Contractor dossier
109 projects on file, including joint ventures this contractor is part of.
Total projects
109
Total budget
₱2.8B
Average progress
97.8%
Completion rate
88.1%
Average risk score
45.9
Medium risk on average, out of 100
Flagged as unusual
3
2.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 77 | ₱1.9B | 41.9 | 1 | 99.2% |
| Region I | 17 | ₱527.7M | 68.2 | 1 | 93.4% |
| Cordillera Administrative Region | 13 | ₱288.8M | 40.3 | 1 | 94.9% |
| Region VI | 2 | ₱106.6M | 48.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 55 | ₱1.3B | 44.4 | 0 | 99.3% |
| Flood Control and Drainage | 26 | ₱988.4M | 59.4 | 0 | 98.4% |
| Buildings and Facilities | 21 | ₱192.2M | 28.7 | 1 | 96.3% |
| Bridges | 4 | ₱137.4M | 49.9 | 0 | 86.9% |
| GAA 2025 OO-1 | 1 | ₱57.1M | 94.1 | 1 | 80.5% |
| GAA 2025 OO-2 | 1 | ₱96.3M | 93.3 | 1 | 90.3% |
| Water Provision and Storage | 1 | ₱2.6M | 29.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PC0028OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0681+473 - K0682+529 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱57.1M | 81% | High risk94 | Flagged0.003 |
| 25BC0012ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG C | Region II | Cagayan 2nd DEO | On-Going | ₱96.3M | 90% | High risk93 | Flagged0.000 |
| 18AA0243CONSTRUCTION OF FLOOD CONTROL STRUCTURES (L/B ALONG DINGRIS RIVER), TONOTON, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱9.4M | 100% | High risk72 | —-0.066 |
| 18AA0181CONSTRUCTION OF FLOOD CONTROL STRUCTURE (L/B ALONG GUISIT RIVER), BRGY. GAYAMAT, PIDDIG, ILOCOS NORT | Region I | Ilocos Norte 1st DEO | Completed | ₱18.7M | 100% | High risk71 | —-0.065 |
| 18AA0225COMPLETION OF FLOOD CONTROL STRUCTURES ALONG CURA RIVER, BRGY. CALAMBEG, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱28.2M | 100% | High risk71 | —-0.064 |
| 18AA0230COMPLETION OF FLOOD CONTROL STRUCTURE ALONG CURA RIVER, BRGY. BIMMANGA, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱9.5M | 100% | High risk71 | —-0.067 |
| 18A00052CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, MARUAYA-DUPITAC-CALAMBEG ESTANCIA ROAD LEADING TO LOWLAND COFFEE CONVERGENCE INITIATIVE PROJECT, BRGY. MARUAYA, PIDDIG, ILOCOS NORTE | Region I | Region I | Completed | ₱93.2M | 100% | High risk71 | —-0.068 |
| 18AA0226CONST. OF FLOOD CONTROL STRUCTURES (L/B ALONG DINGRIS RIVER), LIBNAOAN, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱18.8M | 100% | High risk71 | —-0.065 |
| 18AA0242CONSTRUCTION OF FLOOD CONTROL STRUCTURES (L/B ALONG GUISIT RIVER), CALLUZA, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱9.4M | 100% | High risk71 | —-0.066 |
| 18AA0231CONST. OF ESTANCIA F/C STRUCTURE ALONG GUISIT RIVER DUPITAC PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱9.5M | 100% | High risk71 | —-0.069 |
| 23AA0020CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG SARRAT PADSAN RIVER BASIN FROM BARANGAYS 18, 17, 10, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱39.2M | 100% | High risk70 | —-0.066 |
| 23AA0021CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG SARRAT PADSAN RIVER BASIN FROM SARRAT BRIDGE TO RIVERMOUNT, BARANGAY 18, SAN ISIDRO, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱39.2M | 92% | High risk70 | —-0.012 |
| 25AA0170FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAOAG RIVER BASIN AND TRIBUTARIES, BARANGAY 10, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47M | 79% | High risk70 | —-0.028 |
| 23AA0028CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PADSAN RIVER, DOWNSTREAM SARRAT BR., LEFTBANK, STO. TOMAS, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱39.2M | 100% | High risk70 | —-0.066 |
