Contractor dossier
88 projects on file, including joint ventures this contractor is part of.
Total projects
88
Total budget
₱2B
Average progress
96.5%
Completion rate
88.6%
Average risk score
45.0
Medium risk on average, out of 100
Flagged as unusual
6
6.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 50 | ₱866.2M | 43.2 | 5 | 93.8% |
| Cordillera Administrative Region | 36 | ₱1.1B | 48.1 | 1 | 100.0% |
| Region III | 2 | ₱59.2M | 35.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 49 | ₱1B | 43.7 | 2 | 98.6% |
| Buildings and Facilities | 19 | ₱109.4M | 38.0 | 1 | 94.4% |
| Flood Control and Drainage | 10 | ₱690.5M | 52.6 | 1 | 89.8% |
| Bridges | 5 | ₱32.6M | 35.4 | 0 | 100.0% |
| OTHER | 4 | ₱135.1M | 76.2 | 1 | 94.4% |
| GAA 2025 SSP | 1 | ₱4.9M | 93.6 | 1 | 85.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BH0113BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI - PURPOSE BUILDING, RIZALUNA ELEMENTARY SCHOOL, BARANGAY RIZALUNA, CORDON, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱4.9M | 85% | High risk94 | Flagged0.007 |
| 25BH0201BASIC EDUCATION FACILITIES FUND (BEFF) - CONSTRUCTION OF CLASSROOM - CONSTRUCTION OF 1 STY 2 CL W/ TOILET, BANTAY PRIMARY SCHOOL, JONES, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱5M | 78% | High risk86 | Flagged0.047 |
| 20PG0030PAVING OF UNPAVED ROADS ALONG NATIONAL ROAD BANAUE-HUNGDUAN-BENGUET BDRY ROAD, KO376+433-KO376+453,KO376+753-KO376+782,KO377+305-KO377+345,KO377+912-KO378+117,KO378+342-KO378+488,KO379+080-KO379+151,KO379+260-KO379+437 | Cordillera Administrative Region | Ifugao 1st DEO | Completed | ₱57.9M | 100% | High risk74 | —-0.025 |
| 20PJ0020NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS- BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD - K0397 + 865 - K0398 + 500, K0400 + 040 - K0400 + 779, K0401 + 719 - K0402 + 820, K0403 + 000 - K0403 + 200, K0403 + 335 - K0404 + 319, K0404 + 87 | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱42.8M | 100% | High risk73 | —-0.026 |
| 20PG0031PAVING OF UNPAVED ROADS ALONG KIANGAN - TINOC - BUGUIAS ROAD, KO359+000-KO359+030,KO360+521-KO360+553,KO361+595-KO361+615,KO366+461-KO366+550 | Cordillera Administrative Region | Ifugao 1st DEO | Completed | ₱29.4M | 100% | High risk72 | —-0.026 |
| 23BH0260SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF BRGY. ARUBUB FLOOD CONTROL STRUCTURE, SECTION 3, JONES, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱94.1M | 0% | High risk71 | Flagged0.054 |
| 17PJ0004ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALFONSO LISTA - AURORA BDRY. ROAD - K0452 + 392 - K0453 + 849, KO453 + 950 - KO454 + 993 | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱95.9M | 100% | High risk64 | —-0.042 |
| 17PJ0009ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALFONSO LISTA - AURORA BDRY. ROAD - KO454 + 993-K0457+296 | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱88.2M | 100% | High risk63 | —-0.043 |
| 24BH0221SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDING /FACILITIES - CONSTRUCTION OF PAYAC FLOOD CONTROL STRUCTURE, STA. 0+000 - STA. 0+700, JONES, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96M | 98% | High risk62 | —-0.027 |
| 24BH0270SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDING /FACILITIES - CONSTRUCTION DABUBU PEQUEÑO FLOOD CONTROL STRUCTURE, STA. 0+000-STA.0+790, SAN AGUSTIN, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96.5M | 100% | High risk61 | —-0.028 |
| 23BH0140ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BARANGAY VIRGONEZA FLOOD CONTROL STRUCTURE, SECTION 2, | Region II | Isabela 4th DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.056 |
