Contractor dossier
273 projects on file, including joint ventures this contractor is part of.
Total projects
273
Total budget
₱18.2B
Average progress
92.7%
Completion rate
72.9%
Average risk score
53.2
Medium risk on average, out of 100
Flagged as unusual
44
16.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 172 | ₱12.4B | 57.1 | 37 | 90.7% |
| Region III | 85 | ₱4.1B | 44.7 | 4 | 96.4% |
| Region IV-B | 9 | ₱415.3M | 43.2 | 0 | 100.0% |
| Region I | 7 | ₱1.2B | 72.7 | 3 | 86.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 91 | ₱7.6B | 53.8 | 8 | 97.7% |
| Roads | 77 | ₱2.7B | 40.8 | 1 | 94.7% |
| Bridges | 36 | ₱3.1B | 52.3 | 7 | 89.4% |
| Buildings and Facilities | 33 | ₱919.3M | 39.7 | 6 | 87.2% |
| GAA 2025 OO-2 | 23 | ₱2.6B | 92.4 | 12 | 90.4% |
| GAA 2025 SSP | 6 | ₱462.7M | 95.5 | 6 | 51.4% |
| OTHER | 4 | ₱460.9M | 77.9 | 3 | 85.9% |
| GAA 2025 OO-1 | 3 | ₱357.7M | 90.0 | 1 | 99.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BE0113CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG CAGAYAN | Region II | Isabela 1st DEO | On-Going | ₱140.2M | 26% | High risk97 | Flagged0.048 |
| 25BE0089CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG CAGAYAN | Region II | Isabela 1st DEO | On-Going | ₱140.3M | 29% | High risk96 | Flagged0.046 |
| 25CN0157CONSTRUCTION OF MULTI-PURPOSE BUILDING , BARANGAY ZABALI, BALER, AURORA | Region III | Aurora DEO | On-Going | ₱96M | 14% | High risk96 | Flagged0.032 |
| 25BI0004CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF CONCRETE | Region II | Nueva Vizcaya DEO | On-Going | ₱38.8M | 99% | High risk95 | Flagged0.005 |
| 25CN0162CONSTRUCTION OF DAMAGED PAVED ROADS, DINGALAN, AURORA | Region III | Aurora DEO | On-Going | ₱18.2M | 56% | High risk95 | Flagged0.012 |
| 25BI0012CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES CONSTRUCTION OF CONCRETE ROAD, | Region II | Nueva Vizcaya DEO | On-Going | ₱29.1M | 84% | High risk95 | Flagged0.010 |
| 25BG0155ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF STA. CRUZ FLOOD CONTROL STRUCTURE, ALICIA, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱93.6M | 66% | High risk94 | Flagged0.004 |
| 25BG0154ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- REHABILITATION OF SAN ANTONIO FLOOD CONTROL STRUCTURE, ALICIA, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱93.5M | 75% | High risk94 | Flagged0.001 |
| 25BG0124OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE-BRGY MINANGA (PA | Region II | Isabela 3rd DEO | On-Going | ₱93.6M | 88% | High risk94 | —-0.002 |
| 25A00280CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LAOAG-SAN NICOLAS BYPASS ROAD (SAN NICOLAS SECTION), PACKAGE A, ILOCOS NORTE | Region I | Region I | On-Going | ₱187.3M | 99% | High risk94 | Flagged0.024 |
| 25BE0062ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PHASE 4, | Region II | Isabela 1st DEO | On-Going | ₱138.8M | 77% | High risk94 | Flagged0.012 |
| 25BE0063ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PHASE 4 | Region II | Isabela 1st DEO | On-Going | ₱138.8M | 76% | High risk94 | Flagged0.012 |
| 25BI0026ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGADANA | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 98% | High risk94 | —-0.004 |
| 25BI0042ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONT | Region II | Nueva Vizcaya DEO | On-Going | ₱143.3M | 100% | High risk94 | Flagged0.001 |
