Contractor dossier
252 projects on file, including joint ventures this contractor is part of.
Total projects
252
Total budget
₱5B
Average progress
99.5%
Completion rate
94.0%
Average risk score
19.8
Low risk on average, out of 100
Flagged as unusual
6
2.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 252 | ₱5B | 19.8 | 6 | 99.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 131 | ₱361.9M | 6.0 | 0 | 100.0% |
| Flood Control and Drainage | 47 | ₱2.1B | 29.5 | 0 | 100.0% |
| Roads | 42 | ₱1.2B | 26.5 | 0 | 99.9% |
| Bridges | 16 | ₱356M | 25.8 | 0 | 100.0% |
| GAA 2025 OO-2 | 6 | ₱713.3M | 91.2 | 0 | 95.1% |
| GAA 2025 OO-1 | 6 | ₱304.2M | 91.2 | 5 | 87.6% |
| Water Provision and Storage | 2 | ₱6.8M | 18.4 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱8.1M | 76.1 | 0 | 100.0% |
| OTHER | 1 | ₱34.1M | 74.3 | 1 | 80.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MH0010CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ISULAN JCT-NINOY AQUINO RD - K1800+500 - K1800+515, K1802+324 - K1802+344, K1808+552 - K1808+577, K1808+900 - K1808+935, K1809+640 - K1809+690, K1810+090 - K1810+115, K1810+245 - K1810+260, K1813+360 - K18 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱102.6M | 77% | High risk94 | Flagged0.017 |
| 25MH0007CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K1961+224 - K1961+270, K1961+431 - K1961+450, K1962+223 - K1962+271, K1962+979 - K1963+029, K1963+055 - K1963+080, K1963+130 - K1963+143, K1963+551 - K19 | Region XII | Region XII | On-Going | ₱81.7M | 81% | High risk92 | Flagged0.012 |
| 25MF0011CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BUAYAN RIVER, DOWNSTREAM (R/S), LUTAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱96.4M | 87% | High risk92 | —-0.003 |
| 25MF0010CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, ALA RIVER, PUROK MABUHAY, BRGY. BAMBAD, ISULAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱144.7M | 99% | High risk91 | —-0.001 |
| 25MH0025CONSTRUCTION OF RIVER BANK PROTECTION AT BARANGAY GAPOK, SENATOR NINOY AQUINO, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱106.1M | 100% | High risk91 | —-0.007 |
| 25MH0024CONSTRUCTION OF RIVER BANK PROTECTION AT UPPER MONO RIVER, BARANGAY TITULOK, BAGUMBAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱100.8M | 85% | High risk91 | —-0.002 |
| 25MF0009CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, ALA RIVER, TAGA SECTION - UPSTREAM (L/S),LAMBAYONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱144.6M | 100% | High risk91 | —-0.002 |
| 25MH0022CONSTRUCTION OF RIVER BANK PROTECTION (UPSTREAM LEFT SIDE), BARANGAY BARONGIS, PALIMBANG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱120.6M | 100% | High risk91 | —-0.004 |
| 25MH0005RECONSTRUCTION TO CONCRETE PAVEMENT - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K2029+246 - K2030+000, K2044+087 - K2044+387 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱18.4M | 98% | High risk90 | Flagged0.002 |
| 25MH0012CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - SNA-LEBAK-KALAMANSIG RD - K1851+050 - K1851+115, K1851+110 - K1851+160, K1851+495 - K1851+585, K1851+854 - K1851+875 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱34.2M | 92% | High risk90 | Flagged0.003 |
| 25MH0003RECONSTRUCTION TO CONCRETE PAVEMENT - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K1998+000 - K1999+197 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱21M | 99% | High risk90 | —-0.001 |
| 25MH0019WIDENING OF BRIDGE - BARANAYAN BR. (B00335MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱46.2M | 79% | High risk90 | Flagged0.009 |
| 25MH0101CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY KULAMAN, SEN. NINOY AQUINO, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱8.1M | 100% | High risk76 | —-0.019 |
| 25MF0018CONSTRUCTION OF CONCRETE ROAD - TACURONG EAST BY-PASS ROAD FROM BRGY. SAN ANTONIO-D'LEDESMA-SAN PABLO CONNECTING TO BRGY. KALANDAGAN BARANGAY ROAD IN SUPPORT OF BANANA AND PALM OIL INDUSTRIES, TACURONG CITY, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱34.1M | 80% | High risk74 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MH0010CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ISULAN JCT-NINOY AQUINO RD - K1800+500 - K1800+515, K1802+324 - K1802+344, K1808+552 - K1808+577, K1808+900 - K1808+935, K1809+640 - K1809+690, K1810+090 - K1810+115, K1810+245 - K1810+260, K1813+360 - K18 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱102.6M | 77% | High risk94 | Flagged0.017 |
| 25MH0007CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K1961+224 - K1961+270, K1961+431 - K1961+450, K1962+223 - K1962+271, K1962+979 - K1963+029, K1963+055 - K1963+080, K1963+130 - K1963+143, K1963+551 - K19 | Region XII | Region XII | On-Going | ₱81.7M | 81% | High risk92 | Flagged0.012 |
| 25MH0019WIDENING OF BRIDGE - BARANAYAN BR. (B00335MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱46.2M | 79% | High risk90 | Flagged0.009 |
| 25MF0018CONSTRUCTION OF CONCRETE ROAD - TACURONG EAST BY-PASS ROAD FROM BRGY. SAN ANTONIO-D'LEDESMA-SAN PABLO CONNECTING TO BRGY. KALANDAGAN BARANGAY ROAD IN SUPPORT OF BANANA AND PALM OIL INDUSTRIES, TACURONG CITY, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱34.1M | 80% | High risk74 | Flagged0.005 |
