Opening the dossier…
Opening the dossier…
Contractor dossier
273 projects on file, including joint ventures this contractor is part of.
Total projects
273
Total budget
₱18.2B
Average progress
92.7%
Completion rate
72.9%
Average risk score
53.2
Medium risk on average, out of 100
Flagged as unusual
44
16.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 172 | ₱12.4B | 57.1 | 37 | 90.7% |
| Region III | 85 | ₱4.1B | 44.7 | 4 | 96.4% |
| Region IV-B | 9 | ₱415.3M | 43.2 | 0 | 100.0% |
| Region I | 7 | ₱1.2B | 72.7 | 3 | 86.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 91 | ₱7.6B | 53.8 | 8 | 97.7% |
| Roads | 77 | ₱2.7B | 40.8 | 1 | 94.7% |
| Bridges | 36 | ₱3.1B | 52.3 | 7 | 89.4% |
| Buildings and Facilities | 33 | ₱919.3M | 39.7 | 6 | 87.2% |
| GAA 2025 OO-2 | 23 | ₱2.6B | 92.4 | 12 | 90.4% |
| GAA 2025 SSP | 6 | ₱462.7M | 95.5 | 6 | 51.4% |
| OTHER | 4 | ₱460.9M | 77.9 | 3 | 85.9% |
| GAA 2025 OO-1 | 3 | ₱357.7M | 90.0 | 1 | 99.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BE0113CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG CAGAYAN | Region II | Isabela 1st DEO | On-Going | ₱140.2M | 26% | High risk97 | Flagged0.048 |
| 25BE0089CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG CAGAYAN | Region II | Isabela 1st DEO | On-Going | ₱140.3M | 29% | High risk96 | Flagged0.046 |
| 25CN0157CONSTRUCTION OF MULTI-PURPOSE BUILDING , BARANGAY ZABALI, BALER, AURORA | Region III | Aurora DEO | On-Going | ₱96M | 14% | High risk96 | Flagged0.032 |
| 25BI0004CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF CONCRETE | Region II | Nueva Vizcaya DEO | On-Going | ₱38.8M | 99% | High risk95 | Flagged0.005 |
| 25CN0162CONSTRUCTION OF DAMAGED PAVED ROADS, DINGALAN, AURORA | Region III | Aurora DEO | On-Going | ₱18.2M | 56% | High risk95 | Flagged0.012 |
| 25BI0012CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES CONSTRUCTION OF CONCRETE ROAD, | Region II | Nueva Vizcaya DEO | On-Going | ₱29.1M | 84% | High risk95 | Flagged0.010 |
| 25BG0155ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF STA. CRUZ FLOOD CONTROL STRUCTURE, ALICIA, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱93.6M | 66% | High risk94 | Flagged0.004 |
| 25BG0154ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- REHABILITATION OF SAN ANTONIO FLOOD CONTROL STRUCTURE, ALICIA, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱93.5M | 75% | High risk94 | Flagged0.001 |
| 25BG0124OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE-BRGY MINANGA (PA | Region II | Isabela 3rd DEO | On-Going | ₱93.6M | 88% | High risk94 | —-0.002 |
| 25A00280CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LAOAG-SAN NICOLAS BYPASS ROAD (SAN NICOLAS SECTION), PACKAGE A, ILOCOS NORTE | Region I | Region I | On-Going | ₱187.3M | 99% | High risk94 | Flagged0.024 |
| 25BE0062ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PHASE 4, | Region II | Isabela 1st DEO | On-Going | ₱138.8M | 77% | High risk94 | Flagged0.012 |
| 25BE0063ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PHASE 4 | Region II | Isabela 1st DEO | On-Going | ₱138.8M | 76% | High risk94 | Flagged0.012 |
| 25BI0026ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGADANA | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 98% | High risk94 | —-0.004 |
