Contractor dossier
75 projects on file, including joint ventures this contractor is part of.
Total projects
75
Total budget
₱8.2B
Average progress
85.7%
Completion rate
50.7%
Below 70%
Average risk score
57.7
Medium risk on average, out of 100
Flagged as unusual
17
22.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 66 | ₱7.3B | 58.7 | 16 | 83.8% |
| Region XIII | 6 | ₱642.2M | 48.6 | 1 | 99.6% |
| Region X | 3 | ₱205.9M | 52.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 66 | ₱6.5B | 55.9 | 11 | 85.3% |
| Bridges, Roads | 4 | ₱971.7M | 67.3 | 2 | 98.9% |
| OTHER | 2 | ₱453.5M | 79.6 | 2 | 98.8% |
| Bridges | 2 | ₱196.3M | 55.9 | 1 | 100.0% |
| GAA 2025 SSP | 1 | ₱28.7M | 94.9 | 1 | 7.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25L00150CONSTRUCTION OF ROAD, SITIO TUCANGA, BARANGAY LIBERTAD TO BARANGAY PANGUBATAN, KAPUTIAN DISTRICT, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱28.7M | 7% | High risk95 | Flagged0.040 |
| 24N00164CONSTRUCTION OF SAN FRANCISCO, AGUSAN DEL SUR TO LIANGA, SURIGAO DEL SUR BYPASS ROAD, PACKAGE 1 | Region XIII | Region XIII | On-Going | ₱289.5M | 98% | High risk81 | Flagged0.036 |
| 22L00139CONSTRUCTION OF CONCRETE ROAD - NABUNTURAN - MACO ROAD (MAINIT, NABUNTURAN - MASARA, MACO), PACKAGE 35, DAVAO DE ORO | Region XI | Region XI | Completed | ₱164M | 100% | High risk79 | Flagged0.021 |
| 22L00138CONSTRUCTION OF CONCRETE BRIDGE - NABUNTURAN - MACO ROAD (MAINIT, NABUNTURAN - MASARA, MACO), PACKAGE 34, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱162.5M | 96% | High risk68 | Flagged0.007 |
| 21L00046CONSTRUCTION OF CONCRETE ROAD - ALTERNATE ROAD FROM REGION XI TO REGION X (JCT. DAVAO CITY DIVERSION ROAD - CATALUNAN GRANDE - TALANDAG - SUMIMAO - PAÑALUM - TAPAK - CABANGLASAN - AGLAYAN - MALAYBALAY), (PACKAGE H), DAVAO CITY | Region XI | Region XI | On-Going | ₱136.5M | 100% | High risk68 | Flagged0.001 |
| 24L00344CONSTRUCTION OF CONCRETE ROAD - PANAGA - PANDAITAN (SITIO TIBUNGOL) - PARADISE EMBAK - JCT. MABUHAY - PAÑALUM ROAD, PACKAGE 4, DAVAO CITY | Region XI | Region XI | On-Going | ₱140.3M | 35% | High risk67 | Flagged0.038 |
| 21L00045CONSTRUCTION OF CONCRETE ROAD - ALTERNATE ROAD FROM REGION XI TO REGION X (JCT. DAVAO CITY DIVERSION ROAD - CATALUNAN GRANDE - TALANDAG - SUMIMAO - PAÑALUM - TAPAK - CABANGLASAN - AGLAYAN - MALAYBALAY), (PACKAGE G), DAVAO CITY | Region XI | Region XI | On-Going | ₱127.8M | 100% | High risk67 | —-0.001 |
| 18L00157ALTERNATE RD FROM REGION XI TO REGION X (JCT. DAVAO CITY DIVERSION RD-CATALUNAN GRANDE-TALANDAG-SUMI | Region XI | Region XI | Completed | ₱544.9M | 100% | High risk66 | —-0.001 |
| 23L00064CONSTRUCTION OF GRAVEL ROAD-ALTERNATE ROAD FROM REGION XI TO REGION X (JCT. DAVAO CITY DIVERSION ROAD-CATALUNAN GRANDE-TALANDAG-SUMIMAO-PAÑALUM-TAPAK-CABANGLASAN-AGLAYAN, MALAYBALAY), DAVAO CITY | Region XI | Region XI | On-Going | ₱233M | 94% | High risk66 | —-0.008 |
