Opening the dossier…
Opening the dossier…
Contractor dossier
115 projects on file, including joint ventures this contractor is part of.
Total projects
115
Total budget
₱4B
Average progress
99.0%
Completion rate
92.2%
Average risk score
46.3
Medium risk on average, out of 100
Flagged as unusual
2
1.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 115 | ₱4B | 46.3 | 2 | 99.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 46 | ₱2.4B | 49.5 | 0 | 99.3% |
| Roads | 40 | ₱1.1B | 45.8 | 0 | 99.8% |
| Buildings and Facilities | 25 | ₱188M | 34.8 | 0 | 99.6% |
| GAA 2025 OO-2 | 2 | ₱192.9M | 94.2 | 1 | 90.5% |
| GAA 2025 OO-1 | 1 | ₱38M | 92.9 | 1 | 57.5% |
| Bridges, Roads | 1 | ₱108.6M | 61.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BF0032OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (SANTIAGO SECTION PHASE 2), BARANGAY SANTIAGO, QUIRINO, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.4M | 91% | High risk94 | Flagged0.000 |
| 25BG0020OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG GANANO RIVER, BARANGAY DAGUPAN, ALICIA, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱96.4M | 90% | High risk94 | —-0.003 |
| 25BF0086ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ROXAS BYPASS ROAD, ISABELA, ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱38M | 57% | High risk93 | Flagged0.006 |
| 17BF0026NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS PRIMARY ROADS-OTHER PRIMARY ROADS ALONG SANTIAGO-TUGUEGARAO ROAD (S00760LZ), K0405-000-K0407+000, QUEZON, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱54.9M | 100% | High risk67 | —-0.048 |
| 17BG0043MFO 2: FLOOD MANAGEMENT SERVICES - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CAGAYAN RIVER FLOOD CONTROL PROJECT, CENTRO, ANGADANAN SECTION, ISABELA, CENTRO II, ANGADANAN, ISABEL | Region II | Isabela 3rd DEO | Completed | ₱19.1M | 100% | High risk67 | —-0.044 |
| 17BF0025CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT (BRGY. ANAO SECTION), STA.0+000-STA.0+600, ROXAS, ISABELA, BRGY. ANAO, ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱18.6M | 100% | High risk67 | —-0.023 |
| 17BG0023ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGEMENT-4 (HDM-4) - PRIMARY - SANTIAGO-TUGUEGARAO RD. K0356+611 - K0357+000, DIAMANTI | Region II | Isabela 3rd DEO | Completed | ₱5.1M | 100% | High risk66 | —-0.056 |
| 17BF0008REPAIR/REHABILITATION/CONCRETING OF ROAD, BRGY. GANGALAN-BRGY. DEL PILAR, SAN MARIANO, ISABELA 2ND LD, SAN MARIANO, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱9.4M | 100% | High risk65 | —-0.053 |
| 17BF0054ROAD CONCRETING, BRGY. CABARUAN TO QUINALABASA, CABARUAN, NAGUILIAN, ISABELA, CABARUAN, NAGUILIAN, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱9.4M | 100% | High risk65 | —-0.056 |
| 15BF0160NETWORK DEV'T: OFF-CARRIAGEWAY IMPV'T(PAVING/SEALING OF SHOULDER) INCLUDING RD. SLOPE PROTECTION & D | Region II | Isabela 2nd DEO | Completed | ₱31.2M | 100% | High risk65 | —-0.036 |
| 16BF0123NETWORK DEVELOPMENT: OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE-TERTIARY ALONG ILAGAN-DELFIN ALBANO-MALLIG ROAD, K0443+742-K0443+863, K0443+892-K0445+009, K0445+045-K0446+300, MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱45.4M | 100% | High risk65 | —-0.051 |
| 25BG0161OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY MINANGA | Region II | Isabela 3rd DEO | On-Going | ₱93.6M | 100% | High risk63 | —-0.034 |
| 25BF0041OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (VILLA MIGUEL DOWNSTREAM SECTION), BARANGAY VILLA MIGUEL, QUIRINO, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.4M | 88% | High risk62 | —-0.025 |
| 25BF0037OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, (RIZAL SECTION PHASE II) QUIRINO, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.4M | 98% | High risk62 | —-0.030 |
| 24BG0008OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. MAGSAYSAY, | Region II | Isabela 3rd DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.053 |
| 24BG0060OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJ, BRGY MALALATANG GRANDE(STA0+000-STA0+468.30) | Region II | Isabela 3rd DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.050 |
| 24BG0043OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL, BRGY. MALLALATANG GRANDE, R | Region II | Isabela 3rd DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.052 |
| 25BG0094OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS & PRINCIPAL RIVERS- CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BRGY. DISTRICT 2, PHASE3 | Region II | Isabela 3rd DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.052 |
| 24BF0045ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF MALLIG RIVER FLOOD CO | Region II | Isabela 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.052 |
| 19BF0102NETWORK DEVELOPMENT CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ROXAS BYPASS ROAD, ISABELA, ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱108.6M | 100% | High risk61 | —-0.048 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BF0086ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ROXAS BYPASS ROAD, ISABELA, ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱38M | 57% | High risk93 | Flagged0.006 |
| 25BF0032OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (SANTIAGO SECTION PHASE 2), BARANGAY SANTIAGO, QUIRINO, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.4M | 91% | High risk94 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25BF0032OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (SANTIAGO SECTION PHASE 2), BARANGAY SANTIAGO, QUIRINO, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.4M | 91% | High risk94 | Flagged0.000 |