| 25BI0042ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONT | Region II | Nueva Vizcaya DEO | On-Going | ₱143.3M | 100% | High risk94 | Flagged0.001 |
| 25BI0027ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGADANA | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 99% | High risk94 | —-0.005 |
| 25BI0032ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE ALONG MAGAT RIVER BAR | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 97% | High risk93 | —-0.003 |
| 25BI0029ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGADANA | Region II | Nueva Vizcaya DEO | On-Going | ₱143.3M | 95% | High risk93 | Flagged0.004 |
| 25BI0037ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONT | Region II | Nueva Vizcaya DEO | On-Going | ₱143.3M | 97% | High risk93 | Flagged0.003 |
| 25BJ0024OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA FE RIVER, | Region II | Nueva Vizcaya 2nd DEO | On-Going | ₱140.5M | 94% | High risk93 | Flagged0.004 |
| 25BJ0013OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA FE RIVER, | Region II | Nueva Vizcaya 2nd DEO | On-Going | ₱140.4M | 96% | High risk93 | Flagged0.004 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BE0113CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG CAGAYAN | Region II | Isabela 1st DEO | On-Going | ₱140.2M | 26% | High risk97 | Flagged0.048 |
| 25BE0089CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG CAGAYAN | Region II | Isabela 1st DEO | On-Going | ₱140.3M | 29% | High risk96 | Flagged0.046 |
| 24B00111OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - NUEVA VIZCAYA-PANGASINAN RD, K0219+920 - K0220+210 | Region II | Region II | On-Going | ₱192.8M | 72% | High risk79 | Flagged0.032 |
| 25CN0157CONSTRUCTION OF MULTI-PURPOSE BUILDING , BARANGAY ZABALI, BALER, AURORA | Region III | Aurora DEO | On-Going | ₱96M | 14% | High risk96 | Flagged0.032 |
| 24A00340CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LAOAG-SAN NICOLAS BY-PASS ROAD (SAN NICOLAS SECTION), ILOCOS NORTE (PACKAGE B) | Region I | Region I | On-Going | ₱193M | 100% | High risk71 | Flagged0.025 |
| 25A00280CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LAOAG-SAN NICOLAS BYPASS ROAD (SAN NICOLAS SECTION), PACKAGE A, ILOCOS NORTE | Region I | Region I | On-Going | ₱187.3M | 99% | High risk94 | Flagged0.024 |
| 25B00066CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY - K0247 + 000 - K0248 + 000, K0262 + 000 - K0262 + 874, K0281 + 101 - K0282 | Region II | Region II | On-Going | ₱186.5M | 0% | High risk71 | Flagged0.023 |
| 25A00110REPLACEMENT OF PERMANENT WEAK BRIDGES - CAUPLASAN BR. (B02395LZ) ALONG ILOCOS NORTE-APAYAO RD (PHASE III) | Region I | Region I | On-Going | ₱140.4M | 18% | High risk67 | Flagged0.023 |
| 24B00153DEPARTMENT OF HEALTH - FY 2024 HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP): RURAL HEALTH UNITS (RURAL HEALTH UNIT) - COMPLETION/ UPGRADING/ REPAIR AND EQUIPPING OF RURAL HEALTH UNIT - STA. FE RURAL HEALTH UNIT | Region II | Region II | On-Going | ₱5.7M | 0% | Medium risk43 | Flagged0.019 |
| 24B00147DEPARTMENT OF HEALTH - FY 2024 HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP): RURAL HEALTH UNITS (RURAL HEALTH UNIT) - COMPLETION/ EQUIPPING OF SUPER HEALTH CENTERS - QUEZON SUPER HEALTH CENTER | Region II | Region II | On-Going | ₱6M | 1% | Medium risk43 | Flagged0.019 |