| 22L00141CONSTRUCTION OF CONCRETE ROAD - MARAGUSAN - PANTUKAN ROAD (PANTUKAN SECTION), PACKAGE M, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱222.3M | 95% | High risk65 | Flagged0.005 |
| 22L00142CONSTRUCTION OF CONCRETE ROAD - MARAGUSAN - PANTUKAN ROAD (PANTUKAN SECTION), PACKAGE N, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱222.4M | 97% | High risk65 | Flagged0.003 |
| 24L00345CONSTRUCTION OF GRAVEL ROAD - MAWAB - MARAGUSAN - CARAGA ROAD, PACKAGE Q, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱132.8M | 59% | High risk65 | Flagged0.036 |
| 18L00089WIDENING (2 INTO 4 LANES) OF PRES. DIOSDADO P. MACAPAGAL NAT'L. HI-WAY INCL. ROW,(BRGY. DAWAN SECT. | Region XI | Region XI | Completed | ₱137.8M | 100% | High risk65 | —-0.057 |
| 24L00201CONSTRUCTION OF CONCRETE ROAD - MARAGUSAN - PANTUKAN ROAD, PACKAGE O, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱138.8M | 63% | High risk65 | —-0.018 |
| 18L00044CONC./WIDENING (2 INTO 4 LANES)/RECONST. OF BUHANGIN-TIGATTO-MANDUG-CALLAWA-FATIMA RD BYPASS,PACKAGE | Region XI | Region XI | Completed | ₱415.4M | 100% | High risk65 | —-0.019 |
| 22L00118CONSTRUCTION OF STO. TOMAS POBLACION - BRGY. MAGWAWA - BRGY. PANAGA ROAD, STO. TOMAS, PACKAGE 2, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱187.1M | 100% | High risk65 | Flagged0.022 |
| 22L00162CONSTRUCTION OF CONCRETE ROAD - ALTERNATE ROAD FROM REGION XI TO REGION X (JCT. DAVAO CITY DIVERSION ROAD - CATALUNAN GRANDE - TALANDAG - SUMIMAO - PAÑALUM - TAPAK - CABANGLASAN - AGLAYAN, MALAYBALAY), PACKAGE K, DAVAO CITY | Region XI | Region XI | On-Going | ₱168.5M | 88% | High risk65 | —-0.008 |
| 18L00090WIDENING (2 INTO 4 LANES) OF PRES. DIOSDADO P. MACAPAGAL NAT'L. H'WAY INCL ROW (BRGY. DAWAN,BRGY. IB | Region XI | Region XI | Completed | ₱135.8M | 100% | High risk65 | —-0.059 |
| 22L00163CONSTRUCTION OF CONCRETE ROAD - ALTERNATE ROAD FROM REGION XI TO REGION X (JCT. DAVAO CITY DIVERSION ROAD - CATALUNAN GRANDE - TALANDAG - SUMIMAO PAÑALUM - TAPAK - CABANGLASAN AGLAYAN, MALAYBALAY), PACKAGE L, DAVAO CITY | Region XI | Region XI | On-Going | ₱168.5M | 86% | High risk65 | —-0.008 |
| 22L00164CONSTRUCTION OF CONCRETE ROAD - ALTERNATE ROAD FROM REGION XI TO REGION X (JCT. DAVAO CITY DIVERSION ROAD - CATALUNAN GRANDE - TALANDAG - SUMIMAO - PAÑALUM - TAPAK - CABANGLASAN - AGLAYAN, MALAYBALAY), PACKAGE M, DAVAO CITY | Region XI | Region XI | On-Going | ₱168.5M | 83% | High risk64 | —-0.009 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25L00150CONSTRUCTION OF ROAD, SITIO TUCANGA, BARANGAY LIBERTAD TO BARANGAY PANGUBATAN, KAPUTIAN DISTRICT, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱28.7M | 7% | High risk95 | Flagged0.040 |
| 24L00344CONSTRUCTION OF CONCRETE ROAD - PANAGA - PANDAITAN (SITIO TIBUNGOL) - PARADISE EMBAK - JCT. MABUHAY - PAÑALUM ROAD, PACKAGE 4, DAVAO CITY | Region XI | Region XI | On-Going | ₱140.3M | 35% | High risk67 | Flagged0.038 |
| 24L00345CONSTRUCTION OF GRAVEL ROAD - MAWAB - MARAGUSAN - CARAGA ROAD, PACKAGE Q, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱132.8M | 59% | High risk65 | Flagged0.036 |