| 2 | 25BG0020OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG GANANO RIVER, BARANGAY DAGUPAN, ALICIA, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱96.4M | 90% | High risk94 | —-0.003 |
| 3 | 25BF0086ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ROXAS BYPASS ROAD, ISABELA, ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱38M | 57% | High risk93 | Flagged0.006 |
| 4 | 17BF0026NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS PRIMARY ROADS-OTHER PRIMARY ROADS ALONG SANTIAGO-TUGUEGARAO ROAD (S00760LZ), K0405-000-K0407+000, QUEZON, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱54.9M | 100% | High risk67 | —-0.048 |
| 5 | 17BG0043MFO 2: FLOOD MANAGEMENT SERVICES - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CAGAYAN RIVER FLOOD CONTROL PROJECT, CENTRO, ANGADANAN SECTION, ISABELA, CENTRO II, ANGADANAN, ISABEL | Region II | Isabela 3rd DEO | Completed | ₱19.1M | 100% | High risk67 | —-0.044 |
| 6 | 17BF0025CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT (BRGY. ANAO SECTION), STA.0+000-STA.0+600, ROXAS, ISABELA, BRGY. ANAO, ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱18.6M | 100% | High risk67 | —-0.023 |
| 7 | 17BG0023ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGEMENT-4 (HDM-4) - PRIMARY - SANTIAGO-TUGUEGARAO RD. K0356+611 - K0357+000, DIAMANTI | Region II | Isabela 3rd DEO | Completed | ₱5.1M | 100% | High risk66 | —-0.056 |
| 8 | 17BF0008REPAIR/REHABILITATION/CONCRETING OF ROAD, BRGY. GANGALAN-BRGY. DEL PILAR, SAN MARIANO, ISABELA 2ND LD, SAN MARIANO, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱9.4M | 100% | High risk65 | —-0.053 |
| 9 | 17BF0054ROAD CONCRETING, BRGY. CABARUAN TO QUINALABASA, CABARUAN, NAGUILIAN, ISABELA, CABARUAN, NAGUILIAN, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱9.4M | 100% | High risk65 | —-0.056 |
| 10 | 15BF0160NETWORK DEV'T: OFF-CARRIAGEWAY IMPV'T(PAVING/SEALING OF SHOULDER) INCLUDING RD. SLOPE PROTECTION & D | Region II | Isabela 2nd DEO | Completed | ₱31.2M | 100% | High risk65 | —-0.036 |
| 11 | 16BF0123NETWORK DEVELOPMENT: OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE-TERTIARY ALONG ILAGAN-DELFIN ALBANO-MALLIG ROAD, K0443+742-K0443+863, K0443+892-K0445+009, K0445+045-K0446+300, MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱45.4M | 100% | High risk65 | —-0.051 |
| 12 | 25BG0161OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY MINANGA | Region II | Isabela 3rd DEO | On-Going | ₱93.6M | 100% | High risk63 | —-0.034 |
| 13 | 25BF0041OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (VILLA MIGUEL DOWNSTREAM SECTION), BARANGAY VILLA MIGUEL, QUIRINO, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.4M | 88% | High risk62 | —-0.025 |
| 14 | 25BF0037OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, (RIZAL SECTION PHASE II) QUIRINO, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.4M | 98% | High risk62 | —-0.030 |
| 15 | 24BG0008OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. MAGSAYSAY, | Region II | Isabela 3rd DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.053 |
| 16 | 24BG0060OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJ, BRGY MALALATANG GRANDE(STA0+000-STA0+468.30) | Region II | Isabela 3rd DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.050 |
| 17 | 24BG0043OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL, BRGY. MALLALATANG GRANDE, R | Region II | Isabela 3rd DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.052 |
| 18 | 25BG0094OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS & PRINCIPAL RIVERS- CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BRGY. DISTRICT 2, PHASE3 | Region II | Isabela 3rd DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.052 |
| 19 | 24BF0045ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF MALLIG RIVER FLOOD CO | Region II | Isabela 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.052 |
| 20 | 19BF0102NETWORK DEVELOPMENT CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ROXAS BYPASS ROAD, ISABELA, ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱108.6M | 100% | High risk61 | —-0.048 |
| 21 | 23B00011ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ALICIA-ANGADANAN-SAN GUILLERMO-CAUAYAN CITY-NAGUILIAN ALTERNATE ROUTE, PACKAGE 1, ISABELA | Region II | Region II | Completed | ₱99.4M | 100% | Medium risk56 | —-0.068 |
| 22 | 24BF0002FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT (BARANGAY STO. DOMINGO PHASE II), STA. 0+800 - STA. 1+600, QUIRINO, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱89.4M | 100% | Medium risk53 | —-0.056 |
| 23 | 18B00017OO 1: ENSURE SAFE AND RELIABLE NAT'L RD. SYSTEM: NETWORK DEV'T: CONST'N OF BY-PASS AND DIVERSION ROAD: GUIBANG-GAMU BY-PASS ROAD, INCLUDING ROW, ISABELA, GAMU, ISABELA | Region II | Region II | Completed | ₱72.2M | 100% | Medium risk51 | —-0.070 |
| 24 | 22B00030OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0373+(-387.25) - K0374+170 | Region II | Region II | Completed | ₱57.1M | 100% | Medium risk51 | —-0.078 |
| 25 | 22BF0078ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF SIFFU RIVER FLOOD CONTROL STRUCTURE (SUERTE SECTI | Region II | Isabela 2nd DEO | Completed | ₱67.5M | 100% | Medium risk51 | —-0.063 |