Contractor dossier
42 projects on file, including joint ventures this contractor is part of.
Total projects
42
Total budget
₱4.7B
Average progress
89.7%
Completion rate
85.7%
Average risk score
59.4
Medium risk on average, out of 100
Flagged as unusual
1
2.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 15 | ₱1.5B | 61.0 | 0 | 86.6% |
| Region XI | 8 | ₱978.4M | 55.6 | 0 | 100.0% |
| Cordillera Administrative Region | 7 | ₱1.1B | 60.1 | 0 | 100.0% |
| National Capital Region | 7 | ₱289M | 52.4 | 0 | 95.9% |
| Central Office | 4 | ₱672.5M | 72.0 | 1 | 75.0% |
| Region II | 1 | ₱96.1M | 59.4 | 0 | 0.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 17 | ₱2.3B | 58.5 | 0 | 96.8% |
| Flood Control and Drainage | 13 | ₱1.4B | 62.4 | 0 | 93.3% |
| Buildings and Facilities | 11 | ₱825.2M | 56.5 | 1 | 73.7% |
| Bridges, Roads | 1 | ₱168.5M | 67.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21DG0083CONSTRUCTION OF TAGAYTAY TOURIST (ICONIC TOWER) (PHASE I), BRGY. KAYBAGAL SOUTH, TAGAYTAY CITY | Region IV-A | Cavite 2nd DEO | Completed | ₱95M | 100% | High risk79 | —-0.060 |
| 20D00053PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF RIVER CONTROL ALONG SAN PEDRO RIVER (PHASE I), SAN PEDRO CITY, LAGUNA | Region IV-A | Region IV-A | Completed | ₱112.9M | 100% | High risk77 | —-0.043 |
| 17C00065REHABILITATION OF PAMPANGA RIVER BASIN, BARANGAY SAN NICOLAS, SAN SIMON, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱144.3M | 100% | High risk76 | —-0.056 |
| 18C00045REHABILITATION OF PAMPANGA RIVER BASIN AT BARANGAY STA. CRUZ AND SAN NICOLAS, SAN SIMON, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱111.7M | 100% | High risk75 | —-0.057 |
| 18C00046DIKING WITH SLOPE PROTECTION SACOBIA-BAMBAN RIVER, BAMBAN, TARLAC | Central Office | Flood Control Management Cluster | Completed | ₱99.4M | 100% | High risk74 | —-0.065 |
| 23D00180CONSTRUCTION OF RIVER PROTECTION STRUCTURE ALONG BALANAC RIVER (PACKAGE A), LAGUNA | Region IV-A | Region IV-A | On-Going | ₱168.6M | 42% | High risk68 | —-0.002 |
| 23D00067CONSTRUCTION OF REVETMENT AT BRGY. MAAHAS, PHASE 2, LOS BAÑOS, LAGUNA | Region IV-A | Region IV-A | Completed | ₱154.4M | 100% | High risk67 | —-0.062 |
| 18D00039FY 2018 DPWH INFRASTRUCTURE PROGRAM, ORGANIZATIONAL OUTCOME 1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS & DIVERSION ROADS, BIÑAN-CARMONA BYPASS ROAD, INCL.. BRIDGE & ROW, LAGUNA | Region IV-A | Region IV-A | Completed | ₱168.5M | 100% | High risk67 | —-0.049 |
| 18D00010FY 2018 INFRA. PROGRAM, ORGANIZATIONAL OUTCOME 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS; FLOOD MANAGEMENT PROGRAM, CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG CARMONA RIVER, BINAN SIDE, BINAN CITY, LAGUNA | Region IV-A | Region IV-A | Completed | ₱139.8M | 100% | High risk67 | —-0.064 |
| 18L00050IMPVT./CONC. OF GUADALUPE-LOWER TUGANAY RD CONNECTING CARMEN OVERLAND TRANSPORT TERMINAL IN SUPPORT | Region XI | Region XI | Completed | ₱169M | 100% | High risk65 | —-0.042 |
| 23D00057CONSTRUCTION OF LUMBAN - CALIRAYA ROAD - K0098 + 500 - K0098 + 860, K0099 + 020 - K0101 + 000 | Region IV-A | Region IV-A | On-Going | ₱149.7M | 46% | High risk65 | —-0.029 |
| 17P00014REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES, NUEVA VIZCAYA - IFUGAO - MT. PROVINCE ROAD, K0311+300 - K0311+500 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.7M | 100% | High risk64 | —-0.030 |
| 18L00191CONSTRUCTION OF HIJO RIVER FLOOD CONTROL WITH PROMENADE FROM BRGY. APOKON TO BARANGAY MAGDUM, TAGUM CITY, DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱188.5M | 100% | High risk64 | —-0.039 |