| 24N00164CONSTRUCTION OF SAN FRANCISCO, AGUSAN DEL SUR TO LIANGA, SURIGAO DEL SUR BYPASS ROAD, PACKAGE 1 | Region XIII | Region XIII | On-Going | ₱289.5M | 98% | High risk81 | Flagged0.036 |
| 22L00118CONSTRUCTION OF STO. TOMAS POBLACION - BRGY. MAGWAWA - BRGY. PANAGA ROAD, STO. TOMAS, PACKAGE 2, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱187.1M | 100% | High risk65 | Flagged0.022 |
| 22L00139CONSTRUCTION OF CONCRETE ROAD - NABUNTURAN - MACO ROAD (MAINIT, NABUNTURAN - MASARA, MACO), PACKAGE 35, DAVAO DE ORO | Region XI | Region XI | Completed | ₱164M | 100% | High risk79 | Flagged0.021 |
| 17L00190ROAD CONCRETING OF JCT. STO. NIÑO-GATONG-IGANG-BUTAY-NASILABAN-TALAINGOD, DAVAO DEL NORTE 1ST LD | Region XI | Region XI | Completed | ₱93.5M | 100% | Medium risk47 | Flagged0.013 |
| 25L00145CONSTRUCTION OF ROAD, BARANGAY TAGBITAN-AG TO SITIO TAYAPOC, BARANGAY AUNDANAO, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱66.8M | 0% | Medium risk54 | Flagged0.009 |
| 22L00138CONSTRUCTION OF CONCRETE BRIDGE - NABUNTURAN - MACO ROAD (MAINIT, NABUNTURAN - MASARA, MACO), PACKAGE 34, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱162.5M | 96% | High risk68 | Flagged0.007 |
| 25L00158CONSTRUCTION OF ROAD, BARANGAY LINOSUTAN TO BARANGAY STA. CRUZ, KAPUTIAN DISTRICT, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱57.3M | 1% | Medium risk54 | Flagged0.007 |
| 25L00149CONSTRUCTION OF ROAD, BARANGAY SAN ANTONIO TO SITIO DANAO, BARANGAY BALET, BABAK DISTRICT, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱28.7M | 1% | Medium risk48 | Flagged0.005 |
| 25L00143CONSTRUCTION OF ROAD, PUROK 4 BARANGAY SAN AGUSTIN TO BARANGAY MAMBAGO-B, BABAK DISTRICT, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱47.7M | 1% | Medium risk52 | Flagged0.005 |
| 25L00148CONSTRUCTION OF ROAD, PUROK 1, BARANGAY DEL MONTE TO BARANGAY TAGBAY, SAMAL DISTRICT, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱47.5M | 1% | Medium risk52 | Flagged0.005 |
| 22L00141CONSTRUCTION OF CONCRETE ROAD - MARAGUSAN - PANTUKAN ROAD (PANTUKAN SECTION), PACKAGE M, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱222.3M | 95% | High risk65 | Flagged0.005 |
| 22L00142CONSTRUCTION OF CONCRETE ROAD - MARAGUSAN - PANTUKAN ROAD (PANTUKAN SECTION), PACKAGE N, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱222.4M | 97% | High risk65 | Flagged0.003 |
| 19L00176CONSTRUCTION OF CONCRETE ROAD-MARAGUSAN-PANTUKAN ROAD,(PANTUKAN SECTION),PACKAGE D,COMPOSTELA VALLEY | Region XI | Region XI | On-Going | ₱90.5M | 91% | Medium risk58 | Flagged0.003 |
