Contractor dossier
321 projects on file, including joint ventures this contractor is part of.
Total projects
321
Total budget
₱25B
Average progress
91.9%
Completion rate
71.7%
Average risk score
63.4
High risk on average, out of 100
Flagged as unusual
30
9.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 291 | ₱22.6B | 63.2 | 18 | 92.9% |
| Region VII | 17 | ₱1.5B | 71.5 | 7 | 89.4% |
| National Capital Region | 11 | ₱901.6M | 58.2 | 4 | 72.7% |
| Region VIII | 1 | ₱27M | 49.3 | 1 | 58.5% |
| Cordillera Administrative Region | 1 | ₱34.1M | 47.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 148 | ₱12B | 61.6 | 8 | 96.1% |
| Roads | 103 | ₱7.3B | 62.5 | 1 | 92.2% |
| Buildings and Facilities | 39 | ₱3B | 60.2 | 4 | 89.2% |
| OTHER | 9 | ₱887.8M | 78.3 | 6 | 79.3% |
| GAA 2025 OO-2 | 7 | ₱1B | 93.0 | 3 | 68.0% |
| GAA 2025 SSP | 6 | ₱453.2M | 95.5 | 5 | 60.5% |
| Water Provision and Storage | 4 | ₱102.9M | 53.9 | 0 | 100.0% |
| Bridges | 3 | ₱128.4M | 57.9 | 3 | 74.8% |
| Bridges, Roads | 2 | ₱144.8M | 62.1 | 0 | 61.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25FK0069CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BRGY. TAGBAC-BRGY. PAWALA ROAD, DONSOL, SORSOGON ( | Region V | Sorsogon DEO | On-Going | ₱95.5M | 17% | High risk96 | Flagged0.030 |
| 25HO0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO TONGA (RIGHT SIDE), BRGY. MONTAÑEZA, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱97M | 82% | High risk96 | Flagged0.024 |
| 25HO0108CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO LINAYUGAN (LEFT SIDE), BRGY. MONTAÑEZA, MALABUYOC, CEB | Region VII | Cebu 7th DEO | On-Going | ₱97.3M | 86% | High risk96 | Flagged0.023 |
| 25FK0061CLUSTER XIX-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-1.) ROAD IMPROVEMENT OF BARANGAYS FROM CRISTO TO OGOD, | Region V | Sorsogon DEO | On-Going | ₱57.3M | 19% | High risk95 | Flagged0.021 |
| 25FK0013CLUSTER IV- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES 1.) CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY CENTRAL, DONSOL, SORSOGON 2.) | Region V | Sorsogon DEO | On-Going | ₱49M | 64% | High risk95 | Flagged0.008 |
| 25FK0012CLUSTER III - CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES 1.) CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PAMURAYAN, SORSOGON CITY, SORS | Region V | Sorsogon DEO | On-Going | ₱57.1M | 95% | High risk95 | —-0.002 |
| 25F00025ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, INAMIGAN RIVER, BARANGAY PAOLBO, | Region V | Region V | On-Going | ₱169.4M | 82% | High risk94 | —-0.000 |
| 25F00024ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, INAGYANAN RIVER, PACKAGE 1, BARAN | Region V | Region V | On-Going | ₱146.7M | 81% | High risk94 | —-0.004 |
| 25F00026ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TIGMAN RIVER, BARANGAY CAGSAO AND | Region V | Region V | On-Going | ₱142.5M | 87% | High risk94 | —-0.007 |
| 25FL0058CONST. OF FLOOD MITIGATION STRUCTURE, CADAC-AN RIVER, BARANGAY MONBON AND BARANGAY TINAMPO, IROSIN, | Region V | Sorsogon 2nd DEO | On-Going | ₱144M | 38% | High risk93 | Flagged0.009 |
| 25FL0057CONST. OF FLOOD MITIGATION STRUCTURE, CADAC-AN RIVER, BARANGAY BATANG - BARANGAY MACAWAYAN, IROSIN, | Region V | Sorsogon 2nd DEO | On-Going | ₱143M | 60% | High risk93 | Flagged0.006 |
| 25FL0050CONSTRUCTION OF CADAC-AN RIVER FLOOD MITIGATION STRUCTURE, BARANGAY GUMAPIA, IROSIN, SORSOGON | Region V | Sorsogon 2nd DEO | On-Going | ₱188.2M | 34% | High risk93 | Flagged0.020 |
| 25FL0006CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY CARRIEDO, GUBAT, SORSOGON | Region V | Sorsogon 2nd DEO | On-Going | ₱107.6M | 94% | High risk92 | —-0.012 |
