Opening the dossier…
Opening the dossier…
Contractor dossier
8 projects on file, including joint ventures this contractor is part of.
Total projects
8
Total budget
₱380M
Average progress
98.4%
Completion rate
62.5%
Below 70%
Average risk score
58.0
Medium risk on average, out of 100
Flagged as unusual
1
12.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 8 | ₱380M | 58.0 | 1 | 98.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 3 | ₱173.1M | 49.5 | 0 | 100.0% |
| Flood Control and Drainage | 3 | ₱90.4M | 45.5 | 0 | 99.8% |
| GAA 2025 OO-2 | 1 | ₱66.9M | 91.1 | 0 | 97.7% |
| OTHER | 1 | ₱49.6M | 87.9 | 1 | 90.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25NG0022CONSTRUCTION OF FLOOD CONTROL STRUCTURE PROTECTING CAPALAYAN BRIDGE, BARANGAY CAPALAYAN, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱66.9M | 98% | High risk91 | —-0.015 |
| 24NG0116CONSTRUCTION OF FMR BRGY. SICO-SICO TO BRGY. SAN ISIDRO, GIGAQUIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱49.6M | 90% | High risk88 | Flagged0.047 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24NG0116CONSTRUCTION OF FMR BRGY. SICO-SICO TO BRGY. SAN ISIDRO, GIGAQUIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱49.6M | 90% | High risk88 | Flagged0.047 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25NG0022CONSTRUCTION OF FLOOD CONTROL STRUCTURE PROTECTING CAPALAYAN BRIDGE, BARANGAY CAPALAYAN, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱66.9M | 98% | High risk91 | —-0.015 |
| 2 | 24NG0116CONSTRUCTION OF FMR BRGY. SICO-SICO TO BRGY. SAN ISIDRO, GIGAQUIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱49.6M | 90% | High risk88 | Flagged0.047 |
| 3 | 17NF0125CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, KINABUTAN RIVER FLOOD CONTROL (1ST APPROACH UPSTREAM)/BRGY. LUNA, SURIGAO CITY, SURIGAO DEL NORTE, K 0+111 - K 0+394 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱29.3M | 100% | Medium risk57 | —-0.048 |
| 4 | 17NF0100REHAB./RECONST./UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PMS/HDM-4/SURIGAO-DAVAO COASTAL ROADS; (K1154+107-K1155+262; K1157+534-K1157+957; K1158+428-K1159+000; K1161+000-K1161+893 & K1181+883-K1182+000), PLACER AND CLAVER, SDN | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱80.2M | 100% | Medium risk51 | —-0.050 |
| 5 | 17NF0175OFF-CARRIAGEWAY IMPROVEMENT, TERTIARY ROADS/MAGPAYANG-MAINIT ROAD, K1160+000-K1160+322; K1160+353-K1160+928; K1161+025-K1162+254, MAINIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱47.7M | 100% | Medium risk49 | —-0.051 |
| 6 | 17NF0176OFF-CARRIAGEWAY IMPROVEMENT SECONDARY ROADS/ SURIGAO-DAVAO COASTAL ROAD: (K1166+000-K1166+255;K1166+332-K1167+205; K1167+227-K1167+820), BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱45.1M | 100% | Medium risk49 | —-0.053 |
| 7 | 22NG0033CONSTRUCTION OF BAOY RIVER CONTROL, BARANGAY DAYWAN, CLAVER, SURIGAO DEL NORTE/BRGY. DAYWAN, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱56.2M | 100% | Medium risk42 | —-0.067 |
| 8 | 25NG0054CONSTRUCTION OF DRAINAGE CANAL OF BARANGAY IPIL, GIGAQUIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 100% | Medium risk38 | —-0.037 |