| 21L00046CONSTRUCTION OF CONCRETE ROAD - ALTERNATE ROAD FROM REGION XI TO REGION X (JCT. DAVAO CITY DIVERSION ROAD - CATALUNAN GRANDE - TALANDAG - SUMIMAO - PAÑALUM - TAPAK - CABANGLASAN - AGLAYAN - MALAYBALAY), (PACKAGE H), DAVAO CITY | Region XI | Region XI | On-Going | ₱136.5M | 100% | High risk68 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 21L00070CONSTRUCTION OF CONCRETE ROAD - ALTERNATE ROAD FROM REGION XI TO REGION X (JCT. DAVAO CITY DIVERSION ROAD - CATALUNAN GRANDE - TALANDAG - SUMIMAO - PAÑALUM - TAPAK - CABANGLASAN - AGLAYAN, MALAYBALAY), PACKAGE D, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱135.7M | 93% | High risk63 | —-0.007 |
| 27 | 24L00120CONSTRUCTION OF CONCRETE ROAD - ALTERNATE ROAD FROM REGION XI TO REGION X, PACKAGE P, DAVAO CITY | Region XI | Region XI | On-Going | ₱115.6M | 63% | High risk62 | —-0.031 |
| 28 | 24L00119CONSTRUCTION OF GRAVEL ROAD - ALTERNATE ROAD FROM REGION XI TO REGION X, PACKAGE O, DAVAO CITY | Region XI | Region XI | On-Going | ₱111.5M | 78% | High risk62 | —-0.035 |
| 29 | 20L00037CONSTRUCTION OF CONCRETE ROAD-BUHANGIN-TIGATTO-MANDUG-CALLAWA-FATIMA ROAD, PACKAGE 10, DAVAO CITY | Region XI | Region XI | On-Going | ₱107.5M | 98% | High risk62 | —-0.010 |
| 30 | 21L00048CONSTRUCTION OF CONCRETE ROAD - ALTERNATE ROAD FROM REGION XI TO REGION X (JCT. DAVAO CITY DIVERSION ROAD - CATALUNAN GRANDE - TALANDAG - SUMIMAO - PAÑALUM - TAPAK - CABANGLASAN AGLAYAN, MALAYBALAY) (PACKAGE J), DAVAO CITY | Region XI | Region XI | Completed | ₱112.6M | 100% | High risk61 | —-0.072 |
| 31 | 21L00047CONSTRUCTION OF CONCRETE ROAD - ALTERNATE ROAD FROM REGION XI TO REGION X (JCT. DAVAO CITY DIVERSION ROAD - CATALUNAN GRANDE - TALANDAG - SUMIMAO - PAÑALUM - TAPAK - CABANGLASAN - AGLAYAN - MALAYBALAY), (PACKAGE I), DAVAO CITY | Region XI | Region XI | Completed | ₱113.9M | 100% | High risk61 | —-0.069 |
| 32 | 22L00140CONSTRUCTION OF CONCRETE ROAD - NABUNTURAN - MACO ROAD (MAINIT, NABUNTURAN - MASARA, MACO), PACKAGE 36, DAVAO DE ORO | Region XI | Region XI | Completed | ₱96.5M | 100% | High risk61 | —-0.048 |
| 33 | 21L00069CONSTRUCTION OF CONCRETE ROAD - ALTERNATE ROAD FROM REGION XI TO REGION X (JCT. DAVAO CITY DIVERSION ROAD - CATALUNAN GRANDE - TALANDAG - SUMIMAO - PAÑALUM - TAPAK - CABANGLASAN - AGLAYAN - MALAYBALAY), PACKAGE C, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱103.2M | 98% | High risk61 | —-0.013 |
| 34 | 20L00060CONSTRUCTION OF GRAVEL ROAD-ALTERNATE ROAD FROM REGION XI TO REGION X, PACKAGE A, DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱100.7M | 100% | High risk60 | —-0.071 |
| 35 | 19L00176CONSTRUCTION OF CONCRETE ROAD-MARAGUSAN-PANTUKAN ROAD,(PANTUKAN SECTION),PACKAGE D,COMPOSTELA VALLEY | Region XI | Region XI | On-Going | ₱90.5M | 91% | Medium risk58 | Flagged0.003 |
| 36 | 19L00177CONSTRUCTION OF CONCRETE ROAD-MARAGUSAN-PANTUKAN ROAD,(PANTUKAN SECTION),PACKAGE E,COMPOSTELA VALLEY | Region XI | Region XI | Completed | ₱90.5M | 100% | Medium risk58 | —-0.053 |
| 37 | 19L00170CONST. OF CONCRETE ROAD-MAWAB-MARAGUSAN-CARAGA ROAD, SECTION 2, PACKAGE H, COMPOSTELA VALLEY | Region XI | Region XI | Completed | ₱91.5M | 100% | Medium risk58 | —-0.076 |