| 23HO0273ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG YLAYA RIVER (PUROK MANGA SECTION), B | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 100% | High risk87 | Flagged0.056 |
| 23HO0257ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG YLAYA RIVER (PUROK MANGA SECTION), B | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 100% | High risk87 | Flagged0.056 |
| 24HO0162CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO ILIHAN - SITIO DAAN LUNGSO | Region VII | Cebu 7th DEO | On-Going | ₱94.8M | 91% | High risk87 | Flagged0.050 |
| 23FF0089CONSTRUCTION OF MULTI PURPOSE BUILDING NAGA CITY CENTER FOR SAFETY & RESILLIENCY (CESAR) PHASE 1 NAGA CITY CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱96M | 57% | High risk82 | Flagged0.018 |
| 23HO0258ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DIKE AT VALENCIA RIVER (UPSTREAM LEFT SIDE), ALEGRIA, CEB | Region VII | Cebu 7th DEO | On-Going | ₱75.7M | 100% | High risk82 | Flagged0.050 |
| 23HO0301CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF DIKE AT VALENCIA RIVER (UPSTREA | Region VII | Cebu 7th DEO | On-Going | ₱71M | 99% | High risk82 | Flagged0.039 |
| 24FF0063SIPAG;ACCESS ROAD &/OR BRIDGES FROM THE NATL. ROAD LEADING MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES-CONST. OF P-ALESTINA-YABU-CAROLINA ROAD PHASE 2 PILI CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱119.3M | 85% | High risk82 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0273ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG YLAYA RIVER (PUROK MANGA SECTION), B | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 100% | High risk87 | Flagged0.056 |
| 23HO0257ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG YLAYA RIVER (PUROK MANGA SECTION), B | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 100% | High risk87 | Flagged0.056 |
| 23HO0258ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DIKE AT VALENCIA RIVER (UPSTREAM LEFT SIDE), ALEGRIA, CEB | Region VII | Cebu 7th DEO | On-Going | ₱75.7M | 100% | High risk82 | Flagged0.050 |
| 24HO0162CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO ILIHAN - SITIO DAAN LUNGSO | Region VII | Cebu 7th DEO | On-Going | ₱94.8M | 91% | High risk87 | Flagged0.050 |
| 23HO0301CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF DIKE AT VALENCIA RIVER (UPSTREA | Region VII | Cebu 7th DEO | On-Going | ₱71M | 99% | High risk82 | Flagged0.039 |
| 19FB0265CONSTRUCTION OF BRIDGE AT BARANGAY 15, ILAWOD EAST TO SITIO GUYAM BRGY. 57 TAYSAN, ALBAY, LEGAZPI CITY | Region V | Albay 2nd DEO | On-Going | ₱48.2M | 91% | High risk64 | Flagged0.039 |
| 22OG0089RENOVATION OF OLD GYM, UP DILIMAN, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱99.5M | 52% | High risk63 | Flagged0.033 |
| 23FC0139CONSTRUCTION OF FLOOD CONTROL, BARANGAY MABILO I - MABILO II, LABO, CAMARINES NORTE (PACKAGE 3), BRGY. MABILO I - MABILO II, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱144.7M | 83% | High risk78 | Flagged0.031 |
| 21OG0156PGH DILIMAN ISF RESETTLEMENT, PHASE 2, UP DILIMAN, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱59.7M | 0% | Medium risk55 | Flagged0.031 |
| 25FK0069CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BRGY. TAGBAC-BRGY. PAWALA ROAD, DONSOL, SORSOGON ( | Region V | Sorsogon DEO | On-Going | ₱95.5M | 17% | High risk96 | Flagged0.030 |
| 21OG0155PGH DILIMAN ISF RESETTLEMENT, UP DILIMAN, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱59.7M | 12% | Medium risk55 | Flagged0.029 |
