51 projects on file, including joint ventures this contractor is part of.
Total projects
51
Total budget
₱1.4B
Average progress
88.4%
Completion rate
70.6%
Average risk score
50.8
Medium risk on average, out of 100
Flagged as unusual
1
2.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 32 | ₱664.9M | 52.8 | 1 | 81.7% |
| National Capital Region | 13 | ₱275.8M | 47.0 | 0 | 100.0% |
| Region III | 5 | ₱371.3M | 45.1 | 0 | 98.9% |
| Central Office | 1 | ₱46.3M | 65.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 22 | ₱691.9M | 51.9 | 0 | 81.6% |
| Flood Control and Drainage | 20 | ₱498.7M | 47.9 | 0 | 93.0% |
| Buildings and Facilities | 7 | ₱134.5M | 46.6 | 0 | 99.5% |
| GAA 2025 SSP | 1 | ₱23.8M | 94.5 | 1 | 61.9% |
| OTHER | 1 | ₱9.6M | 70.6 | 0 | 95.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DN0079CONSTRUCTION OF ROAD, BLK. 2, 3, 4, 5 AND 6, PUROK 4 LUPANG ARENDA, BARANGAY STA. ANA, TAYTAY, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱23.8M | 62% | High risk95 | Flagged0.005 |
| 24C00106FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER, BARANGAY PINAMBARAN (DOWNSTREAM), SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱48.2M | 94% | High risk74 | —-0.027 |
| 24DN0148CONSTRUCTION OF MULTI-PURPOSE BUILDING (MULTI-PURPOSE HALL) AT BARANGAY SAN ISIDRO - KALAYAAN) ANGONO, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱9.6M | 96% | High risk72 | —-0.037 |
| 24DN0163CONSTRUCTION OF MULTI - PURPOSE BUILDING TAYTAY, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱9.6M | 95% | High risk71 | —-0.009 |
| 24DN0167CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - KULASISI - PANTAY ROAD (PHASE 3), BARANGAY SAN LUIS ANTIPOLO CITY, RIZAL (SECOND DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱48M | 91% | High risk69 | —-0.040 |
| 25DN0040CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PHASE 2) AT MALALIM NA SAPA 2, BINANGONAN, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱28.2M | 30% | High risk68 | —-0.011 |
| 25DN0045CONSTRUCTION OF FLOOD CONTROL STRUCTURE, MALALIM NA SAPA 2, BINANGONAN, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱28.2M | 35% | High risk68 | —-0.012 |
| 25DN0092CONSTRUCTION OF ROAD, BLK. 14, 15, 16, 17 AND 18, PUROK 4, LUPANG ARENDA, BARANGAY STA. ANA, TAYTAY, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱24.7M | 11% | High risk66 | —-0.022 |
| 25DN0069CONSTRUCTION OF ROAD AT ROAD 11, 12, 13, 14, 15, 16 AND 17, PUROK 3, LUPANG ARENDA, BARANGAY STA. ANA, TAYTAY, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱19M | 15% | High risk66 | —-0.023 |
| 25DN0094ROAD WIDENING - TERTIARY ROADS - MARIKINA - INFANTA RD - K0028+385 - K0029+000, ANTIPOLO CITY (SECOND DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱42.6M | 0% | High risk66 | —-0.020 |
| 24DN0160REHABILITATION OF ROAD WITH DRAINAGE SYSTEM, KULASISI - PANTAY ROAD (PHASE 2), BARANGAY SAN LUIS ANTIPOLO CITY, RIZAL (SECOND DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱11.5M | 91% | High risk66 | —-0.040 |
| 21CC0280IMPLEMENTATION OF CIVIL WORKS FOR THE CONCRETE SLOPE PROTECTION OF PLARIDEL BYPASS ACCESS ROAD NO. 2 UNDER THE ANNUAL WORK PROGRAM 3 ASSET PRESERVATION CONTRACT (APC) COMPONENT, ROAD UPGRADING AND PRESERVATION PROJECT, JICA LOAN AGREEMENT NO PH-P247, PLAR | Central Office | Roads Management Cluster I (Bilateral) | Completed | ₱46.3M | 100% | High risk65 | —-0.089 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DN0079CONSTRUCTION OF ROAD, BLK. 2, 3, 4, 5 AND 6, PUROK 4 LUPANG ARENDA, BARANGAY STA. ANA, TAYTAY, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱23.8M | 62% | High risk95 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 22DN0128CONSTRUCTION OF SLOPE PROTECTION, BARANGAY MAHABANG PARANG (PACKAGE 2) ANGONO, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱9.3M | 100% | Medium risk47 | —-0.086 |
| 27 | 24DN0015CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, MAHABANG PARANG CREEK BINANGONAN, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱10.8M | 100% | Medium risk47 | —-0.088 |
| 28 | 22DN0133CONSTRUCTION OF SLOPE PROTECTION, BRGY. MAHABANG PARANG (PACKAGE 2) ANGONO, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱9.4M | 100% | Medium risk47 | —-0.089 |
