGA CITY CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱96M | 57% | High risk82 | Flagged0.018 |
| 23HO0258ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DIKE AT VALENCIA RIVER (UPSTREAM LEFT SIDE), ALEGRIA, CEB | Region VII | Cebu 7th DEO | On-Going | ₱75.7M | 100% | High risk82 | Flagged0.050 |
| 23HO0301CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF DIKE AT VALENCIA RIVER (UPSTREA | Region VII | Cebu 7th DEO | On-Going | ₱71M | 99% | High risk82 | Flagged0.039 |
| 24FF0063SIPAG;ACCESS ROAD &/OR BRIDGES FROM THE NATL. ROAD LEADING MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES-CONST. OF P-ALESTINA-YABU-CAROLINA ROAD PHASE 2 PILI CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱119.3M | 85% | High risk82 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0273ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG YLAYA RIVER (PUROK MANGA SECTION), B | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 100% | High risk87 | Flagged0.056 |
| 23HO0257ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG YLAYA RIVER (PUROK MANGA SECTION), B | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 100% | High risk87 | Flagged0.056 |
| 23HO0258ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DIKE AT VALENCIA RIVER (UPSTREAM LEFT SIDE), ALEGRIA, CEB | Region VII | Cebu 7th DEO | On-Going | ₱75.7M | 100% | High risk82 | Flagged0.050 |
| 24HO0162CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO ILIHAN - SITIO DAAN LUNGSO | Region VII | Cebu 7th DEO | On-Going | ₱94.8M | 91% | High risk87 | Flagged0.050 |
| 23HO0301CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF DIKE AT VALENCIA RIVER (UPSTREA | Region VII | Cebu 7th DEO | On-Going | ₱71M | 99% | High risk82 | Flagged0.039 |
| 19FB0265CONSTRUCTION OF BRIDGE AT BARANGAY 15, ILAWOD EAST TO SITIO GUYAM BRGY. 57 TAYSAN, ALBAY, LEGAZPI CITY | Region V | Albay 2nd DEO | On-Going | ₱48.2M | 91% | High risk64 | Flagged0.039 |
| 22OG0089RENOVATION OF OLD GYM, UP DILIMAN, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱99.5M | 52% | High risk63 | Flagged0.033 |
| 23FC0139CONSTRUCTION OF FLOOD CONTROL, BARANGAY MABILO I - MABILO II, LABO, CAMARINES NORTE (PACKAGE 3), BRGY. MABILO I - MABILO II, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱144.7M | 83% | High risk78 | Flagged0.031 |
| 21OG0156PGH DILIMAN ISF RESETTLEMENT, PHASE 2, UP DILIMAN, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱59.7M | 0% | Medium risk55 | Flagged0.031 |
| 25FK0069CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BRGY. TAGBAC-BRGY. PAWALA ROAD, DONSOL, SORSOGON ( | Region V | Sorsogon DEO | On-Going | ₱95.5M | 17% | High risk96 | Flagged0.030 |
| 21OG0155PGH DILIMAN ISF RESETTLEMENT, UP DILIMAN, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱59.7M | 12% | Medium risk55 | Flagged0.029 |
| 25HO0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO TONGA (RIGHT SIDE), BRGY. MONTAÑEZA, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱97M | 82% | High risk96 | Flagged0.024 |
| 25HO0108CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO LINAYUGAN (LEFT SIDE), BRGY. MONTAÑEZA, MALABUYOC, CEB | Region VII | Cebu 7th DEO | On-Going | ₱97.3M | 86% | High risk96 | Flagged0.023 |
| 18IH0020WIDENING OF PERMANENT BRIDGES ERENAS BRIDGE(B00245SM) ALONG DAANG MAHARLIKA(SM) SN ISIDRO - SAN JUANICO BR., BRGY. ERENAS, VICTORIA, N. SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱27M | 59% | Medium risk49 | Flagged0.023 |