| 24BH0106SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES- CONSTRUCTION OF AYOD FLOOD CONTROL STRUCTURE, SECTION 1, DINAPIGUE, ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.054 |
| 17PJ0005NETWORK DEVELOPMENT - OFF- CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE BANAUE- MAYOYAO-A LISTA-ISABELA BDRY RD K0415+000-K0416+130, K0418+133-K0419+606, K0421+594-K0422+243, K0422+558-K0424+292, K0424+348-K0425+48 | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱35.2M | 100% | High risk61 | —-0.050 |
| 23BH0138ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM - CONSTRUCTION OF BARANGAY SINAOANGAN SUR FLOOD CONTROL STRUCTURE, SECTIO | Region II | Isabela 4th DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.057 |
| 16PJ0069ASSET PRESERVATION OF NATIONAL ROADS- REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES- UBAO- TAANG ROAD K0399-045-K0399+145, K0399+168-K0399+252, K0399+382-K0399+437, K0399+382-K0399+482, K0399+460-K0399+480 | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱10M | 100% | High risk60 | —-0.049 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23BH0260SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF BRGY. ARUBUB FLOOD CONTROL STRUCTURE, SECTION 3, JONES, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱94.1M | 0% | High risk71 | Flagged0.054 |
| 25BH0201BASIC EDUCATION FACILITIES FUND (BEFF) - CONSTRUCTION OF CLASSROOM - CONSTRUCTION OF 1 STY 2 CL W/ TOILET, BANTAY PRIMARY SCHOOL, JONES, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱5M | 78% | High risk86 | Flagged0.047 |
| 17PJ0011RESTORATION OF ERODED ROAD SHOULDER AND REMOVAL OF SLIDES CAUSED BY TYPHOON LANDO ALONG BANAUE-MAYOYAO-ALFONSO LISTA- ISABELA BOUNDARY ROAD, K0361+150-K0393+440, INTERMITENT SECTION | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱2.6M | 100% | Low risk24 | Flagged0.012 |
| 25BH0213REPAIR/REHABILITATION AND CONSTRUCTION OF FARM-TO-MARKET ROADS, CONCRETING OF BRGY. DALLAO FMR, BRGY. DALLAO, CORDON, ISABELA, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱14.9M | 34% | Medium risk45 | Flagged0.012 |
| 25BH0113BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI - PURPOSE BUILDING, RIZALUNA ELEMENTARY SCHOOL, BARANGAY RIZALUNA, CORDON, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱4.9M | 85% | High risk94 | Flagged0.007 |
| 25BH0091BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF SCHOOL MULTI-PURPOSE BUILDING, BARANGAY VILLA MIEMBAN, CORDON, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱2M | 0% | Medium risk48 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 18PI0027NETWORK DEVT.-MT. PROV.-ILOCOS SUR VIA KAYAN RD K0399+1279.5-K0400+164, K0400+184-K0400+394(S00531LZ | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱14.1M | 100% | Medium risk44 | —-0.081 |
| 52 | 20BG0112LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS - CONCRETING OF BRGY. UNION, GAMU, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱9.7M | 100% | Medium risk44 | —-0.072 |
| 53 | 18BF0099CONSTRUCTION OF STANDARD TWO-STOREY FOUR CLASSROOM SCHOOL BUILDING, QUEZON NATIONAL HIGH SCHOOL, QUEZON, ISABELA - BUILDING 2 | Region II | Isabela 2nd DEO | Completed | ₱9.3M | 100% | Medium risk43 | —-0.042 |
| 54 | 18BF0098CONSTRUCTION OF STANDARD TWO-STOREY FOUR CLASSROOM SCHOOL BUILDING,QUEZON NATIONAL HIGH SCHOOL, QUEZON, ISABELA - BUILDING 1 | Region II | Isabela 2nd DEO | Completed | ₱9.2M | 100% | Medium risk43 | —-0.042 |
| 55 | 23BH0003BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY DALIBUBON, JONES, ISABELA | Region II | Isabela 4th DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.086 |
| 56 | 23BK0069SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ABBAG ROAD, BARANGAY ABBAG, MADDELA, QUIRINO | Region II | Quirino DEO | Completed | ₱9.8M | 100% | Medium risk43 | —-0.087 |
