Contractor dossier
66 projects on file, including joint ventures this contractor is part of.
Total projects
66
Total budget
₱2.8B
Average progress
97.2%
Completion rate
84.8%
Average risk score
51.7
Medium risk on average, out of 100
Flagged as unusual
3
4.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 65 | ₱2.8B | 52.0 | 3 | 97.2% |
| Region III | 1 | ₱27.9M | 29.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 38 | ₱1.5B | 50.7 | 0 | 99.1% |
| Flood Control and Drainage | 12 | ₱484M | 47.7 | 0 | 99.9% |
| Bridges | 6 | ₱164.5M | 45.9 | 0 | 100.0% |
| Buildings and Facilities | 5 | ₱159.5M | 48.3 | 0 | 96.2% |
| OTHER | 3 | ₱355.5M | 84.2 | 2 | 76.9% |
| GAA 2025 OO-1 | 1 | ₱96.5M | 95.1 | 1 | 38.8% |
| Bridges, Roads | 1 | ₱45M | 48.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IA0010NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-PAWIKAN- ESPERANZA DIVERSION RD, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱96.5M | 39% | High risk95 | Flagged0.014 |
| 24I00401NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B-1 | Region VIII | Region VIII | On-Going | ₱182.9M | 33% | High risk92 | Flagged0.082 |
| 23I00117SIPAG - INTERJURISDICTIONAL ROADS AND/OR ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTION - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B - BARANGAY PAWING, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱144.6M | 98% | High risk83 | Flagged0.025 |
| 17ID0029ASSET PRESERVATION OF NATIONAL ROADS REHABILITATION /RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT -4(HDM-4)- STA. FE-PASTRANA-DAGAMI | Region VIII | Leyte 2nd DEO | Completed | ₱27.9M | 100% | High risk78 | —-0.038 |
| 24IC0071CONSTRUCTION OF FLOOD CONTROL ALONG LIMBUHAN RIVER, BRGY. LIMBUHAN DAKU, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱144.7M | 100% | High risk67 | —-0.061 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00401NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B-1 | Region VIII | Region VIII | On-Going | ₱182.9M | 33% | High risk92 | Flagged0.082 |
| 23I00117SIPAG - INTERJURISDICTIONAL ROADS AND/OR ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTION - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B - BARANGAY PAWING, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱144.6M | 98% | High risk83 | Flagged0.025 |
| 25IA0010NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-PAWIKAN- ESPERANZA DIVERSION RD, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱96.5M | 39% | High risk95 | Flagged0.014 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25IA0010NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-PAWIKAN- ESPERANZA DIVERSION RD, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱96.5M | 39% | High risk95 | Flagged0.014 |
| 2 | 24I00401NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B-1 | Region VIII | Region VIII | On-Going | ₱182.9M | 33% | High risk92 | Flagged0.082 |
| 3 | 23I00117SIPAG - INTERJURISDICTIONAL ROADS AND/OR ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTION - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B - BARANGAY PAWING, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱144.6M | 98% | High risk83 | Flagged0.025 |
| 4 | 17ID0029ASSET PRESERVATION OF NATIONAL ROADS REHABILITATION /RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT -4(HDM-4)- STA. FE-PASTRANA-DAGAMI | Region VIII | Leyte 2nd DEO | Completed | ₱27.9M | 100% | High risk78 | —-0.038 |
| 5 | 24IC0071CONSTRUCTION OF FLOOD CONTROL ALONG LIMBUHAN RIVER, BRGY. LIMBUHAN DAKU, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱144.7M | 100% | High risk67 | —-0.061 |
| 6 | 23IA0146CONSTRUCTION OF THREE (3) UNITS - TWO (2) STOREY SIX CLASSROOM, AND ONE (1) UN ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING, BOOL NATIONAL HIGH SCHOOL, BRGY. BOOL EAST, CULABA, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱54.9M | 100% | Medium risk57 | —-0.004 |
| 7 | 21IA0104CONSTRUCTION OF MULTI-PURPOSE BUILDING, BILIRANBRGY. PALENGKE, CAIBIRAN, BILIRAN (11.571208,124.58027)BRGY. POBLACION, KAWAYAN, BILIRAN (11.6876,124.3568) BRGY. PALENGKE, CAIBIRAN, BILIRAN (11.571294,124.580486) | Region VIII | Biliran DEO | Completed | ₱38.7M | 100% | Medium risk56 | —-0.088 |
