Opening the dossier…
Opening the dossier…
Contractor dossier
115 projects on file, including joint ventures this contractor is part of.
Total projects
115
Total budget
₱4B
Average progress
99.0%
Completion rate
92.2%
Average risk score
46.3
Medium risk on average, out of 100
Flagged as unusual
2
1.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 115 | ₱4B | 46.3 | 2 | 99.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 46 | ₱2.4B | 49.5 | 0 | 99.3% |
| Roads | 40 | ₱1.1B | 45.8 | 0 | 99.8% |
| Buildings and Facilities | 25 | ₱188M | 34.8 | 0 | 99.6% |
| GAA 2025 OO-2 | 2 | ₱192.9M | 94.2 | 1 | 90.5% |
| GAA 2025 OO-1 | 1 | ₱38M | 92.9 | 1 | 57.5% |
| Bridges, Roads | 1 | ₱108.6M | 61.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BF0032OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (SANTIAGO SECTION PHASE 2), BARANGAY SANTIAGO, QUIRINO, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.4M | 91% | High risk94 | Flagged0.000 |
| 25BG0020OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG GANANO RIVER, BARANGAY DAGUPAN, ALICIA, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱96.4M | 90% | High risk94 | —-0.003 |
| 25BF0086ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ROXAS BYPASS ROAD, ISABELA, ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱38M | 57% | High risk93 | Flagged0.006 |
| 17BF0026NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS PRIMARY ROADS-OTHER PRIMARY ROADS ALONG SANTIAGO-TUGUEGARAO ROAD (S00760LZ), K0405-000-K0407+000, QUEZON, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱54.9M | 100% | High risk67 | —-0.048 |
| 17BG0043MFO 2: FLOOD MANAGEMENT SERVICES - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CAGAYAN RIVER FLOOD CONTROL PROJECT, CENTRO, ANGADANAN SECTION, ISABELA, CENTRO II, ANGADANAN, ISABEL | Region II | Isabela 3rd DEO | Completed | ₱19.1M | 100% | High risk67 | —-0.044 |
| 17BF0025CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT (BRGY. ANAO SECTION), STA.0+000-STA.0+600, ROXAS, ISABELA, BRGY. ANAO, ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱18.6M | 100% | High risk67 | —-0.023 |
| 17BG0023ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGEMENT-4 (HDM-4) - PRIMARY - SANTIAGO-TUGUEGARAO RD. K0356+611 - K0357+000, DIAMANTI | Region II | Isabela 3rd DEO | Completed | ₱5.1M | 100% | High risk66 | —-0.056 |
| 17BF0008REPAIR/REHABILITATION/CONCRETING OF ROAD, BRGY. GANGALAN-BRGY. DEL PILAR, SAN MARIANO, ISABELA 2ND LD, SAN MARIANO, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱9.4M | 100% | High risk65 | —-0.053 |
| 17BF0054ROAD CONCRETING, BRGY. CABARUAN TO QUINALABASA, CABARUAN, NAGUILIAN, ISABELA, CABARUAN, NAGUILIAN, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱9.4M | 100% | High risk65 | —-0.056 |
| 15BF0160NETWORK DEV'T: OFF-CARRIAGEWAY IMPV'T(PAVING/SEALING OF SHOULDER) INCLUDING RD. SLOPE PROTECTION & D | Region II | Isabela 2nd DEO | Completed | ₱31.2M | 100% | High risk65 | —-0.036 |
| 16BF0123NETWORK DEVELOPMENT: OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE-TERTIARY ALONG ILAGAN-DELFIN ALBANO-MALLIG ROAD, K0443+742-K0443+863, K0443+892-K0445+009, K0445+045-K0446+300, MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱45.4M | 100% | High risk65 | —-0.051 |
| 25BG0161OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY MINANGA | Region II | Isabela 3rd DEO | On-Going | ₱93.6M | 100% | High risk63 | —-0.034 |
| 25BF0041OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (VILLA MIGUEL DOWNSTREAM SECTION), BARANGAY VILLA MIGUEL, QUIRINO, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.4M | 88% | High risk62 | —-0.025 |
