Contractor dossier
45 projects on file, including joint ventures this contractor is part of.
Total projects
45
Total budget
₱6.2B
Average progress
75.7%
Completion rate
46.7%
Below 70%
Average risk score
60.8
High risk on average, out of 100
Flagged as unusual
12
26.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 23 | ₱5.4B | 68.6 | 12 | 62.7% |
| National Capital Region | 15 | ₱270.8M | 48.8 | 0 | 93.3% |
| Region IV-A | 7 | ₱525.2M | 60.5 | 0 | 80.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 19 | ₱3.4B | 66.3 | 6 | 79.6% |
| Roads | 15 | ₱2.7B | 62.8 | 6 | 64.0% |
| Buildings and Facilities | 10 | ₱100.1M | 48.6 | 0 | 83.4% |
| Bridges | 1 | ₱10.4M | 46.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25E00018CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, BUSUANGA RIVER, BRGY. SAN AGUSTIN (UPSTREAM), SAN JOSE, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276.6M | 61% | High risk78 | Flagged0.030 |
| 25E00019CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, BUSUANGA RIVER, BRGY. SAN AGUSTIN (DOWNSTREAM), SAN JOSE, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276.4M | 59% | High risk78 | Flagged0.030 |
| 25E00020CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, BUSUANGA RIVER, BRGY. ADELA (DOWNSTREAM), RIZAL, OCC.MINDORO | Region IV-B | Region IV-B | On-Going | ₱275.8M | 60% | High risk78 | Flagged0.030 |
| 25E00006ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS- MINDORO WEST COASTAL ROAD, K0362+000-K0381+050 (INTERMITTENT SECTIONS), ABRA DE ILOG, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱233.2M | 30% | High risk73 | Flagged0.013 |
| 25E00274SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. DEL RAZON-BRGY. BULAKLAKAN, STA. 000+390-STA. 000+540; STA. 000+640-STA. 000+846. | Region IV-B | Region IV-B | On-Going | ₱231.4M | 0% | High risk73 | Flagged0.020 |
| 25E00275SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. DEL RAZON, STA. 000+000-STA. 000+371.35, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.3M | 0% | High risk73 | Flagged0.020 |
| 25E00273SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNTIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. BULAKLAKAN, STA. 000+860-STA. 001+237.91, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.1M | 0% | High risk73 | Flagged0.020 |
| 25E00278SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. QUINABIGAN, STA. 000+000-STA. 000+338.50, PINAMALAYAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.2M | 30% | High risk73 | Flagged0.012 |
| 25E00007ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS, MINDORO WEST COASTAL ROAD, ABRA DE ILOG, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.2M | 29% | High risk71 | Flagged0.017 |
| 25E00029CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE WITH ESPLANADE ALONG POLA RIVER, BRGY. LUMANGBAYAN SECTION (UPSTREAM/LS), STA. CRUZ, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.1M | 60% | High risk68 | Flagged0.001 |
| 25E00028CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE WITH ESPLANADE ALONG POLA RIVER, BRGY. LUMANGBAYAN SECTION (DOWNSTREAM/LS), STA. CRUZ, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231M | 60% | High risk68 | Flagged0.001 |
| 24E00149SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. AGUAS (DOWNSTREAM), SAN JOSE, OCC. M | Region IV-B | Region IV-B | On-Going | ₱193M | 86% | High risk68 | —-0.003 |
| 25E00209BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF FLOOD CONTROL STRUCTURE ALONG ABRA DE ILOG RIVER, SITIO KULI-KULI SECTION (RS), ARMADO, STA. 000+234-STA. 000+900, ABRA DE IL | Region IV-B | Region IV-B | On-Going | ₱284.3M | 30% | High risk68 | Flagged0.012 |
| 25DI0022CONSTRUCTION OF RIVER PROTECTION STRUCTURE NEAR SOUTHPEAK BRIDGE, SAN PEDRO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱93.9M | 44% | High risk68 | —-0.030 |
| 25E00026CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. MAGSIKAP (UPSTREAM), RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱221.9M | 64% | High risk68 | —-0.003 |
| 24E00032FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF PALUAN SHORE PROTECTION AND CAUSEWAY DEVELOPMENT, SITIO MALUGAO SECTION, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk67 | —-0.036 |
| 23E00018CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS & PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE AT LUMINTAO RIVER, SITIO LUMINTAO, BRGY. MALAWAAN, RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱193.7M | 100% | High risk67 | —-0.041 |