| 25BH0244OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - GARIT BR. (B04867LZ) ALONG JCT. IPIL - QUIRINO BRDY. RD. (PHASE II) | Region II | Isabela 4th DEO | On-Going | ₱51.5M | 12% | High risk64 | Flagged0.019 |
| 25BH0035SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF GUCAB BRIDGE, PHASE III, BARANGAY GUCAB, ECHAGUE, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱95.5M | 34% | High risk70 | Flagged0.018 |
| 19B00043OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES: SAN PEDRO BRIDGE (B04450LZ) ALONG NRJ VILLA SUR-SAN PEDRO-CABUA-AN-YSMAEL-DISIMUNGAL ROAD, MADDELA, QUIRINO | Region II | Region II | Completed | ₱538.7M | 100% | High risk63 | Flagged0.014 |
| 25BE0062ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PHASE 4, | Region II | Isabela 1st DEO | On-Going | ₱138.8M | 77% | High risk94 | Flagged0.012 |
| 25BE0063ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PHASE 4 | Region II | Isabela 1st DEO | On-Going | ₱138.8M | 76% | High risk94 | Flagged0.012 |
| 25CN0162CONSTRUCTION OF DAMAGED PAVED ROADS, DINGALAN, AURORA | Region III | Aurora DEO | On-Going | ₱18.2M | 56% | High risk95 | Flagged0.012 |
| 24B00150DOH - FY 2024 HEALTH CARE FACILITIES ENHANCEMENT PROGRAM (HFEP): LGU HOSPITALS - LGU HOSPITALS - KASIBU MUNICIPAL HOSPITAL | Region II | Region II | On-Going | ₱24.1M | 31% | Medium risk44 | Flagged0.011 |
| 25BI0012CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES CONSTRUCTION OF CONCRETE ROAD, | Region II | Nueva Vizcaya DEO | On-Going | ₱29.1M | 84% | High risk95 | Flagged0.010 |
| 25CN0181CONSTRUCTION OF VIRGIN COCONUT OIL (PREMIUM BUILDING), DINGALAN, AURORA | Region III | Aurora DEO | On-Going | ₱17.6M | 25% | Medium risk32 | Flagged0.010 |
| 24BI0033ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - COLOCOL BR. 2 (B01245LZ) ALONG DAANG MAHARLIKA BY-PASS RD.BAYOMBONG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | On-Going | ₱14.7M | 90% | High risk74 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 22ED0029WIDENING OF PERMANENT BRIDGES - BAMBANIN BR. (B00017MR) ALONG CALAPAN SOUTH RD., VICTORIA, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱23.5M | 100% | Medium risk39 | —-0.054 |
| 202 | 20CN0026CONSTRUCTION OF TWO (2) - STOREY DPWH DISTRICT ENGINERING OFFICE BUILDING - ANNEX, BALER, AURORA | Region III | Aurora DEO | Completed | ₱28.5M | 100% | Medium risk39 | —-0.094 |
| 203 | 22CN0061CONSTRUCTION (COMPLETION) OF DPWH AURORA DEO ANNEX BUILDING, BRGY. RESERVA, BALER, AURORA | Region III | Aurora DEO | Completed | ₱19M | 100% | Medium risk38 | —-0.099 |
| 204 | 23CN0059CONSTRUCTION (COMPLETION) OF DPWH AURORA DEO ANNEX BUILDING, BRGY. RESERVA, BALER, AURORA | Region III | Aurora DEO | Completed | ₱25M | 100% | Medium risk38 | —-0.096 |
| 205 | 22EI0030WIDENING OF PERMANENT BRIDGE: WAWAN BR. (B00067MR) ALONG CALAPAN SOUTH ROAD, MANSALAY, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱18.2M | 100% | Medium risk38 | —-0.052 |
| 206 | 25EI0014RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES: LANGGANG BR. (B00038MR) ALONG CALAPAN SOUTH ROAD GLORIA, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱4.9M | 100% | Medium risk38 | —-0.053 |
| 207 | 21CN0009CONSTRUCTION OF DPWH AURORA DEO ANNEX BUILDING, BRGY. RESERVA, BALER, AURORA | Region III | Aurora DEO | Completed | ₱13.2M | 100% | Medium risk38 | —-0.100 |