| 38 | 22L00063CONSTRUCTION OF CONCRETE ROAD - ALTERNATE ROAD FROM REGION XI TO REGION X (JCT. DAVAO CITY DIVERSION ROAD - CATALUNAN GRANDE - TALANDAG - SUMIMAO - PAÑALUM - TAPAK - CABANGLASAN - AGLAYAN, MALAYBALAY), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱90.5M | 95% | Medium risk58 | —-0.018 |
| 39 | 25L00100CONSTRUCTION OF CONCRETE ROAD - ALTERNATE ROAD FROM REGION XI TO REGION X (JCT DAVAO CITY DIVERSION ROAD - CATALUNAN GRANDE - TALANDAG - SUMIMAO - PANALUM - TAPAK - CABANGLASAN - AGLAYAN, MALAYBALAY), PACKAGE Q, DAVAO CITY | Region XI | Region XI | On-Going | ₱84.3M | 20% | Medium risk56 | —-0.025 |
| 40 | 22L00173CONSTRUCTION OF CONCRETE ROAD - MARAGUSAN PANTUKAN ROAD (PANTUKAN SECTION), PACKAGE P, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱79.6M | 70% | Medium risk56 | —-0.016 |
| 41 | 20LG0042ROAD WIDENING (2-4LANES ) ALONG PRES. DIOSDADO P. MACAPAGAL NAT'L HI-WAY - K1771+820 - K1772+530, K1773+603 - K1774+800 | Region XI | Davao Oriental 2nd DEO | Completed | ₱85.3M | 100% | Medium risk56 | —-0.068 |
| 42 | 21L00113ROAD WIDENING AT SPECIFIC LOCATIONS ALONG PRES. DIOSDADO P. MACAPAGAL NATL HIGHWAY (S01448MN) K1735+883 TO K1765+1005, DAVAO ORIENTAL | Region XI | Region XI | Completed | ₱70.7M | 100% | Medium risk55 | —-0.056 |
| 43 | 22L00165CONSTRUCTION OF CONCRETE ROAD - ALTERNATE ROAD FROM REGION XI TO REGION X (JCT. DAVAO CITY DIVERSION ROAD - CATALUNAN GRANDE - TALANDAG - SUMIMAO - PAÑALUM - TAPAK - CABANGLASAN - AGLAYAN, MALAYBALAY), PACKAGE N, DAVAO CITY | Region XI | Region XI | On-Going | ₱74.7M | 88% | Medium risk55 | —-0.026 |
| 44 | 22LG0002ROAD WIDENING (2-4 LANES ) ALONG PRES. DIOSDADO P. MACAPAGAL NATL HI-WAY - K1767 + 872 - K1769 + 200 , BANAYBANAY , DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱59.9M | 100% | Medium risk55 | —-0.077 |
| 45 | 25LG0013ROAD WIDENING (2-4 LANES) - PRES. DIOSDADO P.MACAPAGAL NATL HI-WAY - K1777 + 372 - K1778 + 858 | Region XI | Davao Oriental 2nd DEO | On-Going | ₱65.8M | 56% | Medium risk54 | —-0.035 |
| 46 | 19LG0094ROAD WIDENING (2-4 LANES ) ALONG PRES. DIOSDADO P. MACAPAGAL NATIONAL HIGHWAY - K1769+200 - K1770 + 200- K1771+000 ,K1772+600 -K1773 +603 , BANAYBANAY , DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱57.9M | 100% | Medium risk54 | —-0.079 |
| 47 | 25L00158CONSTRUCTION OF ROAD, BARANGAY LINOSUTAN TO BARANGAY STA. CRUZ, KAPUTIAN DISTRICT, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱57.3M | 1% | Medium risk54 | Flagged0.007 |
| 48 | 21L00033CONSTRUCTION OF ROAD - NABUNTURAN - MACO ROAD (MAINIT, NABUNTURAN - MASARA, MACO), (PACKAGE 3), DAVAO DE ORO | Region XI | Region XI | Completed | ₱62.7M | 100% | Medium risk54 | —-0.071 |
| 49 | 21L00032CONSTRUCTION OF ROAD - NABUNTURAN - MACO ROAD (MAINIT, NABUNTURAN - MASARA, MACO), (PACKAGE 2), DAVAO DE ORO | Region XI | Region XI | Completed | ₱62.7M | 100% | Medium risk54 | —-0.073 |
| 50 | 21L00031CONSTRUCTION OF ROAD - NABUNTURAN - MACO ROAD (MAINIT, NABUNTURAN - MASARA, MACO), (PACKAGE 1), DAVAO DE ORO | Region XI | Region XI | Completed | ₱62.7M | 100% | Medium risk54 | —-0.073 |