| 25BI0027ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGADANA | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 99% | High risk94 | —-0.005 |
| 25BI0032ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE ALONG MAGAT RIVER BAR | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 97% | High risk93 | —-0.003 |
| 25BI0029ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGADANA | Region II | Nueva Vizcaya DEO | On-Going | ₱143.3M | 95% | High risk93 | Flagged0.004 |
| 25BI0037ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONT | Region II | Nueva Vizcaya DEO | On-Going | ₱143.3M | 97% | High risk93 | Flagged0.003 |
| 25BJ0024OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA FE RIVER, | Region II | Nueva Vizcaya 2nd DEO | On-Going | ₱140.5M | 94% | High risk93 | Flagged0.004 |
| 25BJ0013OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA FE RIVER, | Region II | Nueva Vizcaya 2nd DEO | On-Going | ₱140.4M | 96% | High risk93 | Flagged0.004 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BE0113CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG CAGAYAN | Region II | Isabela 1st DEO | On-Going | ₱140.2M | 26% | High risk97 | Flagged0.048 |
| 25BE0089CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG CAGAYAN | Region II | Isabela 1st DEO | On-Going | ₱140.3M | 29% | High risk96 | Flagged0.046 |
| 24B00111OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - NUEVA VIZCAYA-PANGASINAN RD, K0219+920 - K0220+210 | Region II | Region II | On-Going | ₱192.8M | 72% | High risk79 | Flagged0.032 |
| 25CN0157CONSTRUCTION OF MULTI-PURPOSE BUILDING , BARANGAY ZABALI, BALER, AURORA | Region III | Aurora DEO | On-Going | ₱96M | 14% | High risk96 | Flagged0.032 |
| 24A00340CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LAOAG-SAN NICOLAS BY-PASS ROAD (SAN NICOLAS SECTION), ILOCOS NORTE (PACKAGE B) | Region I | Region I | On-Going | ₱193M | 100% | High risk71 | Flagged0.025 |
| 25A00280CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LAOAG-SAN NICOLAS BYPASS ROAD (SAN NICOLAS SECTION), PACKAGE A, ILOCOS NORTE | Region I | Region I | On-Going | ₱187.3M | 99% | High risk94 | Flagged0.024 |
| 25B00066CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY - K0247 + 000 - K0248 + 000, K0262 + 000 - K0262 + 874, K0281 + 101 - K0282 | Region II | Region II | On-Going | ₱186.5M | 0% | High risk71 | Flagged0.023 |
| 25A00110REPLACEMENT OF PERMANENT WEAK BRIDGES - CAUPLASAN BR. (B02395LZ) ALONG ILOCOS NORTE-APAYAO RD (PHASE III) | Region I | Region I | On-Going | ₱140.4M | 18% | High risk67 | Flagged0.023 |
| 24B00153DEPARTMENT OF HEALTH - FY 2024 HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP): RURAL HEALTH UNITS (RURAL HEALTH UNIT) - COMPLETION/ UPGRADING/ REPAIR AND EQUIPPING OF RURAL HEALTH UNIT - STA. FE RURAL HEALTH UNIT | Region II | Region II | On-Going | ₱5.7M | 0% | Medium risk43 | Flagged0.019 |
| 24B00147DEPARTMENT OF HEALTH - FY 2024 HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP): RURAL HEALTH UNITS (RURAL HEALTH UNIT) - COMPLETION/ EQUIPPING OF SUPER HEALTH CENTERS - QUEZON SUPER HEALTH CENTER | Region II | Region II | On-Going | ₱6M | 1% | Medium risk43 | Flagged0.019 |
| 25BH0244OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - GARIT BR. (B04867LZ) ALONG JCT. IPIL - QUIRINO BRDY. RD. (PHASE II) | Region II | Isabela 4th DEO | On-Going | ₱51.5M | 12% | High risk64 | Flagged0.019 |