| 57 | 20BG0148LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL BRIDGES - CONSTRUCTION OF OVERPASS (PHASE 3), NAGUILIAN, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.085 |
| 58 | 24BH0044BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES-CONSTRUCTION OF ROAD,BARANGAY VILLA MIEMBAN,CORDON,ISABELA | Region II | Isabela 4th DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.086 |
| 59 | 19BF0081ROAD CONCRETING OF BARANGAY ARA TO BARANGAY CAPUSERAN, BARANGAY ARA, BENITO SOLIVEN, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱4.8M | 100% | Medium risk43 | —-0.082 |
| 60 | 19BF0082ROAD CONCRETING OF BARANGAY VILLA LUZ TO BARANGAY MAGSAYSAY, BARANGAY VILLA LUZ, BENITO SOLIVEN, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱4.8M | 100% | Medium risk43 | —-0.082 |
| 61 | 19BF0080ROAD CONCRETING OF BARANGAY NACALMA, BENITO SOLIVEN, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱4.8M | 100% | Medium risk43 | —-0.082 |
| 62 | 20BH0060PREVENTIVE MAINTENANCE OF CONCRETE ROAD (ROAD REBLOCKING) K0329+770 - K0331+ | Region II | Isabela 4th DEO | Completed | ₱7.2M | 100% | Medium risk43 | —-0.086 |
| 63 | 23BH0006BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY PUNGPONGAN, JONES, ISABELA | Region II | Isabela 4th DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.087 |
| 64 | 21BK0040CONCRETING OF SINABBAGAN ROAD IN BARANGAY LANDINGAN NAGTIPUNAN, QUIRINO | Region II | Quirino DEO | Completed | ₱6.9M | 100% | Medium risk43 | —-0.086 |
| 65 | 20BH0009CONCRETING OF LOCAL ROADS, BRGY. DIBULO | Region II | Isabela 4th DEO | Completed | ₱5M | 100% | Medium risk43 | —-0.084 |
| 66 | 23BK0018BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY GREGORIO PIMENTEL, DIFFUN, QUIRINO | Region II | Quirino DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.084 |
| 67 | 23BK0070SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF CABUA-AN ROAD, BARANGAY CABUA-AN, MADDELA, QUIRINO | Region II | Quirino DEO | Completed | ₱6.7M | 100% | Medium risk43 | —-0.087 |
| 68 | 18BF0094CONSTRUCTION OF STANDARD TWO-STOREY FOUR CLASSROOM SCHOOL BUILDING, MALLIG NATIONAL HIGH SCHOOL - MAIN, MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱9.8M | 100% | Medium risk42 | —-0.043 |
| 69 | 24BH0142CONCRETING OF BRGY. DAPPIG FMR, BRGY. DAPPIG, SAN AGUSTIN, ISABELA | Region II | Isabela 4th DEO | Completed | ₱9.9M | 100% | Medium risk40 | —-0.030 |
| 70 | 24BH0148CONCRETING OF BRGY. VILLA MIEMBAN FMR, BRGY. VILLA MIEMBAN, CORDON, ISABELA | Region II | Isabela 4th DEO | Completed | ₱10M | 100% | Medium risk40 | —-0.031 |
| 71 | 19BF0124CONCRETING OF BRGY. LINGLINGAY FMR, BRGY. LINGLINGAY, GAMU, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱4.8M | 100% | Medium risk39 | —-0.027 |
| 72 | 19CN0045CONSTRUCTION OF DIKE ALONG MALUPA RIVER FLOOD CONTROL, MARIA AURORA, AURORA | Region III | Aurora DEO | Completed | ₱49M | 100% | Medium risk36 | —-0.089 |
| 73 | 19CN0001CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, BALER-CASIGURAN ROAD (BALER-DINADIAWAN), K0265+136, K0267+985, K0272+570, K0273+700, K0275+475, K0275+640, K0275+745, K0276+700, K0276+900, K0277+340, K0283+500... | Region III | Aurora DEO | Completed | ₱10.2M | 100% | Medium risk34 | —-0.101 |
| 74 | 20PJ0002REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES- HABBANG BRIDGE (B02208LZ) ALONG BANAUE- MAYOYAO- ALFONSO LISTA- ISABELA BRY. ROAD | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱3.8M | 100% | Low risk29 | —-0.044 |
| 75 | 20PJ0028REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES- KILING BRIDGE (B02216LZ) ALONG JUNCTION POTIA- MT. PROVINCE BOUNDARY ROAD, ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱3.4M | 100% | Low risk28 | —-0.041 |