Contractor dossier
113 projects on file, including joint ventures this contractor is part of.
Total projects
113
Total budget
₱7.7B
Average progress
93.2%
Completion rate
76.1%
Average risk score
53.4
Medium risk on average, out of 100
Flagged as unusual
8
7.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 111 | ₱7.7B | 53.7 | 8 | 93.1% |
| Region I | 2 | ₱9.5M | 39.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 61 | ₱4.6B | 50.8 | 0 | 94.6% |
| Flood Control and Drainage | 30 | ₱1.7B | 50.4 | 0 | 94.6% |
| Buildings and Facilities | 7 | ₱34M | 30.5 | 0 | 100.0% |
| OTHER | 5 | ₱402.7M | 75.0 | 2 | 97.6% |
| GAA 2025 OO-2 | 3 | ₱366.1M | 92.6 | 2 | 66.3% |
| GAA 2025 SSP | 2 | ₱153M | 94.8 | 2 | 65.3% |
| GAA 2025 OO-1 | 2 | ₱68.1M | 93.1 | 2 | 61.5% |
| Bridges | 2 | ₱217.1M | 60.8 | 0 | 90.0% |
| Bridges, Roads | 1 | ₱138.9M | 62.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25P00013CONSTRUCTION OF POTIA - NAMNAMA - HALAG - NATTUM ROAD, STA. 0+000 - STA.3+000, ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 44% | High risk95 | Flagged0.027 |
| 25P00002CONSTRUCTION OF ROAD, ABINUAN - NATTUM - ALIMIT, MAYOYAO, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱58M | 86% | High risk95 | Flagged0.012 |
| 25P00011CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINTO STA.31+800 - STA. 33+650 (L/S) ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱190M | 50% | High risk93 | Flagged0.026 |
| 25PJ002925PJ0029: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STA. 26 +900 - STA. 28+200 (R/S), BUSILAC, ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Ifugao 2nd DEO | On-Going | ₱123.5M | 78% | High risk93 | Flagged0.007 |
| 25PG0008CONST'N./UPGRADING/REHAB. OF DRAINAGE ALONG NVA. VIZ.-IFU-MT. PROV. RD. - K0318+248-K0318+418, K0318+497, K0319+000-K0319+169, K0319+595, K0319+740, K0319+844, LAGAWE, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | On-Going | ₱32.6M | 40% | High risk93 | Flagged0.007 |
| 25PF0009REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS: GOV. BADO DANGWA NATIONAL RD - K0325+110 - K0325+125, K0329+830-K0330+100, K0334+080-K0334+135, K0334+942 - K0335+000, K0336+068 - K0336+110, K0336+351 - K0 | Cordillera Administrative Region | Benguet 2nd DEO | On-Going | ₱35.5M | 83% | High risk93 | Flagged0.001 |
| 25PG0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG IBULAO RIVER, STA. 329+250 - STA. 330+000, OLILICON, LAGAWE, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | On-Going | ₱52.6M | 71% | High risk91 | —-0.003 |
| 24PF0050CONSTRUCTION OF NAPSONG-OLIWEK-SAKAANG-SALENG ROAD, KIBUNGAN, BENGUET | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱147.5M | 100% | High risk78 | —-0.002 |
| 17P00001ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD K0330+722 - K0333+401 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | High risk78 | —-0.002 |
| 24P00017CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAMUT RIVER, STA.18+825 - STA.19+570 (L/S), LAWIG, LAMUT, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱48.3M | 99% | High risk76 | Flagged0.000 |
| 18PE0029CONSTRUCTION OF CONCRETE ROAD - BAGUIO-BONTOC ROAD JCT. TO BATAN-ADAOAY, KABAYAN ROAD IN SUPPORT OF VEGETABLE, AND PROCESSED TEA AND COFFEE INDUSTRY, KABAYAN, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱28.9M | 100% | High risk72 | —-0.018 |
| 24P00064REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG KIANGAN-TINOC-BUGUIAS RD - (S00634LZ) CHAINAGE 27705 - CHAINAGE 27768, CHAINAGE 38876 - CHAINAGE 38921, CHAINAGE 41830 - CHAINAGE 41860, CHAINAGE 43251- CHAIN | Cordillera Administrative Region | Ifugao 1st DEO | On-Going | ₱33.3M | 89% | High risk72 | Flagged0.003 |
| 21P00022CLUSTER: 1. CONSTRUCTION OF SAN JUAN FLOOD CONTROL, STA. 38+023 - STA. 38+792 (LS) 2. CONSTRUCTION OF CALUPAAN FLOOD CONTROL, STA. 40+975 - STA. 41+668 (LS), 3. CONSTRUCTION OF CALIMAG FLOOD CONTROL, STA. 5+823 - STA. 6+132, ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱123.5M | 100% | High risk63 | —-0.052 |