| 29 | 22DN0152REHABILITATION OF DIKE ALONG CAINTA RIVER IN GENESIS ROYALE II, BRGY. SAN ANDRES CAINTA, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.087 |
| 30 | 21DN0054OO1 - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - BINANGONAN DIVERSION ROAD K0034+(-009) - K0034+000, K0034+(-107) - K0034+(-009), K0034+000 - K0034+628, BINANGONAN, RIZAL | Region IV-A | Rizal 1st DEO | Completed | ₱24.5M | 100% | Medium risk47 | —-0.104 |
| 31 | 24DN0090ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - CORAZON C. AQUINO AVE. - K0018+(-096) - K0018+445 RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱18.6M | 100% | Medium risk47 | —-0.106 |
| 32 | 22DN0129REHABILITATION OF BAYTOWN ROAD, BARANGAY SAN ISIDRO AND BARANGAY KALAYAAN ANGONO, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱14.7M | 100% | Medium risk47 | —-0.108 |
| 33 | 24DO0067ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - PILILLA JCT. - JALA JALA RD. K0069+340 - K0069+700 | Region IV-A | Rizal 2nd DEO | On-Going | ₱19.6M | 64% | Medium risk46 | —-0.054 |
| 34 | 24DO0078CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SHORELINE ROAD TO SITIO DUPAX, BRGY. DALIG, CARDON | Region IV-A | Rizal 2nd DEO | Completed | ₱19.8M | 100% | Medium risk46 | —-0.107 |
| 35 | 23DN0064ACCESS ROAD AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF BAYTOWN ROAD PARTITION OF BARANGAY SAN ISIDRO AND BARANGAY KALAYAAN ANGONO, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱12.9M | 100% | Medium risk46 | —-0.108 |
| 36 | 20DN0137CONSTRUCTION/IMPROVEMENT OF CLIFFSIDE AND ROAD WIDENING WITH DRAINAGE SYSTEM, BRGY. MACAMOT, BINANGONAN, RIZAL | Region IV-A | Rizal 1st DEO | Completed | ₱9.7M | 100% | Medium risk46 | —-0.108 |
| 37 | 23DN0058ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD, PRAYER MOUNTAIN TO TANZA 2 ROAD, BARANGAY SAN JOSE, ANTIPOLO CITY, RIZAL (SECOND D | Region IV-A | Rizal 1st DEO | On-Going | ₱9.6M | 83% | Medium risk46 | —-0.055 |
| 38 | 20DN0186CONSTRUCTION OF 4 STOREY 8 CL., ANGONO NHS, ANGONO, RIZAL | Region IV-A | Rizal 1st DEO | Completed | ₱26.7M | 100% | Medium risk46 | —-0.055 |
| 39 | 18OF0110CONSTRUCTION OF SLOPE PROTECTION KAYBUKOT CREEK, BRGY. GULOD (PHASE II), Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱13.8M | 100% | Medium risk46 | —-0.088 |
| 40 | 20OF0168CONSTRUCTION/ REHABILITATION OF DRAINAGE ALONG MILLER ST., VETERANS, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱9.7M | 100% | Medium risk46 | —-0.089 |
| 41 | 18OF0036REHABILITATION IMPROVEMENT OF DRAINAGE SYSTEM OF BIAK NA BATO, Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱27.6M | 100% | Medium risk46 | —-0.089 |
| 42 | 20OF0029REHABILITATION OF DRAINAGE FORT SANTIAGO, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱19M | 100% | Medium risk46 | —-0.082 |
| 43 | 18OF0103IMPROVEMENT OF DRAINAGE ALONG MINDANAO AVE., EXT., Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱18.4M | 100% | Medium risk46 | —-0.088 |
| 44 | 20OF0284DRAINAGE IMPROVEMENT AT LORRAINE NORTH AND OLD SAMSON ROAD, BRGY. APOLONIO SAMSON, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱19M | 100% | Medium risk46 | —-0.088 |
| 45 | 17OF0047CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. PAYATAS, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱18.8M | 100% | Medium risk45 | —-0.065 |
| 46 | 18DN0208CONSTRUCTION OF 4 STOREY, 8 CLASSROOM, LUNSAD ES, BINANGONAN, RIZAL | Region IV-A | Rizal 1st DEO | Completed | ₱19.1M | 100% | Medium risk45 | —-0.056 |
| 47 | 23CI0110SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF DIKE WITH SLOPE PROTECTION AND GROUNDSILL ALONG QUITANGIL CREEK (LEFTSIDE), BRGYS SAN MIGUEL-TURU | Region III | Pampanga 3rd DEO | Completed | ₱72.3M | 100% | Medium risk34 | —-0.088 |
| 48 | 24CI0028SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION ALONG QUITANGIL RIVER, BARANGAY BUNDAGUL, MABALAC, | Region III | Pampanga 3rd DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.088 |
| 49 | 24CI0013SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG NAVALING CREEK, BRGY NAVALING, MAGALANG, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.092 |
| 50 | 20DO0019LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - REHABILITATION OF PANTAY-BUHANGIN ROAD, BRGY. DALIG AND BAGUMBAYAN TERESA, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱3.9M | 100% | Low risk25 | —-0.106 |