| 25HO0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO TONGA (RIGHT SIDE), BRGY. MONTAÑEZA, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱97M | 82% | High risk96 | Flagged0.024 |
| 25HO0108CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO LINAYUGAN (LEFT SIDE), BRGY. MONTAÑEZA, MALABUYOC, CEB | Region VII | Cebu 7th DEO | On-Going | ₱97.3M | 86% | High risk96 | Flagged0.023 |
| 18IH0020WIDENING OF PERMANENT BRIDGES ERENAS BRIDGE(B00245SM) ALONG DAANG MAHARLIKA(SM) SN ISIDRO - SAN JUANICO BR., BRGY. ERENAS, VICTORIA, N. SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱27M | 59% | Medium risk49 | Flagged0.023 |
| 25FK0061CLUSTER XIX-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-1.) ROAD IMPROVEMENT OF BARANGAYS FROM CRISTO TO OGOD, | Region V | Sorsogon DEO | On-Going | ₱57.3M | 19% | High risk95 | Flagged0.021 |
| 24O00211COMPLETION OF STRUCTURAL AND ARCHITECTURAL WORK OF RIZAL HALL, UP-MANILA - UNIVERSITY OF THE PHILIPPINES SYSTEM | National Capital Region | National Capital Region | On-Going | ₱97.3M | 35% | High risk63 | Flagged0.021 |
| 25FL0050CONSTRUCTION OF CADAC-AN RIVER FLOOD MITIGATION STRUCTURE, BARANGAY GUMAPIA, IROSIN, SORSOGON | Region V | Sorsogon 2nd DEO | On-Going | ₱188.2M | 34% | High risk93 | Flagged0.020 |
| 24FF0094CONST. OF MULTI PURPOSE BUILDING(NAGA CITY HOSPITAL DORMITORY),NAGA CITY CAMARINES SUR (PHASE II) | Region V | Camarines Sur 3rd DEO | On-Going | ₱48.9M | 12% | High risk79 | Flagged0.019 |
| 23FF0089CONSTRUCTION OF MULTI PURPOSE BUILDING NAGA CITY CENTER FOR SAFETY & RESILLIENCY (CESAR) PHASE 1 NAGA CITY CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱96M | 57% | High risk82 | Flagged0.018 |
| 22F00158CLUSTER IV-I: CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF SITIO GUIWANON SHORE PROTECTION STRUCTURES, BARANGA | Region V | Region V | On-Going | ₱112.7M | 99% | High risk81 | Flagged0.015 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 23FK0006CLUSTER IV-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES_FACITLITIES-1.) REHABILITATION OF SEAWALL, BRGY. BORORAN, DONSOL, 2.) CONSTRUCTION OF SEAWALL, SITIO DANCAL | Region V | Sorsogon DEO | Completed | ₱71.7M | 100% | High risk78 | —-0.030 |
| 27 | 23FF0092CONST. OF NAGA CITY CENTER FOR SAFETY & RESILLIENCY(NAGA CESAR), NAGA CITY CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱43M | 64% | High risk77 | Flagged0.006 |
| 28 | 19F00113REHABILITATION/IMPROVEMENT OF WARAS RIVER FLOOD CONTROL PROJECT (STA. ELENA-SAN JOSE SECTION) IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱190.1M | 100% | High risk75 | Flagged0.001 |
| 29 | 23FB0145CONSTRUCTION OF ROAD, BRGY. 62-HOMAPON, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱141.6M | 34% | High risk73 | —-0.025 |
| 30 | 25FF0054CSSP;BASIC INFRA PROGRAM(BIP)-ACCESS ROADS & OR BRIDGES FROM THE NATIONAL ROAD LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING FACILITIES-CONST OF ROADS WITH SLOPE PROTECTION WORKS OF PORO -SAN JOSE EAST -SAN JOSE WEST CANAMAN CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱146.4M | 2% | High risk73 | Flagged0.005 |
| 31 | 22F00008OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG YAWA RIVER, LEGAZPI CITY, ALBAY, LEGAZPI CITY, ALB | Region V | Region V | On-Going | ₱139.7M | 79% | High risk73 | —-0.015 |
| 32 | 25FB0026OO2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF DIKE ALONG SALUGAN RIVER, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.5M | 90% | High risk72 | —-0.047 |
| 33 | 25FB0042CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BULDINGS/FACILITIES CONSTRUCTION OF DIKE, UPSTREAM, BARANGAY TAYSAN, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 20% | High risk72 | —-0.024 |