| 25BF0037OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, (RIZAL SECTION PHASE II) QUIRINO, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.4M | 98% | High risk62 | —-0.030 |
| 24BG0008OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. MAGSAYSAY, | Region II | Isabela 3rd DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.053 |
| 24BG0060OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJ, BRGY MALALATANG GRANDE(STA0+000-STA0+468.30) | Region II | Isabela 3rd DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.050 |
| 24BG0043OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL, BRGY. MALLALATANG GRANDE, R | Region II | Isabela 3rd DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.052 |
| 25BG0094OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS & PRINCIPAL RIVERS- CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BRGY. DISTRICT 2, PHASE3 | Region II | Isabela 3rd DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.052 |
| 24BF0045ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF MALLIG RIVER FLOOD CO | Region II | Isabela 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.052 |
| 19BF0102NETWORK DEVELOPMENT CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ROXAS BYPASS ROAD, ISABELA, ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱108.6M | 100% | High risk61 | —-0.048 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BF0086ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ROXAS BYPASS ROAD, ISABELA, ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱38M | 57% | High risk93 | Flagged0.006 |
| 25BF0032OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (SANTIAGO SECTION PHASE 2), BARANGAY SANTIAGO, QUIRINO, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.4M | 91% | High risk94 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 22BF0003SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL STRUCTURE (SITIO PAG-ASA SECTION PHASE II ) BRGY. SIMIMBAAN, ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱41.7M | 100% | Medium risk44 | —-0.067 |
| 77 | 19BF0060ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS-DAANG MAHARLIKA (S00782LZ), DAANG MAHARLIKA, K0385+000-K0385+220, K0386+014-K0386+102, K0386+291-K0386+375, K0389+073-K0389+152, K0392+283-K0392+336, K0392+356 | Region II | Isabela 2nd DEO | Completed | ₱23.4M | 100% | Medium risk44 | —-0.082 |
| 78 | 18BG0039CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL PROJECT (BRIDGE PROTECTION WORKS) SAN ROQUE, SAN MATEO, ISABELA STA. 0+000 - STA. 0+200.00 | Region II | Isabela 3rd DEO | Completed | ₱27.9M | 100% | Medium risk44 | —-0.070 |
| 79 | 23BG0038OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BARANG | Region II | Isabela 3rd DEO | Completed | ₱43.4M | 100% | Medium risk44 | —-0.064 |
| 80 | 21BH0172CONSTRUCTION OF DIBULO FLOOD CONTROL PROJECT, DIBULO, DINAPIGUE, ISABELA | Region II | Isabela 4th DEO | Completed | ₱42.1M | 100% | Medium risk44 | —-0.065 |
| 81 | 24BG0127CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY ANTONINO, ALICIA, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱9.9M | 92% | Medium risk44 | —-0.050 |
| 82 | 21BH0175CONSTRUCTION OF RIZALUNA FLOOD CONTROL PROJECT | Region II | Isabela 4th DEO | Completed | ₱23.8M | 100% | Medium risk44 | —-0.070 |
| 83 | 21BF0017ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ROXAS BYPASS ROAD, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱27.4M | 100% | Medium risk43 | —-0.084 |
| 84 | 20BF0043ROAD OPENING OF SIEMPRE VIVA SUR TO CENTRO, MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱9.7M | 100% | Medium risk43 | —-0.085 |
