252 projects on file, including joint ventures this contractor is part of.
Total projects
252
Total budget
₱5B
Average progress
99.5%
Completion rate
94.0%
Average risk score
19.8
Low risk on average, out of 100
Flagged as unusual
6
2.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 252 | ₱5B | 19.8 | 6 | 99.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 131 | ₱361.9M | 6.0 | 0 | 100.0% |
| Flood Control and Drainage | 47 | ₱2.1B | 29.5 | 0 | 100.0% |
| Roads | 42 | ₱1.2B | 26.5 | 0 | 99.9% |
| Bridges | 16 | ₱356M | 25.8 | 0 | 100.0% |
| GAA 2025 OO-2 | 6 | ₱713.3M | 91.2 | 0 | 95.1% |
| GAA 2025 OO-1 | 6 | ₱304.2M | 91.2 | 5 | 87.6% |
| Water Provision and Storage | 2 | ₱6.8M | 18.4 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱8.1M | 76.1 | 0 | 100.0% |
| OTHER | 1 | ₱34.1M | 74.3 | 1 | 80.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MH0010CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ISULAN JCT-NINOY AQUINO RD - K1800+500 - K1800+515, K1802+324 - K1802+344, K1808+552 - K1808+577, K1808+900 - K1808+935, K1809+640 - K1809+690, K1810+090 - K1810+115, K1810+245 - K1810+260, K1813+360 - K18 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱102.6M | 77% | High risk94 | Flagged0.017 |
| 25MH0007CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K1961+224 - K1961+270, K1961+431 - K1961+450, K1962+223 - K1962+271, K1962+979 - K1963+029, K1963+055 - K1963+080, K1963+130 - K1963+143, K1963+551 - K19 | Region XII | Region XII | On-Going | ₱81.7M | 81% | High risk92 | Flagged0.012 |
| 25MF0011CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BUAYAN RIVER, DOWNSTREAM (R/S), LUTAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱96.4M | 87% | High risk92 | —-0.003 |
| 25MF0010CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, ALA RIVER, PUROK MABUHAY, BRGY. BAMBAD, ISULAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱144.7M | 99% | High risk91 | —-0.001 |
| 25MH0025CONSTRUCTION OF RIVER BANK PROTECTION AT BARANGAY GAPOK, SENATOR NINOY AQUINO, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱106.1M | 100% | High risk91 | —-0.007 |
| 25MH0024CONSTRUCTION OF RIVER BANK PROTECTION AT UPPER MONO RIVER, BARANGAY TITULOK, BAGUMBAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱100.8M | 85% | High risk91 | —-0.002 |
| 25MF0009CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, ALA RIVER, TAGA SECTION - UPSTREAM (L/S),LAMBAYONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱144.6M | 100% | High risk91 | —-0.002 |
| 25MH0022CONSTRUCTION OF RIVER BANK PROTECTION (UPSTREAM LEFT SIDE), BARANGAY BARONGIS, PALIMBANG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱120.6M | 100% | High risk91 | —-0.004 |
| 25MH0005RECONSTRUCTION TO CONCRETE PAVEMENT - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K2029+246 - K2030+000, K2044+087 - K2044+387 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱18.4M | 98% | High risk90 | Flagged0.002 |
| 25MH0012CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - SNA-LEBAK-KALAMANSIG RD - K1851+050 - K1851+115, K1851+110 - K1851+160, K1851+495 - K1851+585, K1851+854 - K1851+875 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱34.2M | 92% | High risk90 | Flagged0.003 |
| 25MH0003RECONSTRUCTION TO CONCRETE PAVEMENT - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K1998+000 - K1999+197 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱21M | 99% | High risk90 | —-0.001 |
| 25MH0019WIDENING OF BRIDGE - BARANAYAN BR. (B00335MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱46.2M | 79% | High risk90 | Flagged0.009 |
| 25MH0101CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY KULAMAN, SEN. NINOY AQUINO, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱8.1M | 100% | High risk76 | —-0.019 |