| 25BH0035SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF GUCAB BRIDGE, PHASE III, BARANGAY GUCAB, ECHAGUE, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱95.5M | 34% | High risk70 | Flagged0.018 |
| 19B00043OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES: SAN PEDRO BRIDGE (B04450LZ) ALONG NRJ VILLA SUR-SAN PEDRO-CABUA-AN-YSMAEL-DISIMUNGAL ROAD, MADDELA, QUIRINO | Region II | Region II | Completed | ₱538.7M | 100% | High risk63 | Flagged0.014 |
| 25BE0062ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PHASE 4, | Region II | Isabela 1st DEO | On-Going | ₱138.8M | 77% | High risk94 | Flagged0.012 |
| 25BE0063ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PHASE 4 | Region II | Isabela 1st DEO | On-Going | ₱138.8M | 76% | High risk94 | Flagged0.012 |
| 25CN0162CONSTRUCTION OF DAMAGED PAVED ROADS, DINGALAN, AURORA | Region III | Aurora DEO | On-Going | ₱18.2M | 56% | High risk95 | Flagged0.012 |
| 24B00150DOH - FY 2024 HEALTH CARE FACILITIES ENHANCEMENT PROGRAM (HFEP): LGU HOSPITALS - LGU HOSPITALS - KASIBU MUNICIPAL HOSPITAL | Region II | Region II | On-Going | ₱24.1M | 31% | Medium risk44 | Flagged0.011 |
| 25BI0012CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES CONSTRUCTION OF CONCRETE ROAD, | Region II | Nueva Vizcaya DEO | On-Going | ₱29.1M | 84% | High risk95 | Flagged0.010 |
| 25CN0181CONSTRUCTION OF VIRGIN COCONUT OIL (PREMIUM BUILDING), DINGALAN, AURORA | Region III | Aurora DEO | On-Going | ₱17.6M | 25% | Medium risk32 | Flagged0.010 |
| 24BI0033ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - COLOCOL BR. 2 (B01245LZ) ALONG DAANG MAHARLIKA BY-PASS RD.BAYOMBONG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | On-Going | ₱14.7M | 90% | High risk74 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 24BI0049CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCT | Region II | Nueva Vizcaya DEO | Completed | ₱89.7M | 100% | Medium risk52 | —-0.054 |
| 127 | 24BI0050CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCT | Region II | Nueva Vizcaya DEO | Completed | ₱89.7M | 100% | Medium risk52 | —-0.057 |
| 128 | 24BH0229BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING SAN FABIAN, ECHAGUE, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱39.6M | 98% | Medium risk51 | —-0.044 |
| 129 | 24B00051CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS ALONG DAANG MAHARLIKA (LZ) - K0266 + (-008.20) - K0266 + 570, K0266 + 595 - | Region II | Region II | Completed | ₱67.6M | 100% | Medium risk51 | —-0.075 |
| 130 | 25BI0010ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE PROGRAM REPLACEMENT OF PERMANENT WEAK BRIDGES RUNRUNO BR. 2 (BO2803LZ) ALONG BAMBANG-KASIBU-SOLANO ROAD | Region II | Nueva Vizcaya DEO | On-Going | ₱54.5M | 56% | Medium risk51 | —-0.010 |
| 131 | 21CN0099CONSTRUCTION OF CONVENTION CENTER IN CAPITOL HILLS (TUROD), BARANGAY DAVIL-DAVILAN, DINGALAN, AURORA | Region III | Aurora DEO | Completed | ₱96.5M | 100% | Medium risk51 | —-0.082 |
| 132 | 24BH0224SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDING /FACILITIES - CONSTRUCTION OF USOL FLOOD CONTROL STRUCTURE, SECTION 1, JONES, ISABELA | Region II | Isabela 4th DEO | Completed | ₱72.4M | 100% | Medium risk51 | —-0.062 |
| 133 | 25B00018OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS: ARITAO-QUIRINO ROAD, NUEVA VIZCAYA (PHASE II) | Region II | Region II | On-Going | ₱76M | 74% | Medium risk51 | —-0.044 |