| 34 | 25FB0027SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF DIKE, PHASE 2, BARANGAY KILICAO, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.2M | 52% | High risk72 | —-0.032 |
| 35 | 25FB0035SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF DIKE, PHASE 2, BARANGAY BONGA, LEGAZPI CITY | Region V | Albay 2nd DEO | On-Going | ₱93.4M | 73% | High risk72 | —-0.012 |
| 36 | 25FB0006OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION /MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF DIKE ALONG MANUMBALAY RIVER, MANITO, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 48% | High risk71 | —-0.031 |
| 37 | 25FB0009OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DIKE ALONG BALASBAS RIVER, MANITO, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 72% | High risk71 | —-0.038 |
| 38 | 22F00192CLUSTER III-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES:III-I-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ALCANTARA RIVER,MO | Region V | Region V | On-Going | ₱140.1M | 97% | High risk71 | —-0.021 |
| 39 | 24FK0025CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-SPECIAL ROAD FUND-MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG JCT. PUTIAO-PILAR-DONSOL ROAD-K0549+000 -K0554+000 PILAR, SORSOGON | Region V | Sorsogon DEO | Completed | ₱242.8M | 100% | High risk71 | —-0.067 |
| 40 | 22FO0103CONSTRUCTION OF REVETMENT ALONG SAN FRANCISCO RIVER, GUINOBATAN, ALBAY | Region V | Albay 3rd DEO | Completed | ₱99M | 100% | High risk71 | —-0.074 |
| 41 | 23FB0153BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLICINFRASTRUCTURES/FACILITIES CONSTRUCTION OF FLOOD MITIGATION STRUCTURE,BRGY. SALUGAN, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱98.9M | 100% | High risk71 | —-0.076 |
| 42 | 23FB0168BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BRGY. SUA, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱98.9M | 100% | High risk71 | —-0.076 |
| 43 | 22FB0098OO2- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF QUIRANGAY FLOOD CONTROL SYSTEM (BOTH SIDES), BRGY. QUIRANGAY, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.077 |
| 44 | 23FB0083SIPAG: CONSTRUCTION/UPGRADING OF BARANGAY SAN RAMON TO BARANGAY CANAROM ROAD, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.4M | 63% | High risk70 | —-0.041 |
| 45 | 24FB0197SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SALVACION-MIISI ROAD, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 32% | High risk70 | —-0.043 |
| 46 | 24FC0014CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MATOGDON RIVER, BARANGAY LUGUI, LABO, CAMARINES NORTE (PACKAGE I), BRGY. LUGUI, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱144.7M | 100% | High risk70 | —-0.063 |
| 47 | 23FB0156BIP: CONSTRUCTION OF ROAD, BRGY. 63-MARIAWA, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱94.1M | 22% | High risk70 | —-0.030 |
| 48 | 22FB0093OO2-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF COTMON-HOYOP-HOYOPAN FLOOD CONTROL SYSTEM, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱96.5M | 100% | High risk70 | —-0.028 |
| 49 | 22FB0094OO2-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BAGTANG-MAROROY FLOOD CONTROL SYSTEM, (BOTH SIDES), DARAGA, ALBAY | Region V | Albay 2nd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.077 |
| 50 | 24FC0027CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MATOGDON RIVER, BARANGAY LUGUI, LABO, CAMARINES NORTE (PACKAGE II), BRGY. LUGUI, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱144.7M | 100% | High risk70 | —-0.032 |