| 17P00041ASSET PRESERVATION OF NATIONAL ROAD - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES BANAUE-MAYOYAO-A.LISTA-ISABELA BDRY RD., K0344+339 - K0344+369, K0345+817 - K0345+837, K0346+694 - K0346 + 724, K0348+606 - K03 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | High risk64 | —-0.022 |
| 18L00052WIDENING (4 INTO 6 LANES) OF DAANG MAHARLIKA (MN) INCL. SLOPE PROTECTION & ROW (BRGY. NEW BALAMBAN & | Region XI | Region XI | Completed | ₱200.4M | 100% | High risk64 | —-0.031 |
| 18Z00041PROPOSED SEVEN (7) - STOREY GOVERNMENT PROCUREMENT POLICY BOARD (GPPB) BUILDING | Central Office | Buildings and Special Projects Management Cluster | On-Going | ₱317.1M | 0% | High risk63 | Flagged0.071 |
| 17P00063ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES, NUEVA VIZCAYA - IFUGAO - MT. PROVINCE ROAD, K0336+315 - K0336+341, K0341+402 - K0341+442, K0344+676 - K0344+706, K0351+201 - | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱52.5M | 100% | High risk63 | —-0.050 |
| 19OI0042CONSTRUCTION OF MULTI-PURPOSE BUILDING (AUDINASIUM) BARANGAY TALON 2, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.064 |
| 20D00032ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CARMONA - BIÑAN BYPASS ROAD, (BIÑAN SECTION), LAGUNA | Region IV-A | Region IV-A | Completed | ₱96.5M | 100% | High risk60 | —-0.087 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18Z00041PROPOSED SEVEN (7) - STOREY GOVERNMENT PROCUREMENT POLICY BOARD (GPPB) BUILDING | Central Office | Buildings and Special Projects Management Cluster | On-Going | ₱317.1M | 0% | High risk63 | Flagged0.071 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 21DG0083CONSTRUCTION OF TAGAYTAY TOURIST (ICONIC TOWER) (PHASE I), BRGY. KAYBAGAL SOUTH, TAGAYTAY CITY | Region IV-A | Cavite 2nd DEO | Completed | ₱95M | 100% | High risk79 | —-0.060 |
| 2 | 20D00053PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF RIVER CONTROL ALONG SAN PEDRO RIVER (PHASE I), SAN PEDRO CITY, LAGUNA | Region IV-A | Region IV-A | Completed | ₱112.9M | 100% | High risk77 | —-0.043 |
| 3 | 17C00065REHABILITATION OF PAMPANGA RIVER BASIN, BARANGAY SAN NICOLAS, SAN SIMON, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱144.3M | 100% | High risk76 | —-0.056 |
| 4 | 18C00045REHABILITATION OF PAMPANGA RIVER BASIN AT BARANGAY STA. CRUZ AND SAN NICOLAS, SAN SIMON, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱111.7M | 100% | High risk75 | —-0.057 |
| 5 | 18C00046DIKING WITH SLOPE PROTECTION SACOBIA-BAMBAN RIVER, BAMBAN, TARLAC | Central Office | Flood Control Management Cluster | Completed | ₱99.4M | 100% | High risk74 | —-0.065 |
| 6 | 23D00180CONSTRUCTION OF RIVER PROTECTION STRUCTURE ALONG BALANAC RIVER (PACKAGE A), LAGUNA | Region IV-A | Region IV-A | On-Going | ₱168.6M | 42% | High risk68 | —-0.002 |
| 7 | 23D00067CONSTRUCTION OF REVETMENT AT BRGY. MAAHAS, PHASE 2, LOS BAÑOS, LAGUNA | Region IV-A | Region IV-A | Completed | ₱154.4M | 100% | High risk67 | —-0.062 |
| 8 | 18D00039FY 2018 DPWH INFRASTRUCTURE PROGRAM, ORGANIZATIONAL OUTCOME 1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS & DIVERSION ROADS, BIÑAN-CARMONA BYPASS ROAD, INCL.. BRIDGE & ROW, LAGUNA | Region IV-A | Region IV-A | Completed | ₱168.5M | 100% | High risk67 | —-0.049 |
| 9 | 18D00010FY 2018 INFRA. PROGRAM, ORGANIZATIONAL OUTCOME 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS; FLOOD MANAGEMENT PROGRAM, CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG CARMONA RIVER, BINAN SIDE, BINAN CITY, LAGUNA | Region IV-A | Region IV-A | Completed | ₱139.8M | 100% | High risk67 | —-0.064 |