| 25AA0155FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAOAG RIVER BASIN, BARANGAY SAN MIGUEL, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱18.8M | 96% | High risk70 | —-0.036 |
| 18A00090CONSTRUCTION OF MISSING LINKS/ NEW ROADS - PIDDIG-CARASI-CALANASAN ROAD INCL. ROW, ILOCOS NORTE | Region I | Region I | Completed | ₱86.6M | 100% | High risk69 | —-0.070 |
| 23A00101CONSTRUCTION OF MISSING LINKS/ NEW ROADS - PIDDIG-CARASI-CALANASAN ROAD, ILOCOS NORTE | Region I | Region I | Completed | ₱28.9M | 100% | High risk69 | —-0.082 |
| 24A00609DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) LGU HOSPITALS - PIDDIG DISTRICT HOSPITAL ILOCOS NORTE | Region I | Region I | On-Going | ₱29M | 22% | High risk65 | Flagged0.031 |
| 18BB0186OO2:PROTECTLIVES&PROPERTIES AGAINST MAJOR FLDS-CONST/REHAB.OFFLD MITIGT'N FACILITIESW/N MAJORRIVERBASINS&PRINCIPAL RIVER-REHAB./IMPROV'T OF FLDMITIGT'N STRUCTURES&DRAINAGE SYSTEMS,IMPROV'TS FLD CTRLSYSCAG.RIVER BASIN,STA.0+000-STA. 0+242,GATTARAN SECT,CAG | Region II | Cagayan 1st DEO | Completed | ₱46.3M | 100% | High risk64 | —-0.039 |
| 21B00065OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER AT GAT | Region II | Region II | Completed | ₱94M | 100% | High risk62 | —-0.052 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24A00609DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) LGU HOSPITALS - PIDDIG DISTRICT HOSPITAL ILOCOS NORTE | Region I | Region I | On-Going | ₱29M | 22% | High risk65 | Flagged0.031 |
| 25PC0028OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0681+473 - K0682+529 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱57.1M | 81% | High risk94 | Flagged0.003 |
| 25BC0012ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG C | Region II | Cagayan 2nd DEO | On-Going | ₱96.3M | 90% | High risk93 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25PC0028OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0681+473 - K0682+529 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱57.1M | 81% | High risk94 | Flagged0.003 |
| 2 | 25BC0012ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG C | Region II | Cagayan 2nd DEO | On-Going | ₱96.3M | 90% | High risk93 | Flagged0.000 |
| 3 | 18AA0243CONSTRUCTION OF FLOOD CONTROL STRUCTURES (L/B ALONG DINGRIS RIVER), TONOTON, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱9.4M | 100% | High risk72 | —-0.066 |
| 4 | 18AA0181CONSTRUCTION OF FLOOD CONTROL STRUCTURE (L/B ALONG GUISIT RIVER), BRGY. GAYAMAT, PIDDIG, ILOCOS NORT | Region I | Ilocos Norte 1st DEO | Completed | ₱18.7M | 100% | High risk71 | —-0.065 |
| 5 | 18AA0225COMPLETION OF FLOOD CONTROL STRUCTURES ALONG CURA RIVER, BRGY. CALAMBEG, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱28.2M | 100% | High risk71 | —-0.064 |
| 6 | 18AA0230COMPLETION OF FLOOD CONTROL STRUCTURE ALONG CURA RIVER, BRGY. BIMMANGA, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱9.5M | 100% | High risk71 | —-0.067 |
| 7 | 18A00052CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, MARUAYA-DUPITAC-CALAMBEG ESTANCIA ROAD LEADING TO LOWLAND COFFEE CONVERGENCE INITIATIVE PROJECT, BRGY. MARUAYA, PIDDIG, ILOCOS NORTE | Region I | Region I | Completed | ₱93.2M | 100% | High risk71 | —-0.068 |
| 8 | 18AA0226CONST. OF FLOOD CONTROL STRUCTURES (L/B ALONG DINGRIS RIVER), LIBNAOAN, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱18.8M | 100% | High risk71 | —-0.065 |
| 9 | 18AA0242CONSTRUCTION OF FLOOD CONTROL STRUCTURES (L/B ALONG GUISIT RIVER), CALLUZA, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱9.4M | 100% | High risk71 | —-0.066 |