| 18P00051ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING ROAD STANDARDS TO PAVED (HDM-4 PROJECT ANALYSIS) ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD, K0333+401 - K0336+226 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱114.3M | 100% | High risk63 | —-0.036 |
| 18P00039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM TALOY NORTE JCT. - SAN PASCUAL BRGY. HALL JCT. (SECTION 7 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD) INCL. RROW, BRIDGE, AND SLOPE PROTECTION | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱138.9M | 100% | High risk63 | —-0.041 |
| 22P00087(A) CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAGAWE RIVER, STA. 0+000 - STA. 1+219 (TUNGNGOD SIDE), LAGAWE, IFUGAO(B) CONSTRUCTION OF BOLIWONG FLOOD CONTROL STRUCTURE, STA. 3+858 - STA. 3+900 AND STA. 4+869 - STA. 5+182, LAGAWE, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱111.6M | 100% | High risk63 | —-0.054 |
| 24P00012CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF PINTO FLOOD CONTROL, STA.32+000 - STA.33+550 (RS), PINTO, ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | High risk62 | —-0.055 |
| 24P00029ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MANAAN FLOOD CONTROL (PHASE II) LUHONG, TINOC, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | High risk61 | —-0.058 |
| 24P00030ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DANGGO FLOOD CONTROL (PHASE II) DANGGO, TINOC, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | High risk61 | —-0.058 |
| 24PJ001124PJ0011: CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF BRIDGE, MAGUITAWA-D | Cordillera Administrative Region | Ifugao 2nd DEO | On-Going | ₱111M | 80% | High risk61 | —-0.008 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25P00013CONSTRUCTION OF POTIA - NAMNAMA - HALAG - NATTUM ROAD, STA. 0+000 - STA.3+000, ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 44% | High risk95 | Flagged0.027 |
| 25P00011CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINTO STA.31+800 - STA. 33+650 (L/S) ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱190M | 50% | High risk93 | Flagged0.026 |
| 25P00002CONSTRUCTION OF ROAD, ABINUAN - NATTUM - ALIMIT, MAYOYAO, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱58M | 86% | High risk95 | Flagged0.012 |
| 25PG0008CONST'N./UPGRADING/REHAB. OF DRAINAGE ALONG NVA. VIZ.-IFU-MT. PROV. RD. - K0318+248-K0318+418, K0318+497, K0319+000-K0319+169, K0319+595, K0319+740, K0319+844, LAGAWE, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | On-Going | ₱32.6M | 40% | High risk93 | Flagged0.007 |
| 25PJ002925PJ0029: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STA. 26 +900 - STA. 28+200 (R/S), BUSILAC, ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Ifugao 2nd DEO | On-Going | ₱123.5M | 78% | High risk93 | Flagged0.007 |
| 24P00064REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG KIANGAN-TINOC-BUGUIAS RD - (S00634LZ) CHAINAGE 27705 - CHAINAGE 27768, CHAINAGE 38876 - CHAINAGE 38921, CHAINAGE 41830 - CHAINAGE 41860, CHAINAGE 43251- CHAIN | Cordillera Administrative Region | Ifugao 1st DEO | On-Going | ₱33.3M | 89% | High risk72 | Flagged0.003 |
| 25PF0009REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS: GOV. BADO DANGWA NATIONAL RD - K0325+110 - K0325+125, K0329+830-K0330+100, K0334+080-K0334+135, K0334+942 - K0335+000, K0336+068 - K0336+110, K0336+351 - K0 | Cordillera Administrative Region | Benguet 2nd DEO | On-Going | ₱35.5M | 83% | High risk93 | Flagged0.001 |
| 24P00017CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAMUT RIVER, STA.18+825 - STA.19+570 (L/S), LAWIG, LAMUT, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱48.3M | 99% | High risk76 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 23P00002ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - KIANGAN-ASIPULO-AMBAGUIO-BAYOMBONG ROAD, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱134.9M | 100% | Medium risk59 | —-0.066 |
| 27 | 21P00036ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS GOV. BADO DANGWA NATIONAL ROADK0308+979 - KO309+08 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱193M | 100% | Medium risk59 | —-0.049 |
