Contractor dossier
273 projects on file, including joint ventures this contractor is part of.
Total projects
273
Total budget
₱18.2B
Average progress
92.7%
Completion rate
72.9%
Average risk score
53.2
Medium risk on average, out of 100
Flagged as unusual
44
16.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 172 | ₱12.4B | 57.1 | 37 | 90.7% |
| Region III | 85 | ₱4.1B | 44.7 | 4 | 96.4% |
| Region IV-B | 9 | ₱415.3M | 43.2 | 0 | 100.0% |
| Region I | 7 | ₱1.2B | 72.7 | 3 | 86.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 91 | ₱7.6B | 53.8 | 8 | 97.7% |
| Roads | 77 | ₱2.7B | 40.8 | 1 | 94.7% |
| Bridges | 36 | ₱3.1B | 52.3 | 7 | 89.4% |
| Buildings and Facilities | 33 | ₱919.3M | 39.7 | 6 | 87.2% |
| GAA 2025 OO-2 | 23 | ₱2.6B | 92.4 | 12 | 90.4% |
| GAA 2025 SSP | 6 | ₱462.7M | 95.5 | 6 | 51.4% |
| OTHER | 4 | ₱460.9M | 77.9 | 3 | 85.9% |
| GAA 2025 OO-1 | 3 | ₱357.7M | 90.0 | 1 | 99.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BE0113CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG CAGAYAN | Region II | Isabela 1st DEO | On-Going | ₱140.2M | 26% | High risk97 | Flagged0.048 |
| 25BE0089CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG CAGAYAN | Region II | Isabela 1st DEO | On-Going | ₱140.3M | 29% | High risk96 | Flagged0.046 |
| 25CN0157CONSTRUCTION OF MULTI-PURPOSE BUILDING , BARANGAY ZABALI, BALER, AURORA | Region III | Aurora DEO | On-Going | ₱96M | 14% | High risk96 | Flagged0.032 |
| 25BI0004CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF CONCRETE | Region II | Nueva Vizcaya DEO | On-Going | ₱38.8M | 99% | High risk95 | Flagged0.005 |
| 25CN0162CONSTRUCTION OF DAMAGED PAVED ROADS, DINGALAN, AURORA | Region III | Aurora DEO | On-Going | ₱18.2M | 56% | High risk95 | Flagged0.012 |
| 25BI0012CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES CONSTRUCTION OF CONCRETE ROAD, | Region II | Nueva Vizcaya DEO | On-Going | ₱29.1M | 84% | High risk95 | Flagged0.010 |
| 25BG0155ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF STA. CRUZ FLOOD CONTROL STRUCTURE, ALICIA, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱93.6M | 66% | High risk94 | Flagged0.004 |
| 25BG0154ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- REHABILITATION OF SAN ANTONIO FLOOD CONTROL STRUCTURE, ALICIA, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱93.5M | 75% | High risk94 | Flagged0.001 |
| 25BG0124OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE-BRGY MINANGA (PA | Region II | Isabela 3rd DEO | On-Going | ₱93.6M | 88% | High risk94 | —-0.002 |
| 25A00280CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LAOAG-SAN NICOLAS BYPASS ROAD (SAN NICOLAS SECTION), PACKAGE A, ILOCOS NORTE | Region I | Region I | On-Going | ₱187.3M | 99% | High risk94 | Flagged0.024 |
| 25BE0062ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PHASE 4, | Region II | Isabela 1st DEO | On-Going | ₱138.8M | 77% | High risk94 | Flagged0.012 |
| 25BE0063ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PHASE 4 | Region II | Isabela 1st DEO | On-Going | ₱138.8M | 76% | High risk94 | Flagged0.012 |
| 25BI0026ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGADANA | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 98% | High risk94 | —-0.004 |
| 25BI0042ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONT | Region II | Nueva Vizcaya DEO | On-Going | ₱143.3M | 100% | High risk94 | Flagged0.001 |
| 25BI0027ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGADANA | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 99% | High risk94 | —-0.005 |
| 25BI0032ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE ALONG MAGAT RIVER BAR | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 97% | High risk93 | —-0.003 |
| 25BI0029ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGADANA | Region II | Nueva Vizcaya DEO | On-Going | ₱143.3M | 95% | High risk93 | Flagged0.004 |
| 25BI0037ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONT | Region II | Nueva Vizcaya DEO | On-Going | ₱143.3M | 97% | High risk93 | Flagged0.003 |
| 25BJ0024OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA FE RIVER, | Region II | Nueva Vizcaya 2nd DEO | On-Going | ₱140.5M | 94% | High risk93 | Flagged0.004 |
| 25BJ0013OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA FE RIVER, | Region II | Nueva Vizcaya 2nd DEO | On-Going | ₱140.4M | 96% | High risk93 | Flagged0.004 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BE0113CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG CAGAYAN | Region II | Isabela 1st DEO | On-Going | ₱140.2M | 26% | High risk97 | Flagged0.048 |