| 10 | 18AA0231CONST. OF ESTANCIA F/C STRUCTURE ALONG GUISIT RIVER DUPITAC PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱9.5M | 100% | High risk71 | —-0.069 |
| 11 | 23AA0020CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG SARRAT PADSAN RIVER BASIN FROM BARANGAYS 18, 17, 10, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱39.2M | 100% | High risk70 | —-0.066 |
| 12 | 23AA0021CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG SARRAT PADSAN RIVER BASIN FROM SARRAT BRIDGE TO RIVERMOUNT, BARANGAY 18, SAN ISIDRO, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱39.2M | 92% | High risk70 | —-0.012 |
| 13 | 25AA0170FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAOAG RIVER BASIN AND TRIBUTARIES, BARANGAY 10, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47M | 79% | High risk70 | —-0.028 |
| 14 | 23AA0028CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PADSAN RIVER, DOWNSTREAM SARRAT BR., LEFTBANK, STO. TOMAS, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱39.2M | 100% | High risk70 | —-0.066 |
| 15 | 25AA0155FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAOAG RIVER BASIN, BARANGAY SAN MIGUEL, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱18.8M | 96% | High risk70 | —-0.036 |
| 16 | 18A00090CONSTRUCTION OF MISSING LINKS/ NEW ROADS - PIDDIG-CARASI-CALANASAN ROAD INCL. ROW, ILOCOS NORTE | Region I | Region I | Completed | ₱86.6M | 100% | High risk69 | —-0.070 |
| 17 | 23A00101CONSTRUCTION OF MISSING LINKS/ NEW ROADS - PIDDIG-CARASI-CALANASAN ROAD, ILOCOS NORTE | Region I | Region I | Completed | ₱28.9M | 100% | High risk69 | —-0.082 |
| 18 | 24A00609DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) LGU HOSPITALS - PIDDIG DISTRICT HOSPITAL ILOCOS NORTE | Region I | Region I | On-Going | ₱29M | 22% | High risk65 | Flagged0.031 |
| 19 | 18BB0186OO2:PROTECTLIVES&PROPERTIES AGAINST MAJOR FLDS-CONST/REHAB.OFFLD MITIGT'N FACILITIESW/N MAJORRIVERBASINS&PRINCIPAL RIVER-REHAB./IMPROV'T OF FLDMITIGT'N STRUCTURES&DRAINAGE SYSTEMS,IMPROV'TS FLD CTRLSYSCAG.RIVER BASIN,STA.0+000-STA. 0+242,GATTARAN SECT,CAG | Region II | Cagayan 1st DEO | Completed | ₱46.3M | 100% | High risk64 | —-0.039 |
| 20 | 21B00065OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER AT GAT | Region II | Region II | Completed | ₱94M | 100% | High risk62 | —-0.052 |
| 21 | 20BB0098LOCAL PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - LOCAL INFRASTRUCTURE PROGRAM - ROAD OPENING AND REGRAVELLING OF PATUNUNGAN - PANANACPAN ROAD AT BGRY. PATUNUNGAN, SANTA ANA, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱9.5M | 100% | Medium risk59 | —-0.047 |
| 22 | 23B00020OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROAD - CAGAYAN VALLEY ROAD, K0511+(-104) - K0513+045; K0513+272 - K0513+870.19 | Region II | Region II | Completed | ₱97.5M | 100% | Medium risk57 | —-0.068 |
| 23 | 25PC0026OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - AYAGA-STA. MARCELA-FLORA-LASAM RD - K0677+000 - K0678+406 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱81.8M | 64% | Medium risk57 | —-0.035 |
| 24 | 20B00004ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: ROAD WIDENING-PRIMARY ROADS-CAGAYAN VALLEY ROAD; K0531+000-K0533+398, GATTARAN, CAGAYAN | Region II | Region II | Completed | ₱102.6M | 100% | Medium risk56 | —-0.064 |
| 25 | 25PC0016CSSP-CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRA PROG - ROLL-IT) - DAGUPAN-SALVACION ROAD IN SUPPORT OF HANDICRAFTS, FURNITURE, PINEAPPLE, BANANA, VEGET | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱9.7M | 97% | Medium risk55 | —-0.047 |