| 8 | 17IA0022WIDENING ALONG NAVAL-CAIBIRAN CROSS COUNTRY ROAD; K1034+700 - K1036+000 11.58176, 124.4661 - 11.58161, 124.4678), PROVINCE OF BILIRAN | Region VIII | Biliran DEO | Completed | ₱37.4M | 100% | Medium risk56 | —-0.060 |
| 9 | 17IA0013CONSTRUCTION OF DRAINAGE ALONG BILIRAN CIRCUMFERENTIAL ROAD, K1050+870-K1051+839; K1052+840-K1053+875; K1066+800-K1067+050 (11.7037, 124.4118 - 11.7035, 124.4193; 11.7036, 124.4280-11.7018, 124.4323) (11.66, 124.5335-11.6583, 124.5350) PROVINCE OF BILIRAN | Region VIII | Biliran DEO | Completed | ₱18.7M | 100% | Medium risk56 | —-0.060 |
| 10 | 17IA0024OFF-CARRIAGEWAY ALONG BILIRAN CIRCUMFERENTIAL ROAD ..., PROVINCE OF BILIRAN | Region VIII | Biliran DEO | Completed | ₱27.9M | 100% | Medium risk56 | —-0.060 |
| 11 | 17IA0023REHAB. OF DAMAGED PAVED NATIONAL ROADS ALONG BILIRAN CIRCUMFERENTIAL ROAD ..., PROVINCE OF BILIRAN | Region VIII | Biliran DEO | Completed | ₱15.4M | 100% | Medium risk56 | —-0.061 |
| 12 | 20I00091CONSTRUCTION OF EVACUATION CENTER, BRGY. LARRAZABAL, NAVAL BILIRAN | Region VIII | Region VIII | Completed | ₱34.7M | 100% | Medium risk56 | —-0.095 |
| 13 | 23IA0117CONSTRUCTION OF MULTI-PURPOSE BLDG. PHASE II, (PUBLIC MARKET), BRGY. STO. ROSARIO, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱29.4M | 81% | Medium risk56 | —-0.039 |
| 14 | 21I00026CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ACCESS ROADS LEADING TO ULAN-ULAN FALLS, SAMPAO, ALMERIA, BILIRAN, BILIRAN DEO | Region VIII | Region VIII | Completed | ₱61.8M | 100% | Medium risk56 | —-0.092 |
| 15 | 20I00062NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR) - K0819+000 - K0820+044, SAMAR 2ND LD | Region VIII | Region VIII | Completed | ₱55.3M | 100% | Medium risk56 | —-0.089 |
| 16 | 21I00025CONSTRUCTION /IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ACCESS ROAD LEADING TO TALUSTUSAN FALLS, NAVAL, BILIRAN, BILIRAN DEO | Region VIII | Region VIII | Completed | ₱64.7M | 100% | Medium risk56 | —-0.091 |
| 17 | 22I00046CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - CARAY-CARAY - CABUNGAAN - LIBTONG ROAD IN SUPPORT OF THE AGRIBUSINESS: FOOD AND RESOURCE-BASED PROCESSING IN BRGY. LIBTONG, NAVAL, BILIRAN | Region VIII | Region VIII | Completed | ₱74M | 100% | Medium risk56 | —-0.085 |
| 18 | 20I00028CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - NRJ VILLA CONSUELO CONNECTING TO LIBTONG ROAD IN SUPPORT OF THE FOOD AND RESOURCE-BASED PROCESSING, NAVAL, BILIRAN | Region VIII | Region VIII | Completed | ₱68M | 100% | Medium risk55 | —-0.091 |
| 19 | 21I00027CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - CARAYCARAY - CABUNGAAN - LIBTONG ROAD IN SUPPORT OF THE AGRIBUSINESS: FOOD .... | Region VIII | Region VIII | Completed | ₱53.6M | 100% | Medium risk54 | —-0.094 |
| 20 | 22IA0052REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL ROAD | Region VIII | Biliran DEO | Completed | ₱48.7M | 100% | Medium risk53 | —-0.082 |
| 21 | 21IA0096CONSTRUCTION OF NAVAL DIVERSION ROAD ( RIVERSIDE TO PROVINCIAL HOSPITAL), BILIRAN (124.4051°, 11.55815° TO 124.5815°, 11.51713°) | Region VIII | Biliran DEO | Completed | ₱48.5M | 100% | Medium risk53 | —-0.093 |
| 22 | 22IA0093REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- BILIRAN CIRCUMFERENTIAL RD - K1048+400 - K1049+150 (11.694801, 124.392145 TO 11.696537, 124.398366) | Region VIII | Biliran DEO | Completed | ₱48.9M | 100% | Medium risk53 | —-0.086 |
| 23 | 22IA0014NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS BILIRAN CIRCUMFERENTIAL ROAD-K1019+200 -K1019+570, K1019+620 K1021+080 (11.52562°, 124.424225° - 11.528315°, 124.425292°, 11.529235°, 124.425365° - 11.539755°, 124.422803°) | Region VIII | Biliran DEO | Completed | ₱49M | 100% | Medium risk53 | —-0.090 |
| 24 | 21IA0007REHABILITATION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL ROAD - K1013+701 - K1014+397 (124.44555°, 11.5012° | Region VIII | Biliran DEO | Completed | ₱48.3M | 100% | Medium risk53 | —-0.096 |
| 25 | 22IA0099CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT)- NRJ VILLA CONSUELO CONNECTING TO LIB | Region VIII | Biliran DEO | On-Going | ₱48.3M | 100% | Medium risk53 | —-0.008 |