| 134 | 23CN0093CONSTRUCTION OF IBONA BRIDGE, DINGALAN, AURORA | Region III | Aurora DEO | Completed | ₱135.1M | 100% | Medium risk50 | —-0.044 |
| 135 | 23BI0026BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE (FCDS) ALONG STA. FE RIVER, ALMAGUER NORTH SECTION, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱59.4M | 100% | Medium risk50 | —-0.068 |
| 136 | 23BI0107ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF STO. D | Region II | Nueva Vizcaya DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.012 |
| 137 | 24BI0123CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE (FCDS) ALONG MAGAT RIVER, SITIO TABBAN SECTION 8, POGONSINO. BAGABAG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱48.3M | 100% | Medium risk50 | —-0.016 |
| 138 | 22CN0186CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE FACILITY (CONVENTION CENTER), BALER, AURORA | Region III | Aurora DEO | Completed | ₱99M | 100% | Medium risk50 | —-0.075 |
| 139 | 19CN0106CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVENTION CENTER), BALER, AURORA | Region III | Aurora DEO | Completed | ₱99M | 100% | Medium risk50 | —-0.078 |
| 140 | 22CN0127CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. PINGIT, BALER, AURORA | Region III | Aurora DEO | Completed | ₱96.5M | 100% | Medium risk49 | —-0.079 |
| 141 | 21BH0110CONTRUCTION/REHABILITATION/IMPROVEMENT OF MULTI-PURPOSE BUILDING, BARANGAY MABANTAD | Region II | Isabela 4th DEO | Completed | ₱4.8M | 100% | Medium risk48 | —-0.085 |
| 142 | 21BH0151CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY IPIL | Region II | Isabela 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.087 |
| 143 | 23BI0080REHABILITATION/RECONSTRUCTION OF NATIONAL ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE TERTIARY ROAD, BAMBANG-KASIBU-SOLANO ROAD, K0255+537 K0255+699, MABUSLO, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱48.2M | 100% | Medium risk47 | —-0.082 |
| 144 | 21BH0039CONSTRUCTION/REHABILITATION/IMPROVEMENT OF MULTI-PURPOSE BUILDING, BARANGAY SAN SALVADOR | Region II | Isabela 4th DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.086 |
| 145 | 23CN0013ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, NUEVA ECIJA - AURORA RD - K0175+884 - K0176+143.40, K0202+000 - K0202+096, K0202+300 - K0202+493.80, K0202+775.50 - K0202+796,.......... | Region III | Aurora DEO | Completed | ₱96.5M | 100% | Medium risk47 | —-0.088 |
| 146 | 23BH0231ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CABARUAN DRAINAGE SYSTEM PROJECT, CABARUAN, CAUAYAN CIT | Region II | Isabela 4th DEO | Completed | ₱48.9M | 100% | Medium risk47 | —-0.063 |
| 147 | 23BH0233ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TURAYONG DRAINAGE SYSTEM PROJECT, CAUAYAN CITY, ISABE | Region II | Isabela 4th DEO | Completed | ₱48.9M | 100% | Medium risk47 | —-0.066 |
| 148 | 24BI0042ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD K0320+029- K0321+250 | Region II | Nueva Vizcaya DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.082 |
| 149 | 23BI0062ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONSTRUCTION OF BUENAVISTA-BUSILAC FLOOD CONTROL ALONG MAGAT RIVER, BAYOMBONG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.064 |
| 150 | 24BI0039ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM CONSTRUCTION OF MANAMTAM FLOOD CONTROL ALONG MATUNO RIVER (SECTION 2) | Region II | Nueva Vizcaya DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.065 |