| 208 | 23CN0172CONSTRUCTION OF SEAWALL (PHASE 1), MINANGA, CASIGURAN, AURORA | Region III | Aurora DEO | Completed | ₱39.2M | 100% | Medium risk38 | —-0.088 |
| 209 | 22CN0148CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. L. PIMENTEL, SAN LUIS, AURORA | Region III | Aurora DEO | Completed | ₱28.5M | 100% | Medium risk38 | —-0.094 |
| 210 | 23CN0061CONSTRUCTION OF DPWH AURORA DISTRICT ENGINEERING OFFICE FACILITIES, BALER, AURORA | Region III | Aurora DEO | Completed | ₱6.2M | 100% | Medium risk38 | —-0.102 |
| 211 | 25EI0017RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES: TINALUNAN BR. (B00040MR) ALONG CALAPAN SOUTH ROAD GLORIA, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱10.6M | 100% | Medium risk38 | —-0.056 |
| 212 | 25EI0012RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES: CONCEPCION BR. (B00048MR) ALONG CALAPAN SOUTH ROAD BANSUD, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱7.7M | 100% | Medium risk38 | —-0.054 |
| 213 | 25EI0015RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES: PAG-ASA BR. (B00045MR) ALONG CALAPAN SOUTH ROAD BANSUD, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱8.7M | 100% | Medium risk38 | —-0.055 |
| 214 | 25EI0013RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES: LABASAN BR. (B00053MR) ALONG CALAPAN SOUTH ROAD BONGABONG, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱8.7M | 100% | Medium risk38 | —-0.055 |
| 215 | 19CN0080CONSTRUCTION OF ROAD, BARANGAY PINGIT TO DIPANAMIANAN, BALER, AURORA | Region III | Aurora DEO | Completed | ₱49.5M | 100% | Medium risk38 | —-0.101 |
| 216 | 19CN0049CONSTRUCTION OF DINALUNGAN FLOOD CONTROL, DINALUNGAN, AURORA | Region III | Aurora DEO | Completed | ₱24.5M | 100% | Medium risk37 | —-0.088 |
| 217 | 19CN0129CONCRETING OF ROAD, BRGY. URA, DILASAG, AURORA | Region III | Aurora DEO | Completed | ₱19.8M | 100% | Medium risk37 | —-0.098 |
| 218 | 24CN0065CONSTRUCTION OF ROAD, SO. TAPAO, BRGY. BUTAS NA BATO, DINGALAN, AURORA | Region III | Aurora DEO | Completed | ₱48.3M | 100% | Medium risk37 | —-0.103 |
| 219 | 20CN0019CONSTRUCTION OF FLOOD CONTROL MINANGA RIVER, CASIGURAN, AURORA | Region III | Aurora DEO | Completed | ₱28.5M | 100% | Medium risk36 | —-0.088 |
| 220 | 22CN0121CONSTRUCTION OF SEAWALL, BRGY. DIAGYAN, DILASAG, AURORA | Region III | Aurora DEO | Completed | ₱19.6M | 100% | Medium risk36 | —-0.087 |
| 221 | 21CN0129CONCRETING OF BRGY. DIBET TO BRGY. BIANOAN FMR, BRGY. DIBET AND BRGY. BIANOAN, CASIGURAN, AURORA | Region III | Aurora DEO | Completed | ₱26.9M | 100% | Medium risk36 | —-0.034 |
| 222 | 24CN0128CONSTRUCTION OF ROAD, BRGY. LIPIT, DIPACULAO, AURORA | Region III | Aurora DEO | On-Going | ₱28.8M | 92% | Medium risk36 | —-0.067 |
| 223 | 20CN0057CONCRETING OF ROAD, BRGY. MANGGITAHAN, DILASAG, AURORA | Region III | Aurora DEO | Completed | ₱9.8M | 100% | Medium risk35 | —-0.098 |
| 224 | 22CN0182CONSTRUCTION OF FLOOD CONTROL STRUCTURES IN BARANGAY PALTIC, DINGALAN, AURORA | Region III | Aurora DEO | Completed | ₱49M | 100% | Medium risk35 | —-0.091 |
| 225 | 18CN0165CONSTRUCTION OF FLOOD CONTROL MITIGATION, SITIO AVES 2, BRGY. PALTIC, DINGALAN, AURORA | Region III | Aurora DEO | Completed | ₱14.5M | 100% | Medium risk34 | —-0.088 |