| 24E00117FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF PALUAN SHORE PROTECTION AND CAUSEWAY DEVELOPMENT, SITIO IPOL SECTION, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | Completed | ₱289.5M | 100% | High risk66 | —-0.031 |
| 24DI0017CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE NEAR BAYANBAYANAN BRIDGE (DOWNSTREAM), SAN PEDRO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱93.8M | 99% | High risk65 | —-0.040 |
| 24DI0043REHABILITATION OF REVETMENT ALONG TUNASAN RIVER (STAGGERED), CITY OF SAN PEDRO, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱96.4M | 94% | High risk64 | —-0.033 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25E00018CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, BUSUANGA RIVER, BRGY. SAN AGUSTIN (UPSTREAM), SAN JOSE, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276.6M | 61% | High risk78 | Flagged0.030 |
| 25E00019CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, BUSUANGA RIVER, BRGY. SAN AGUSTIN (DOWNSTREAM), SAN JOSE, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276.4M | 59% | High risk78 | Flagged0.030 |
| 25E00020CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, BUSUANGA RIVER, BRGY. ADELA (DOWNSTREAM), RIZAL, OCC.MINDORO | Region IV-B | Region IV-B | On-Going | ₱275.8M | 60% | High risk78 | Flagged0.030 |
| 25E00274SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. DEL RAZON-BRGY. BULAKLAKAN, STA. 000+390-STA. 000+540; STA. 000+640-STA. 000+846. | Region IV-B | Region IV-B | On-Going | ₱231.4M | 0% | High risk73 | Flagged0.020 |
| 25E00275SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. DEL RAZON, STA. 000+000-STA. 000+371.35, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.3M | 0% | High risk73 | Flagged0.020 |
| 25E00273SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNTIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. BULAKLAKAN, STA. 000+860-STA. 001+237.91, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.1M | 0% | High risk73 | Flagged0.020 |
| 25E00007ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS, MINDORO WEST COASTAL ROAD, ABRA DE ILOG, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.2M | 29% | High risk71 | Flagged0.017 |
| 25E00006ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS- MINDORO WEST COASTAL ROAD, K0362+000-K0381+050 (INTERMITTENT SECTIONS), ABRA DE ILOG, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱233.2M | 30% | High risk73 | Flagged0.013 |
| 25E00209BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF FLOOD CONTROL STRUCTURE ALONG ABRA DE ILOG RIVER, SITIO KULI-KULI SECTION (RS), ARMADO, STA. 000+234-STA. 000+900, ABRA DE IL | Region IV-B | Region IV-B | On-Going | ₱284.3M | 30% | High risk68 | Flagged0.012 |
| 25E00278SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. QUINABIGAN, STA. 000+000-STA. 000+338.50, PINAMALAYAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.2M | 30% | High risk73 | Flagged0.012 |
| 25E00029CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE WITH ESPLANADE ALONG POLA RIVER, BRGY. LUMANGBAYAN SECTION (UPSTREAM/LS), STA. CRUZ, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.1M | 60% | High risk68 | Flagged0.001 |
| 25E00028CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE WITH ESPLANADE ALONG POLA RIVER, BRGY. LUMANGBAYAN SECTION (DOWNSTREAM/LS), STA. CRUZ, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231M | 60% | High risk68 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25E00018CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, BUSUANGA RIVER, BRGY. SAN AGUSTIN (UPSTREAM), SAN JOSE, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276.6M | 61% | High risk78 | Flagged0.030 |
| 2 | 25E00019CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, BUSUANGA RIVER, BRGY. SAN AGUSTIN (DOWNSTREAM), SAN JOSE, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276.4M | 59% | High risk78 | Flagged0.030 |
| 3 | 25E00020CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, BUSUANGA RIVER, BRGY. ADELA (DOWNSTREAM), RIZAL, OCC.MINDORO | Region IV-B | Region IV-B | On-Going | ₱275.8M | 60% | High risk78 | Flagged0.030 |
| 4 | 25E00006ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS- MINDORO WEST COASTAL ROAD, K0362+000-K0381+050 (INTERMITTENT SECTIONS), ABRA DE ILOG, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱233.2M | 30% | High risk73 | Flagged0.013 |