| 10 | 18L00050IMPVT./CONC. OF GUADALUPE-LOWER TUGANAY RD CONNECTING CARMEN OVERLAND TRANSPORT TERMINAL IN SUPPORT | Region XI | Region XI | Completed | ₱169M | 100% | High risk65 | —-0.042 |
| 11 | 23D00057CONSTRUCTION OF LUMBAN - CALIRAYA ROAD - K0098 + 500 - K0098 + 860, K0099 + 020 - K0101 + 000 | Region IV-A | Region IV-A | On-Going | ₱149.7M | 46% | High risk65 | —-0.029 |
| 12 | 17P00014REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES, NUEVA VIZCAYA - IFUGAO - MT. PROVINCE ROAD, K0311+300 - K0311+500 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.7M | 100% | High risk64 | —-0.030 |
| 13 | 18L00191CONSTRUCTION OF HIJO RIVER FLOOD CONTROL WITH PROMENADE FROM BRGY. APOKON TO BARANGAY MAGDUM, TAGUM CITY, DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱188.5M | 100% | High risk64 | —-0.039 |
| 14 | 17P00041ASSET PRESERVATION OF NATIONAL ROAD - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES BANAUE-MAYOYAO-A.LISTA-ISABELA BDRY RD., K0344+339 - K0344+369, K0345+817 - K0345+837, K0346+694 - K0346 + 724, K0348+606 - K03 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | High risk64 | —-0.022 |
| 15 | 18L00052WIDENING (4 INTO 6 LANES) OF DAANG MAHARLIKA (MN) INCL. SLOPE PROTECTION & ROW (BRGY. NEW BALAMBAN & | Region XI | Region XI | Completed | ₱200.4M | 100% | High risk64 | —-0.031 |
| 16 | 18Z00041PROPOSED SEVEN (7) - STOREY GOVERNMENT PROCUREMENT POLICY BOARD (GPPB) BUILDING | Central Office | Buildings and Special Projects Management Cluster | On-Going | ₱317.1M | 0% | High risk63 | Flagged0.071 |
| 17 | 17P00063ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES, NUEVA VIZCAYA - IFUGAO - MT. PROVINCE ROAD, K0336+315 - K0336+341, K0341+402 - K0341+442, K0344+676 - K0344+706, K0351+201 - | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱52.5M | 100% | High risk63 | —-0.050 |
| 18 | 19OI0042CONSTRUCTION OF MULTI-PURPOSE BUILDING (AUDINASIUM) BARANGAY TALON 2, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.064 |
| 19 | 20D00032ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CARMONA - BIÑAN BYPASS ROAD, (BIÑAN SECTION), LAGUNA | Region IV-A | Region IV-A | Completed | ₱96.5M | 100% | High risk60 | —-0.087 |
| 20 | 25BI0107BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, (NEW MUNICIPAL BUILDING) BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | On-Going | ₱96.1M | 0% | Medium risk59 | —-0.007 |
| 21 | 22DH0006ROAD WIDENING-TERTIARY ROAD, CAVINTI-CALIRAYA RD., K0105 + 410-K106 + 920, CAVINTI, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱92.3M | 100% | Medium risk59 | —-0.088 |
| 22 | 18P00013ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS (SECONDARY ROADS) BAGUIO - BONTOC ROAD K0267+810-K0268+000, K0270+000-K0270+178, K0279+00 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱210.4M | 100% | Medium risk58 | —-0.044 |
| 23 | 19P00002ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES (PRIMARY ROADS) ALONG KENNON ROAD, K0223+625 - K0223+707, K0224+562 - K0 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱193M | 100% | Medium risk58 | —-0.048 |
| 24 | 18P00023ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE (PRIMARY ROADS), KENNON ROAD, K0218+120 - K0218+740 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱277M | 100% | Medium risk57 | —-0.037 |
| 25 | 18P00014ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES (SECONDARY ROADS) GUREL-BOKOD-KABAYAN-BUGUIAS-ABATAN ROAD, BOKOD, BENGUE | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱123M | 100% | Medium risk57 | —-0.071 |