| 25BE0089CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG CAGAYAN | Region II | Isabela 1st DEO | On-Going | ₱140.3M | 29% | High risk96 | Flagged0.046 |
| 24B00111OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - NUEVA VIZCAYA-PANGASINAN RD, K0219+920 - K0220+210 | Region II | Region II | On-Going | ₱192.8M | 72% | High risk79 | Flagged0.032 |
| 25CN0157CONSTRUCTION OF MULTI-PURPOSE BUILDING , BARANGAY ZABALI, BALER, AURORA | Region III | Aurora DEO | On-Going | ₱96M | 14% | High risk96 | Flagged0.032 |
| 24A00340CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LAOAG-SAN NICOLAS BY-PASS ROAD (SAN NICOLAS SECTION), ILOCOS NORTE (PACKAGE B) | Region I | Region I | On-Going | ₱193M | 100% | High risk71 | Flagged0.025 |
| 25A00280CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LAOAG-SAN NICOLAS BYPASS ROAD (SAN NICOLAS SECTION), PACKAGE A, ILOCOS NORTE | Region I | Region I | On-Going | ₱187.3M | 99% | High risk94 | Flagged0.024 |
| 25B00066CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY - K0247 + 000 - K0248 + 000, K0262 + 000 - K0262 + 874, K0281 + 101 - K0282 | Region II | Region II | On-Going | ₱186.5M | 0% | High risk71 | Flagged0.023 |
| 25A00110REPLACEMENT OF PERMANENT WEAK BRIDGES - CAUPLASAN BR. (B02395LZ) ALONG ILOCOS NORTE-APAYAO RD (PHASE III) | Region I | Region I | On-Going | ₱140.4M | 18% | High risk67 | Flagged0.023 |
| 24B00153DEPARTMENT OF HEALTH - FY 2024 HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP): RURAL HEALTH UNITS (RURAL HEALTH UNIT) - COMPLETION/ UPGRADING/ REPAIR AND EQUIPPING OF RURAL HEALTH UNIT - STA. FE RURAL HEALTH UNIT | Region II | Region II | On-Going | ₱5.7M | 0% | Medium risk43 | Flagged0.019 |
| 24B00147DEPARTMENT OF HEALTH - FY 2024 HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP): RURAL HEALTH UNITS (RURAL HEALTH UNIT) - COMPLETION/ EQUIPPING OF SUPER HEALTH CENTERS - QUEZON SUPER HEALTH CENTER | Region II | Region II | On-Going | ₱6M | 1% | Medium risk43 | Flagged0.019 |
| 25BH0244OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - GARIT BR. (B04867LZ) ALONG JCT. IPIL - QUIRINO BRDY. RD. (PHASE II) | Region II | Isabela 4th DEO | On-Going | ₱51.5M | 12% | High risk64 | Flagged0.019 |
| 25BH0035SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF GUCAB BRIDGE, PHASE III, BARANGAY GUCAB, ECHAGUE, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱95.5M | 34% | High risk70 | Flagged0.018 |
| 19B00043OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES: SAN PEDRO BRIDGE (B04450LZ) ALONG NRJ VILLA SUR-SAN PEDRO-CABUA-AN-YSMAEL-DISIMUNGAL ROAD, MADDELA, QUIRINO | Region II | Region II | Completed | ₱538.7M | 100% | High risk63 | Flagged0.014 |
| 25BE0062ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PHASE 4, | Region II | Isabela 1st DEO | On-Going | ₱138.8M | 77% | High risk94 | Flagged0.012 |
| 25BE0063ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PHASE 4 | Region II | Isabela 1st DEO | On-Going | ₱138.8M | 76% | High risk94 | Flagged0.012 |
| 25CN0162CONSTRUCTION OF DAMAGED PAVED ROADS, DINGALAN, AURORA | Region III | Aurora DEO | On-Going | ₱18.2M | 56% | High risk95 | Flagged0.012 |
| 24B00150DOH - FY 2024 HEALTH CARE FACILITIES ENHANCEMENT PROGRAM (HFEP): LGU HOSPITALS - LGU HOSPITALS - KASIBU MUNICIPAL HOSPITAL | Region II | Region II | On-Going | ₱24.1M | 31% | Medium risk44 | Flagged0.011 |
| 25BI0012CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES CONSTRUCTION OF CONCRETE ROAD, | Region II | Nueva Vizcaya DEO | On-Going | ₱29.1M | 84% | High risk95 | Flagged0.010 |
| 25CN0181CONSTRUCTION OF VIRGIN COCONUT OIL (PREMIUM BUILDING), DINGALAN, AURORA | Region III | Aurora DEO | On-Going | ₱17.6M | 25% | Medium risk32 | Flagged0.010 |
| 24BI0033ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - COLOCOL BR. 2 (B01245LZ) ALONG DAANG MAHARLIKA BY-PASS RD.BAYOMBONG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | On-Going | ₱14.7M | 90% | High risk74 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 24BH0158SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF CALAO EAST FLOOD CONTROL STRUCTURE, SECTION 1,SANTIAGO CITY, ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.056 |
| 102 | 24BH0156SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF MABINI FLOOD CONTROL STRUCTURE, SECTION 1, SANTIAGO CITY, ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.056 |