| 85 | 19BF0079ROAD CONCRETING OF BARANGAY PINTOR TO BARANGAY UNION, BARANGAY UNION, GAMU, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱4.8M | 100% | Medium risk43 | —-0.084 |
| 86 | 18BF0064NETWORK DEVELOPMENT: OFF CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS ALONG SANTIAGO -TUGUEGARAO ROAD (S00760LZ), K0392+500 -K0392+540, K0392+670-K0392+710, K0393+000-K0393+040, MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱5.6M | 100% | Medium risk43 | —-0.086 |
| 87 | 20BF0017ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENTCONSTRUCTION OF BYPASS AND DIVERSION ROADS ROXAS BYPASS ROAD, ISABELA, ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱19.2M | 100% | Medium risk43 | —-0.085 |
| 88 | 19BF0026CONCRETING OF BARANGAY CATABBAN ROAD, BRGY. CATABBAN, BURGOS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱4.8M | 100% | Medium risk43 | —-0.080 |
| 89 | 18BF0054CONSTRUCTION OF CONCRETE ROAD, BRGY. HOLY FRIDAY-OLANGO, MALLIG, ISABELA, MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱9.4M | 100% | Medium risk43 | —-0.083 |
| 90 | 19BF0092REPAIR AND REHABILITATION OF BARANGAY ROADS BRGY. SAN JOSE SUR,MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱9.6M | 100% | Medium risk43 | —-0.084 |
| 91 | 23BF0100MODIFIED STANDARD DPWH-DEPED CONSTRUCTION OF ONE (1) STOREY -THREE (3) CLASSROOM SCHOOL BUILDING (1STY-3CL), TUROD ELEMENTARY SCHOOL, QUEZON, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱6.6M | 100% | Medium risk43 | —-0.042 |
| 92 | 18BF0096CONSTRUCTION OF STANDARD TWO-STOREY FOUR CLASSROOM SCHOOL BUILDING, BIMONTON INTEGRATED SCHOOL, MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱9.6M | 100% | Medium risk43 | —-0.042 |
| 93 | 18BG0130CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING WITH TOILET (9.5M X 18.00M PLUS CR), MARABULIG II ELEMENTARY SCHOOL, CAUAYAN CITY, ISABELA SCHOOL ID NO. 103232 | Region II | Isabela 3rd DEO | Completed | ₱5.6M | 100% | Medium risk43 | —-0.042 |
| 94 | 23BF0023MODIFIED STANDARD DPWH-DEPED CONSTRUCTION OF 1STY3CL (WITH TOILET ATTACHED), MAMBABANGA ELEMENTARY SCHOOL, LUNA, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱6.5M | 100% | Medium risk42 | —-0.043 |
| 95 | 23BF0025MODIFIED STANDARD DPWH-DEPEDCONSTRUCTION OF 1STY3CL (WITH TOILET ATTACHED), PUROC-CONCEPCION ELEMENTARY SCHOOL, LUNA, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱6.5M | 100% | Medium risk42 | —-0.043 |
| 96 | 23BF0097MODIFIED STANDARD DPWH-DEPED CONSTRUCTION OF ONE (1) STOREY THREE (3) CLASSROOM SCHOOL BUILDING (1STY-3CL), MATUSALEM ELEMENTARY SCHOOL, ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱6.6M | 100% | Medium risk42 | —-0.042 |
| 97 | 23BG0201CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING WITH TOILET ATTACHED AT EACH CLASSROOM, 103620 DANGAN ELEMENTARY SCHOOL, REINA MERCEDES, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱6.5M | 100% | Medium risk42 | —-0.042 |
| 98 | 23BF0096MODIFIED STANDARD DPWH-DEPED CONSTRUCTION OF ONE (1) STOREY THREE (3) CLASSROOM SCHOOL BUILDING (1STY-3CL), CULLALABO ELEMENTARY SCHOOL, BURGOS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱6.6M | 100% | Medium risk42 | —-0.042 |
| 99 | 23BG0202CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING WITH TOILET ATTACHED AT EACH CLASSROOM, 103627 SANTOR ELEMENTARY SCHOOL, REINA MERCEDES, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱6.5M | 100% | Medium risk42 | —-0.042 |
| 100 | 17BG0225CONSTRUCTION OF FOUR (4) STOREY TWENTY (20) CLASSROOM SCHOOL BUILDING CAUAYAN CITY NATIONAL HIGH SCHOOL (BUILDING 1), CAUAYAN CITY, ISABELA, SCHOOL ID NO. 300516 | Region II | Isabela 3rd DEO | Completed | ₱38.7M | 100% | Medium risk42 | —-0.011 |