| 25FK0061CLUSTER XIX-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-1.) ROAD IMPROVEMENT OF BARANGAYS FROM CRISTO TO OGOD, | Region V | Sorsogon DEO | On-Going | ₱57.3M | 19% | High risk95 | Flagged0.021 |
| 24O00211COMPLETION OF STRUCTURAL AND ARCHITECTURAL WORK OF RIZAL HALL, UP-MANILA - UNIVERSITY OF THE PHILIPPINES SYSTEM | National Capital Region | National Capital Region | On-Going | ₱97.3M | 35% | High risk63 | Flagged0.021 |
| 25FL0050CONSTRUCTION OF CADAC-AN RIVER FLOOD MITIGATION STRUCTURE, BARANGAY GUMAPIA, IROSIN, SORSOGON | Region V | Sorsogon 2nd DEO | On-Going | ₱188.2M | 34% | High risk93 | Flagged0.020 |
| 24FF0094CONST. OF MULTI PURPOSE BUILDING(NAGA CITY HOSPITAL DORMITORY),NAGA CITY CAMARINES SUR (PHASE II) | Region V | Camarines Sur 3rd DEO | On-Going | ₱48.9M | 12% | High risk79 | Flagged0.019 |
| 23FF0089CONSTRUCTION OF MULTI PURPOSE BUILDING NAGA CITY CENTER FOR SAFETY & RESILLIENCY (CESAR) PHASE 1 NAGA CITY CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱96M | 57% | High risk82 | Flagged0.018 |
| 22F00158CLUSTER IV-I: CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF SITIO GUIWANON SHORE PROTECTION STRUCTURES, BARANGA | Region V | Region V | On-Going | ₱112.7M | 99% | High risk81 | Flagged0.015 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 276 | 24HO0071CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG YLAYA RIVER (PUROK MANGA SECT | Region VII | Cebu 7th DEO | Completed | ₱57.9M | 100% | Medium risk55 | —-0.075 |
| 277 | 24HO0080CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT VALENCIA RIVER (UPSTREAM LEFT SI | Region VII | Cebu 7th DEO | Completed | ₱57.9M | 100% | Medium risk54 | —-0.074 |
| 278 | 17FK0070CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION /REHAB. OF CENTRAL DRAINAGE SYSTEM, MAGALLANES | Region V | Sorsogon DEO | Completed | ₱14.3M | 100% | Medium risk54 | —-0.056 |
| 279 | 24FK0100CLUSTER XXIX -CONVENGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) BASIC INFRASTRUCTURE PROGRAM (BIP) FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-1.) REHABILITATION OF VINISTAHAN SUR SEAWALL, MAGALLANES, SORSOGON 2.) CONST | Region V | Sorsogon DEO | On-Going | ₱38.2M | 100% | Medium risk54 | —-0.054 |
| 280 | 20FK0055NETWORK DEVELOPMENT-CONST. OF BY-PASS AND DIVERSION ROADS-BARCELONA-CASIGURAN DIVERSION ROAD, CASIGURAN SECTION, (PACKAGE 2) CASIGURAN, SORSOGON | Region V | Sorsogon DEO | Completed | ₱15M | 100% | Medium risk54 | —-0.099 |
| 281 | 22FK0034FLOOD MANAGEMENT PROGRAM-CONSTRUCTION_MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE OF MALBOG RIVER CONTROL DOWNSTREAM, CASTILLA, SORSOGON | Region V | Sorsogon DEO | Completed | ₱37.6M | 100% | Medium risk54 | —-0.088 |
| 282 | 20FL0036CONSTRUCTION OF PROTECTION WALL AT BUTAG, BULAN, SORSOGON | Region V | Sorsogon 2nd DEO | Completed | ₱31M | 100% | Medium risk53 | —-0.085 |
| 283 | 18FK0033FLOOD CONTROL & DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONSTRUCTION OF BALETE RIVER CONTROL UPSTREAM, BACON DISTRICT, SORSOGON CITY | Region V | Sorsogon DEO | Completed | ₱47.1M | 100% | Medium risk53 | —-0.086 |
| 284 | 22F00142CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-REHABILITATION OF REVETMENT ALONG MANAGA-NAGA RIVER, BULAN, SORSOGON | Region V | Region V | Completed | ₱43.4M | 100% | Medium risk53 | —-0.084 |
| 285 | 19FL0059CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. BULAWAN, IROSIN, SORSOGON | Region V | Sorsogon 2nd DEO | Completed | ₱47.5M | 100% | Medium risk52 | —-0.085 |