| 25MF0018CONSTRUCTION OF CONCRETE ROAD - TACURONG EAST BY-PASS ROAD FROM BRGY. SAN ANTONIO-D'LEDESMA-SAN PABLO CONNECTING TO BRGY. KALANDAGAN BARANGAY ROAD IN SUPPORT OF BANANA AND PALM OIL INDUSTRIES, TACURONG CITY, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱34.1M | 80% | High risk74 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MH0010CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ISULAN JCT-NINOY AQUINO RD - K1800+500 - K1800+515, K1802+324 - K1802+344, K1808+552 - K1808+577, K1808+900 - K1808+935, K1809+640 - K1809+690, K1810+090 - K1810+115, K1810+245 - K1810+260, K1813+360 - K18 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱102.6M | 77% | High risk94 | Flagged0.017 |
| 25MH0007CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K1961+224 - K1961+270, K1961+431 - K1961+450, K1962+223 - K1962+271, K1962+979 - K1963+029, K1963+055 - K1963+080, K1963+130 - K1963+143, K1963+551 - K19 | Region XII | Region XII | On-Going | ₱81.7M | 81% | High risk92 | Flagged0.012 |
| 25MH0019WIDENING OF BRIDGE - BARANAYAN BR. (B00335MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱46.2M | 79% | High risk90 | Flagged0.009 |
| 25MF0018CONSTRUCTION OF CONCRETE ROAD - TACURONG EAST BY-PASS ROAD FROM BRGY. SAN ANTONIO-D'LEDESMA-SAN PABLO CONNECTING TO BRGY. KALANDAGAN BARANGAY ROAD IN SUPPORT OF BANANA AND PALM OIL INDUSTRIES, TACURONG CITY, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱34.1M | 80% | High risk74 | Flagged0.005 |
| 25MH0012CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - SNA-LEBAK-KALAMANSIG RD - K1851+050 - K1851+115, K1851+110 - K1851+160, K1851+495 - K1851+585, K1851+854 - K1851+875 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱34.2M | 92% | High risk90 | Flagged0.003 |
| 25MH0005RECONSTRUCTION TO CONCRETE PAVEMENT - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K2029+246 - K2030+000, K2044+087 - K2044+387 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱18.4M | 98% | High risk90 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25MH0010CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ISULAN JCT-NINOY AQUINO RD - K1800+500 - K1800+515, K1802+324 - K1802+344, K1808+552 - K1808+577, K1808+900 - K1808+935, K1809+640 - K1809+690, K1810+090 - K1810+115, K1810+245 - K1810+260, K1813+360 - K18 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱102.6M | 77% | High risk94 | Flagged0.017 |
| 2 | 25MH0007CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K1961+224 - K1961+270, K1961+431 - K1961+450, K1962+223 - K1962+271, K1962+979 - K1963+029, K1963+055 - K1963+080, K1963+130 - K1963+143, K1963+551 - K19 | Region XII | Region XII | On-Going | ₱81.7M | 81% | High risk92 | Flagged0.012 |
| 3 | 25MF0011CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BUAYAN RIVER, DOWNSTREAM (R/S), LUTAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱96.4M | 87% | High risk92 | —-0.003 |
| 4 | 25MF0010CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, ALA RIVER, PUROK MABUHAY, BRGY. BAMBAD, ISULAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱144.7M | 99% | High risk91 | —-0.001 |
| 5 | 25MH0025CONSTRUCTION OF RIVER BANK PROTECTION AT BARANGAY GAPOK, SENATOR NINOY AQUINO, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱106.1M | 100% | High risk91 | —-0.007 |
| 6 | 25MH0024CONSTRUCTION OF RIVER BANK PROTECTION AT UPPER MONO RIVER, BARANGAY TITULOK, BAGUMBAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱100.8M | 85% | High risk91 | —-0.002 |
| 7 | 25MF0009CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, ALA RIVER, TAGA SECTION - UPSTREAM (L/S),LAMBAYONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱144.6M | 100% | High risk91 | —-0.002 |
| 8 | 25MH0022CONSTRUCTION OF RIVER BANK PROTECTION (UPSTREAM LEFT SIDE), BARANGAY BARONGIS, PALIMBANG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱120.6M | 100% | High risk91 | —-0.004 |
| 9 | 25MH0005RECONSTRUCTION TO CONCRETE PAVEMENT - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K2029+246 - K2030+000, K2044+087 - K2044+387 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱18.4M | 98% | High risk90 | Flagged0.002 |