| 25MH0012CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - SNA-LEBAK-KALAMANSIG RD - K1851+050 - K1851+115, K1851+110 - K1851+160, K1851+495 - K1851+585, K1851+854 - K1851+875 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱34.2M | 92% | High risk90 | Flagged0.003 |
| 25MH0005RECONSTRUCTION TO CONCRETE PAVEMENT - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K2029+246 - K2030+000, K2044+087 - K2044+387 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱18.4M | 98% | High risk90 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 22MF0029CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO PANABUNGAN, BRGY. TINUMIGUES, LAMBAYONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱35.9M | 100% | Low risk26 | —-0.070 |
| 77 | 22MF0030CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO TAGA, BRGY. TINUMIGUES, LAMBAYONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱36.1M | 100% | Low risk26 | —-0.072 |
| 78 | 18MF0041CONST. OF RIVER CONTROL ALONG TINUMIGUEZ, LAMBAYONG, SULTAN KUDARAT. | Region XII | Sultan Kudarat 1st DEO | Completed | ₱46.5M | 100% | Low risk26 | —-0.063 |
| 79 | 21MF0056CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO TAGA, BRGY. TINUMIGUES, LAMBAYONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱45.7M | 100% | Low risk26 | —-0.073 |
| 80 | 21MF0057CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO PANABUNGAN, BRGY. TINUMIGUES, LAMBAYONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱45M | 100% | Low risk26 | —-0.076 |
| 81 | 22MF0011CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALA RIVER (IMPAO SECTION), ISULAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱49M | 100% | Low risk26 | —-0.075 |
| 82 | 21MF0051CONSTRUCTION OF MULTI-PURPOSE CENTER, PUROK PAG-ASA, BRGY. SAN PABLO, TACURONG CITY, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱4.9M | 100% | Low risk26 | —-0.087 |
| 83 | 22MF0047CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SUBEN, PRESIDENT QUIRINO, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱4.9M | 100% | Low risk26 | —-0.086 |
| 84 | 21MF0029CALEAN - KALANDAGAN ROAD IN SUPPORT TO PALM OIL AND MANGO INDUSTRIES, TACURONG CITY, SULTAN KUDARAT, PACKAGE II | Region XII | Sultan Kudarat 1st DEO | Completed | ₱7.6M | 100% | Low risk26 | —-0.088 |
| 85 | 22MF0014CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALA RIVER (PANAS-BAMBAD SECTION), ISULAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱47.7M | 100% | Low risk26 | —-0.075 |
| 86 | 22MF0025CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY UDTONG PROPER, LAMBAYONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱36.1M | 100% | Low risk26 | —-0.076 |
| 87 | 23MH0016CONSTRUCTION OF RIVER BANK PROTECTION AT BARANGAY BARANAYAN, PALIMBANG SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱49M | 100% | Low risk26 | —-0.074 |
| 88 | 21MF0055CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. UDTONG PROPER, LAMBAYONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱45.3M | 100% | Low risk26 | —-0.074 |
| 89 | 21MF0058CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO CONCEPCION, BRGY. TINUMIGUES, LAMBAYONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱45.2M | 100% | Low risk26 | —-0.074 |
| 90 | 18MC0114CONSTRUCTION OF BUAL RIVER FLOOD CONTROL TULUNAN, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱29.4M | 100% | Low risk26 | —-0.073 |
| 91 | 18MF0036CONST. OF FLOOD CONTROL AT BARAS, TACURONG CITY. | Region XII | Sultan Kudarat 1st DEO | Completed | ₱27.9M | 100% | Low risk26 | —-0.071 |
| 92 | 18MH0045CONSTRUCTION OF SEA WALL PROTECTION, K0+000 - K0+300 BRGY. STA. CLARA, KALAMANSIG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱14.4M | 100% | Low risk26 | —-0.075 |
| 93 | 24MF0015CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALA RIVER (ALLAH BRIDGE - MAPANTIG), ISULAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱45M | 100% | Low risk25 | —-0.075 |
| 94 | 20MF0014CONSTRUCTION OF FLOOD MITIGATION STRUCTURE: CONSTRUCTION OF FLOOD CONTROL OF ALA RIVER BASIN (MAPANTIG SECTION), ISULAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱46.5M | 100% | Low risk25 | —-0.077 |
| 95 | 19MA0008CONSTRUCTION OF REVETMENT / STEEL PILE ALONG MATAMPAY RIVER AT BOUNDARY OF BRGY. ROSARY HEIGHTS 3 AND BRGY. POBLACION 3, COTABATO CITY | Region XII | Cotabato City DEO | Completed | ₱19.7M | 100% | Low risk25 | —-0.078 |
| 96 | 24MF0021CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALA RIVER (KALAWAG - DANSULI), ISULAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱44.9M | 100% | Low risk25 | —-0.076 |
| 97 | 17MH0049CONSTRUCTION OF RAIN WATER COLLECTOR SYSTEM (RWCS) | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱3.2M | 100% | Low risk25 | —-0.028 |
| 98 | 22MH0030CONSTRUCTION OF MAKIN BRIDGE ALONG LEBAK - ESPERANZA RD, SULTAN KUDARAT LEBAK, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱42.9M | 100% | Low risk25 | —-0.056 |
| 99 | 20MF0018CONSTRUCTION OF FLOOD MITIGATION STRUCTURE: CONSTRUCTION OF FLOOD CONTROL OF BUAYAN RIVER MAINDANG AREA, LUTAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱38.2M | 100% | Low risk25 | —-0.074 |
| 100 | 23MH0022CONSTRUCTION OF RIVER BANK PROTECTION/FLOOD CONTROL BARANGAY BIWANG, BAGUMBAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱41.9M | 100% | Low risk25 | —-0.076 |