| 286 | 20FK0009CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF GABAO RIVER, DOWNSTREAM SORSOGON CITY | Region V | Sorsogon DEO | Completed | ₱37.9M | 100% | Medium risk52 | —-0.056 |
| 287 | 19OG0160CONSTRUCTION OF MULTI-PURPOSE BUILDING AT UNIVERSITY OF THE PHILIPPINES, DILIMAN. QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱40.9M | 100% | Medium risk52 | —-0.096 |
| 288 | 20OG0120CONSTRUCTION OF THE UP DILIMAN TENNIS COURTS AND CLUBHOUSE INCLUDING THE ACCESS ROAD, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱49.4M | 100% | Medium risk52 | —-0.044 |
| 289 | 22FL0022CONSTRUCTION OF SLOPE PROTECTION AT BARANGAY PADRE DIAZ, BULAN, SORSOGON | Region V | Sorsogon 2nd DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.085 |
| 290 | 24H00104CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BACANI RIVER FLOOD CONTROL STRUCTURE, CLARIN, BOHOL | Region VII | Region VII | On-Going | ₱57.9M | 94% | Medium risk52 | —-0.030 |
| 291 | 22FN0020CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF REVETMENT WALL UPSTREAM AT WARAS RIVER, STA.8+385 - STA.8+665 (BS) SAN ANDRES, STA. TERESITA, IRIGA CITY, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱77.2M | 100% | Medium risk52 | —-0.083 |
| 292 | 18FK0039FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONSTRUCTION OF BALETE RIVER CONTROL, DOWNSTREAM, BACON DISTRICT, SORSOGON CITY | Region V | Sorsogon DEO | Completed | ₱18.7M | 100% | Medium risk52 | —-0.086 |
| 293 | 22FL0020CONSTRUCTION OF REVETMENT WALL ALONG CADAC-AN RIVER, BARANGAY BUENAVISTA, MACAWAYAN-BATANG SECTION, | Region V | Sorsogon 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.084 |
| 294 | 18FK0003CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RAWIS RIVER CONTROL, BACON DISTRICT, SORSOGON CITY | Region V | Sorsogon DEO | Completed | ₱39.7M | 100% | Medium risk51 | —-0.086 |
| 295 | 23FF0008002:CONSTRUCTION /REHAB. OF FLOOD PROTECTION MEASURES ALONG HIBAGO RIVER FLOOD MITIGATION STRUCTURE LEFT SIDE DOWNSTREAM OF HIBAGO BRIDGE BRGY. PINIT OCAMPO CAMARINES SUR | Region V | Camarines Sur 3rd DEO | Completed | ₱57.2M | 100% | Medium risk51 | —-0.087 |
| 296 | 23FF0004002;CONSTRUCTION/REHAB, OF FLOOD PROTECTION MEASURES ALONG HIBAGO RIVER FLOOD MITIGATION STRUCTURE,RIGHT SIDE DOWNSTREAM OF HIBAGO BRIDGE BRGY. HIBAGO OCAMPO CAMARINES SUR | Region V | Camarines Sur 3rd DEO | Completed | ₱57.1M | 100% | Medium risk51 | —-0.087 |
| 297 | 22FN0028CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF REVETMENT WALL UPSTREAM AT WARAS RIVER, STA. 9+044-STA.9+304 (RS), STA. 8+980.80-STA. 9+280.8 (LS), SAN ANDRES, STA. TERESITA, IRIGA CITY | Region V | Camarines Sur 5th DEO | Completed | ₱77.2M | 100% | Medium risk51 | —-0.083 |
| 298 | 25HO0010CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT ALEGRIA RIVER (UPSTREAM), ALEGRIA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱48M | 32% | Medium risk51 | —-0.020 |
| 299 | 21FN0077REHABILITATION/IMPROVEMENT OF REVETMENT WALL DOWNSTREAM AT STA. TERESITA RIVER, IRIGA CITY, CAMARINES SUR (DOWNSTREAM RIGHT SIDE: BEG. STA. 8+666.80 - END STA. 9+044.00, LEFT SIDE: BEG. STA. 8+790.00 - END STA. 8+980.80) | Region V | Camarines Sur 5th DEO | Completed | ₱74.9M | 100% | Medium risk51 | —-0.083 |
| 300 | 18FK0007FLOOD MANAGEMENT PROGRAM-CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF GABAO RIVER CONTROL (UPSTREAM), BACON DISTRICT, SORSOGON CITY | Region V | Sorsogon DEO | Completed | ₱37.8M | 100% | Medium risk51 | —-0.086 |