| 103 | 24BH0236SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SINILI FLOOD CONTROL STRUCTURE, SECTION 1, SANTIAGO CITY, ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.054 |
| 104 | 24BH0157SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC INFRASTRUCTURES/ FACILITIES- CONSTRUCTION OF DIVISORIA FLOOD CONTROL STRUCTURE, SECTION 1, SANTIAGO CITY, ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.055 |
| 105 | 24BH0238SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF NAGASICAN FLOOD CONTROL STRUCTURE SECTION 1, SANTIAGO CITY, ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.057 |
| 106 | 24BI0056ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG | Region II | Nueva Vizcaya DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.054 |
| 107 | 24BI0055ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG MAGAT RIVER, | Region II | Nueva Vizcaya DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.055 |
| 108 | 24B00048OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - ROAD WIDENING- PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0271 + 940 - K0272 + 376.30, K0273 + 408.70 - K0275 + 158.10 | Region II | Region II | On-Going | ₱149.8M | 93% | Medium risk59 | —-0.032 |
| 109 | 25C00004CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF CASALOGAN FLOOD CONTROL STRUCTURE, CASIGURAN, AURORA | Region III | Region III | On-Going | ₱141.9M | 69% | Medium risk57 | —-0.024 |
| 110 | 24BH0306ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - JCT. IPIL - QUIRINO BRDY. RD. - K0352 + 501 - K0352 | Region II | Isabela 4th DEO | On-Going | ₱96.4M | 88% | Medium risk56 | —-0.041 |
| 111 | 25BI0052ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS PAPAYA-MALABING-WANGAL BINUGAWAN-TADJI -RUNRUNO RD, K0313 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 52% | Medium risk56 | —-0.036 |
| 112 | 23C00009FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF CASALOGAN RIVER CONTROL, CASIGURAN, AURORA | Region III | Region III | Completed | ₱289.5M | 100% | Medium risk56 | —-0.051 |
| 113 | 24CN0018CONSTRUCTION OF CALABUANAN - BUHANGIN FLOOD CONTROL, BALER, AURORA | Region III | Aurora DEO | Completed | ₱144.8M | 100% | Medium risk56 | —-0.065 |
| 114 | 25BI0065ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTIARY ROADS BAGABAG DIV. RD K0284+(-565) K0285+000 | Region II | Nueva Vizcaya DEO | Completed | ₱95.5M | 100% | Medium risk56 | —-0.070 |
| 115 | 25BI0053ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS PAPAYA-MALABING- WANGAL BINUGAWAN-TADJI-RUNRUNO RD, K03 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 52% | Medium risk56 | —-0.036 |
| 116 | 24B00025OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - ARITAO - QUIRINO ROAD, NUEVA VIZCAYA | Region II | Region II | Completed | ₱122.6M | 100% | Medium risk56 | —-0.065 |
| 117 | 21CN0117CONSTRUCTION OF KADAYAKAN BRIDGE, MARIA AURORA, AURORA | Region III | Aurora DEO | Completed | ₱173.7M | 100% | Medium risk54 | —-0.034 |
| 118 | 24BI0146CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES (FCDS) ALONG MAGAT RIVER, BUSILAC SECTION 7, BAYOMBONG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱67.6M | 100% | Medium risk54 | —-0.012 |
| 119 | 22BH0134SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROAD AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF STA. ISABEL - MINURI BRIDGE, JONES, ISABELA | Region II | Isabela 4th DEO | Completed | ₱77.2M | 100% | Medium risk53 | —-0.032 |
| 120 | 24BI0057CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE | Region II | Nueva Vizcaya DEO | Completed | ₱91.7M | 100% | Medium risk53 | —-0.056 |
| 121 | 24BI0058CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE | Region II | Nueva Vizcaya DEO | Completed | ₱89.7M | 100% | Medium risk53 | —-0.057 |
| 122 | 24BI0060CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUC | Region II | Nueva Vizcaya DEO | Completed | ₱89.7M | 100% | Medium risk53 | —-0.058 |
| 123 | 24BI0051CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCT | Region II | Nueva Vizcaya DEO | Completed | ₱91.7M | 100% | Medium risk53 | —-0.055 |
| 124 | 23BI0106ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU SOLANO RD | Region II | Nueva Vizcaya DEO | Completed | ₱67.6M | 100% | Medium risk53 | —-0.021 |
| 125 | 19BK0046BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES - NALUNGTUTAN BR. (B04452LZ) ALONG JCT. ABBAG-GUINGIN BDRY RD, K0384+309, NAGTIPUNAN, QUIRINO | Region II | Quirino DEO | Completed | ₱88.8M | 100% | Medium risk52 | —-0.038 |