| 10 | 25MH0012CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - SNA-LEBAK-KALAMANSIG RD - K1851+050 - K1851+115, K1851+110 - K1851+160, K1851+495 - K1851+585, K1851+854 - K1851+875 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱34.2M | 92% | High risk90 | Flagged0.003 |
| 11 | 25MH0003RECONSTRUCTION TO CONCRETE PAVEMENT - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K1998+000 - K1999+197 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱21M | 99% | High risk90 | —-0.001 |
| 12 | 25MH0019WIDENING OF BRIDGE - BARANAYAN BR. (B00335MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱46.2M | 79% | High risk90 | Flagged0.009 |
| 13 | 25MH0101CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY KULAMAN, SEN. NINOY AQUINO, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱8.1M | 100% | High risk76 | —-0.019 |
| 14 | 25MF0018CONSTRUCTION OF CONCRETE ROAD - TACURONG EAST BY-PASS ROAD FROM BRGY. SAN ANTONIO-D'LEDESMA-SAN PABLO CONNECTING TO BRGY. KALANDAGAN BARANGAY ROAD IN SUPPORT OF BANANA AND PALM OIL INDUSTRIES, TACURONG CITY, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱34.1M | 80% | High risk74 | Flagged0.005 |
| 15 | 18MA0094CONSTRUCTION OF LISBONG RIVER RIPRAP/RIVERBANK PROTECTION (TAMONTAKA 4, DOWNSTREAM RIGHT SIDE), COTABATO CITY | Region XII | Cotabato City DEO | Completed | ₱48.5M | 100% | Medium risk50 | —-0.052 |
| 16 | 18MA0092CONSTRUCTION OF LISBONG RIVER RIPRAP/RIVERBANK PROTECTION (TAMONTAKA 4, RIGHT SIDE), COTABATO CITY | Region XII | Cotabato City DEO | Completed | ₱48.6M | 100% | Medium risk50 | —-0.052 |
| 17 | 18MA0093CONSTRUCTION OF LISBONG RIVER RIPRAP/RIVERBANK PROTECTION (TAMONTAKA 4, DOWNSTREAM LEFT SIDE), COTABATO CITY | Region XII | Cotabato City DEO | Completed | ₱48.6M | 100% | Medium risk50 | —-0.053 |
| 18 | 18MA0091CONSTRUCTION OF LISBONG RIVER RIPRAP/RIVERBANK PROTECTION (TAMONTAKA 4, LEFT SIDE), COTABATO CITY | Region XII | Cotabato City DEO | Completed | ₱48.7M | 100% | Medium risk50 | —-0.053 |
| 19 | 18MA0005CONSTRUCTION OF STEEL SHEET PILE (REVETMENT) ALONG RIO GRANDE DE MINDANAO (LUGAY-LUGAY SECTION PHASE III), COTABATO CITY | Region XII | Cotabato City DEO | Completed | ₱48.1M | 100% | Medium risk50 | —-0.053 |
| 20 | 22MH0023CONSTRUCTION OF RIVER BANK PROTECTION AT BRGY. LUPOKEN, PALIMBANG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱96.5M | 100% | Medium risk44 | —-0.060 |
| 21 | 17MH0039CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORT, SEAPORTS, AND DECLARED TOURISM DESTINATION, ACCESS ROAD LEADING TO SAN ROQUE PORT, K2032+000 - K2032+492(SECTION 1) K2032+492 - K2032+525 (SECTION 2), PALIMBANG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱15.4M | 100% | Medium risk42 | —-0.052 |
| 22 | 18M00029PAVING OF UNPAVED ROADS AWANG-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD, K1978+(-741)-K1978+(-575), K1989+540-K1959+634, K1989+711-K1989+817, K1992+809-K1993+000, K1995+373-K1995+603, K1995+612-K1995+720, K1995+860-K1996+056, K1996+163-K1996+293, K1999+ | Region XII | Region XII | Completed | ₱87.3M | 100% | Medium risk42 | —-0.044 |
| 23 | 17MH0041REPLACEMENT OF BRIDGE FROM TEMPORARY TO PERMANENT, BALONGLONG BRIDGE (B00331MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD, K2015+636 - K2015+957 (PCCP = 265 METERS) PALIMBANG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱36.8M | 100% | Medium risk40 | —-0.021 |
| 24 | 17MC0060WIDENING OF BRIDGE - BULATUKAN BR. (B00227MN) ALONG DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT) | Region XII | Cotabato 2nd DEO | Completed | ₱30.4M | 100% | Medium risk38 | —-0.028 |
| 25 | 17MC0073WIDENING OF BRIDGE - SAN VICENTE BR. (B00237MN), ALONG MAKILALA-ALLAH VALLEY RD | Region XII | Cotabato 2nd DEO | Completed | ₱38.2M | 100% | Medium risk37 | —-0.029 |