| 5 | 25E00274SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. DEL RAZON-BRGY. BULAKLAKAN, STA. 000+390-STA. 000+540; STA. 000+640-STA. 000+846. | Region IV-B | Region IV-B | On-Going | ₱231.4M | 0% | High risk73 | Flagged0.020 |
| 6 | 25E00275SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. DEL RAZON, STA. 000+000-STA. 000+371.35, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.3M | 0% | High risk73 | Flagged0.020 |
| 7 | 25E00273SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNTIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. BULAKLAKAN, STA. 000+860-STA. 001+237.91, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.1M | 0% | High risk73 | Flagged0.020 |
| 8 | 25E00278SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. QUINABIGAN, STA. 000+000-STA. 000+338.50, PINAMALAYAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.2M | 30% | High risk73 | Flagged0.012 |
| 9 | 25E00007ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS, MINDORO WEST COASTAL ROAD, ABRA DE ILOG, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.2M | 29% | High risk71 | Flagged0.017 |
| 10 | 25E00029CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE WITH ESPLANADE ALONG POLA RIVER, BRGY. LUMANGBAYAN SECTION (UPSTREAM/LS), STA. CRUZ, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.1M | 60% | High risk68 | Flagged0.001 |
| 11 | 25E00028CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE WITH ESPLANADE ALONG POLA RIVER, BRGY. LUMANGBAYAN SECTION (DOWNSTREAM/LS), STA. CRUZ, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231M | 60% | High risk68 | Flagged0.001 |
| 12 | 24E00149SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. AGUAS (DOWNSTREAM), SAN JOSE, OCC. M | Region IV-B | Region IV-B | On-Going | ₱193M | 86% | High risk68 | —-0.003 |
| 13 | 25E00209BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF FLOOD CONTROL STRUCTURE ALONG ABRA DE ILOG RIVER, SITIO KULI-KULI SECTION (RS), ARMADO, STA. 000+234-STA. 000+900, ABRA DE IL | Region IV-B | Region IV-B | On-Going | ₱284.3M | 30% | High risk68 | Flagged0.012 |
| 14 | 25DI0022CONSTRUCTION OF RIVER PROTECTION STRUCTURE NEAR SOUTHPEAK BRIDGE, SAN PEDRO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱93.9M | 44% | High risk68 | —-0.030 |
| 15 | 25E00026CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. MAGSIKAP (UPSTREAM), RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱221.9M | 64% | High risk68 | —-0.003 |
| 16 | 24E00032FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF PALUAN SHORE PROTECTION AND CAUSEWAY DEVELOPMENT, SITIO MALUGAO SECTION, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk67 | —-0.036 |
| 17 | 23E00018CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS & PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE AT LUMINTAO RIVER, SITIO LUMINTAO, BRGY. MALAWAAN, RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱193.7M | 100% | High risk67 | —-0.041 |
| 18 | 24E00117FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF PALUAN SHORE PROTECTION AND CAUSEWAY DEVELOPMENT, SITIO IPOL SECTION, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | Completed | ₱289.5M | 100% | High risk66 | —-0.031 |
| 19 | 24DI0017CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE NEAR BAYANBAYANAN BRIDGE (DOWNSTREAM), SAN PEDRO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱93.8M | 99% | High risk65 | —-0.040 |
| 20 | 24DI0043REHABILITATION OF REVETMENT ALONG TUNASAN RIVER (STAGGERED), CITY OF SAN PEDRO, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱96.4M | 94% | High risk64 | —-0.033 |
| 21 | 24DI0026REHABILITATION OF REVETMENT ALONG SAN ISIDRO RIVER (STAGGERED), CITY OF SAN PEDRO, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱96.5M | 94% | High risk64 | —-0.034 |
| 22 | 24DI0025REHABILITATION OF REVETMENT ALONG SAN ISIDRO RIVER, BARANGAY MAGSAYSAY, CITY OF SAN PEDRO, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.076 |
| 23 | 23OE0037INSTALLATION OF BOOSTER PUMP AT ESTERO DELA REINA, PHASE VII, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.2M | 100% | High risk64 | —-0.075 |
| 24 | 24E00143ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS- MINDORO WEST COASTAL ROAD, K0346+000 - K0444+713 (INTERMITTENT SECTIONS), OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱176.3M | 90% | High risk64 | —-0.034 |
| 25 | 24E00142ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS- MINDORO WEST COASTAL ROAD, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱155.2M | 90% | High risk63 | —-0.037 |