Contractor dossier
47 projects on file, including joint ventures this contractor is part of.
Total projects
47
Total budget
₱403.9M
Average progress
100.0%
Completion rate
100.0%
Average risk score
12.9
Low risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 47 | ₱403.9M | 12.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 36 | ₱155.3M | 9.8 | 0 | 100.0% |
| Roads | 6 | ₱124.1M | 25.2 | 0 | 100.0% |
| Flood Control and Drainage | 3 | ₱119.6M | 25.4 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱3.7M | 13.8 | 0 | 100.0% |
| Bridges | 1 | ₱1.2M | 13.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Nothing to report.
No high-risk projects here.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 21MH0026CONSTRUCTION OF FLOOD CONTROL (ALA RIVER BASIN), ESPERANZA, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱67.5M | 100% | Medium risk36 | —-0.071 |
| 2 | 22MH0011ROAD WIDENING - MARBEL-ALLAH VALLEY-COTABATO RD - K1780+561 - K1781+000 ESPERANZA, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱57.1M | 100% | Medium risk33 | —-0.084 |
| 3 | 23MH0083CONSTRUCTION OF MULTIPURPOSE BUILDING, BRGY. SALUMPING, ESPERANZA, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱4.9M | 100% | Low risk28 | —-0.084 |
| 4 | 23MH0082CONSTRUCTION OF MULTIPURPOSE BUILDING, BRGY. ILIAN, ESPERANZA, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱4.9M | 100% | Low risk28 | —-0.086 |
| 5 | 20MH0019CONSTRUCTION OF FLOOD CONTROL (ALA RIVER), ESPERANZA, SULTAN KUDARAT ESPERANZA, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱47.5M | 100% | Low risk27 | —-0.074 |
| 6 | 22MH0001PREVENTIVE MAINTENANCE OF ROAD CONCRETE REBLOCKING - ISULAN JCT-NINOY AQUINO RD (S00730MN) - K1775 + (-601) - K1775 + 000 ESPERANZA, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱9.8M | 100% | Low risk27 | —-0.089 |
| 7 | 21MH0108CONCRETING OF ROADS FROM PUROK PROPER TO SITIO LAQUICON TO SITIO TULALI, BRGY. STO. NIÑO, BAGUMBAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱9.9M | 100% | Low risk26 | —-0.088 |
| 8 | 20MA0034CONCRETING OF SAMBEREN ROAD, BRGY. SAMBEREN, PARANG, MAGUINDANAO | Region XII | Cotabato City DEO | Completed | ₱29.7M | 100% | Low risk26 | —-0.090 |
| 9 | 18MH0137CONSTRUCTION OF TWO (2) STOREY - TWO (2) LABORATORY (ICT LAB) AT MANGUDADATU NATIONAL HIGH SCHOOL - VILLAMONTE ANNEX LEBAK, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱10.2M | 100% | Low risk23 | —-0.037 |
| 10 | 19MH0154CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) BRGY. KAPAYA, BAGUMBAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱4.9M | 100% | Low risk23 | —-0.088 |
| 11 | 18MH0114CONSTRUCTION OF FOUR (4) STOREY - TWELVE (12) CLASSROOMS AT ESPERANZA NATIONAL HIGH SCHOOL ESPERANZA, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱35.5M | 100% | Low risk23 | —-0.034 |
| 12 | 18MH0118CONSTRUCTION OF TWO (2) STOREY - TWO(2) LABORATORY (ICT LAB) AT DATU WASAY NATIONAL HIGH SCHOOL KALAMANSIG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱10.2M | 100% | Low risk21 | —-0.037 |
| 13 | 19MH0164CONCRETING OF CORNER KM 43, BANIGAN ROAD, BRGY. SABANAL FMR BRGY. SABANAL, KALAMANSIG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱5M | 100% | Low risk20 | —-0.031 |
| 14 | 20MH0112CONCRETING OF BRGY. KIADZAM TO SITIO DONGDONG, BRGY. KIADZAM FMR BRGY. KIADZAM, SEN. NINOY AQUINO, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱12.7M | 100% | Low risk19 | —-0.033 |
| 15 | 17MH0032CONSTRUCTION OF COVERED COURT (MULTI-PURPOSE BUILDING), BRGY. POBLACION, ESPERANZA, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱4.7M | 100% | Low risk18 | —-0.058 |
| 16 | 17MH0277CONSTRUCTION OF ONE (1) STOREY - FIVE (5) CLASSROOMS SCHOOL BUILDING AT GAPOK NATIONAL HIGH SCHOOL - LANGGAL ANNEX SEN. NINOY AQUINO, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱6.6M | 100% | Low risk17 | —-0.012 |
| 17 | 17ME0087CLUSTER 8: 1. CONST. OF (1) STOREY (2) CL BLDG. @ LASANG ES; 2. CONST. OF (1) STOREY (3) CL BLDG. @ MALAPATAN NHS-KINAM ANNEX, ALL OF MALAPATAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱6.3M | 100% | Low risk15 | —-0.010 |
| 18 | 16ME0176CONST. OF (2) UNITS, (1) STOREY, (4) CL SCHOOL BLDG., MILLONA UPPER SUYAN ES, MALAPATAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱8.1M | 100% | Low risk15 | —-0.010 |
| 19 | 17ME0153CLUSTER 12: 1. CONST. OF 1 STOREY 3 CL BLDG. @ TUSAN IP SCHOOL; 2. CONST. OF 1 STOREY 2 CL BLDG. @ TUSAN IP SCHOOL, ALL OF MALAPATAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱6.2M | 100% | Low risk15 | —-0.008 |
| 20 | 17ME0130CONST. OF (1) STOREY (4) CL BLDG. @ MILLONA UPPER SUYAN ES, MALAPATAN, SARANAGNI PROVINCE | Region XII | Sarangani DEO | Completed | ₱4.8M | 100% | Low risk14 | —-0.009 |
| 21 | 19MH0157CONSTRUCTION OF RAIN WATER COLLECTION SYSTEM E. ARCAÑO MEM. NATIONAL HIGH SCHOOL, LEBAK, SULTAN KUDARAT, KINUDALAN, ELEM. SCHOOL, LEBAK, SULTAN KUDARAT, | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱3.7M | 100% | Low risk14 | —-0.055 |
| 22 | 17ME0025CONST. OF PEDESTRIAN (FOOTBRIDGE @ SITIO SOFAN), BRGY. PAG-ASA, ALABEL, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱1.2M | 100% | Low risk14 | —-0.026 |
| 23 | 23MH0077CONSTRUCTION OF FLOOD CONTROL, BRGY. KANGKONG, ESPERANZA, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱4.6M | 100% | Low risk13 | —-0.074 |
| 24 | 17MH0006CONSTRUCTION OF SENIOR CITIZEN BUILDING (MPB - 7M X 8M), BRGY. POBLACION, ESPERANZA, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱970.2K | 100% | Low risk8 | —-0.058 |
| 25 | 17MH0005CONSTRUCTION OF SENIOR CITIZEN BUILDING (MPB - 7M X 8M), BRGY. PAMANTINGAN, ESPERANZA, SULTAN KUDARA | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱970.3K | 100% | Low risk8 | —-0.058 |