Contractor dossier
3 projects on file, including joint ventures this contractor is part of.
Total projects
3
Total budget
₱14.5M
Average progress
100.0%
Completion rate
100.0%
Average risk score
40.4
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 3 | ₱14.5M | 40.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| OTHER | 1 | ₱9.6M | 70.6 | 0 | 100.0% |
| Buildings and Facilities | 1 | ₱2M | 25.5 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱3M | 25.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22DD0292CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD WITH DRAINAGE, BARANGAY SAN LUCAS, LIPA CITY, | Region IV-A | Batangas 4th DEO | Completed | ₱9.6M | 100% | High risk71 | —-0.041 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 22DD0292CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD WITH DRAINAGE, BARANGAY SAN LUCAS, LIPA CITY, | Region IV-A | Batangas 4th DEO | Completed | ₱9.6M | 100% | High risk71 | —-0.041 |
| 2 | 19DC0070LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. NIYUGAN, LAUREL, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱2M | 100% | Low risk25 | —-0.102 |
| 3 | 19DD0126LOCAL PROGRAM, WATER MANAGEMENT FACILITIES- WATER SUPPLY- LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION OF WATER SUPPLY SYSTEM, BRGY. TUGTUG, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱3M | 100% | Low risk25 | —-0.069 |