| 28 | 22P00061CONSTRUCTION OF BEYENG - TACADANG ROADBAKUN & KIBUNGAN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱198M | 100% | Medium risk58 | —-0.043 |
| 29 | 24P00007ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BANAUE - MAYOYAO - A LISTA - ISABELA BDRY RD, K034 | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱93.2M | 96% | Medium risk58 | —-0.042 |
| 30 | 22P00007ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4A OF BLISTT O | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | Medium risk58 | —-0.058 |
| 31 | 21P00049ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS / NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4B OF BLI | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | Medium risk58 | —-0.062 |
| 32 | 22P00004ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN TUBA AND TUBLAY, KAMOG JCT. - CALOT - PAPPA - BAGONG - BALLUAY - TUEL JCT | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱289.5M | 100% | Medium risk58 | —-0.040 |
| 33 | 19PE0028CONSTRUCTION OF MISSING LINKS / NEW ROADS: CONSTRUCTION OF GRAVEL ROAD - SPECIFIC LOCATION ALONG BAGUIO-LA TRINIDAD-ITOGON-SABLAN-TUBA & TUBLAY (BLISTT), TALOY NORTE JCT.-SAN PASCUAL BRGY. HALL (SECTION 7 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD), PACKAG | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱95M | 100% | Medium risk57 | —-0.074 |
| 34 | 22P00068A) BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD, K0358 + 842 - K0359 + 047B) BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD, K0362 + 080 - K0362 + 140BANAUE, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱124.5M | 100% | Medium risk57 | —-0.070 |
| 35 | 21P00003ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, BANAUE - MAYOYAO - A. LISTA - ISABELA ROAD, KO34 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱105.3M | 100% | Medium risk56 | —-0.076 |
| 36 | 21P00004ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, BANAUE - MAYOYAO - A. LISTA - ISABELA ROAD, KO36 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱99.2M | 100% | Medium risk56 | —-0.076 |
| 37 | 24P00040REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - KIANGAN-TINOC-BUGUIAS RD - (S00634LZ) CHAINAGE 29864 - CHAINAGE 29914TINOC, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱96.5M | 95% | Medium risk56 | —-0.043 |
| 38 | 21P00083LOCAL PROGRAM: CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS - ROAD OPENING OF BOLOK - ADAOAY - BAJEN - BATAN ACCESS ROAD, BATAN AND ANCHOKEYKABAYAN, BENGU | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | Medium risk56 | —-0.072 |
| 39 | 21P00035ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS GOV. BADO DANGWA NATIONAL ROADK0345 + 520 - K0345 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱101.3M | 100% | Medium risk56 | —-0.075 |
| 40 | 21P00086LOCAL PROGRAM: CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS CONSTRUCTION / IMPROVEMENT OF BEYENG - TACADANG ROAD, TACADANG, KIBUNGAN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | Medium risk56 | —-0.073 |
| 41 | 21P00087LOCAL PROGRAM: CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS CONSTRUCTION / IMPROVEMENT OF DADA - BEYENG - KAYAPA ROAD, DADA, BEYENG AND KAYAPA, BAKUN, BENGU | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | Medium risk56 | —-0.074 |
| 42 | 24PF0021REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS: GOV. BADO DANGWA NATIONAL RD - K0345+696 - K0345+836 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱89.8M | 100% | Medium risk54 | —-0.079 |
| 43 | 24PG0027BOLIWONG-JUCBONG-ABINUAN-PONGHAL-LUTA-CABA-TUNGNGOD ACCESS ROAD IN SUPPORT OF AGRI-PRODUCTION, COFFEE AND GINGER TEA PROCESSING, LAGAWE, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | On-Going | ₱70.6M | 93% | Medium risk53 | —-0.041 |
| 44 | 22PJ001722PJ0017: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS NUEVA VIZCAYA-IFUGAO-MT. PROVINCE ROAD-K0344+019.60-K0344+092, K0352+154-K0352+580, K0354+412-K0354+543.5, K0357+7 | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱88.3M | 100% | Medium risk53 | —-0.076 |
| 45 | 23PJ001523PJ0015: ORGANIZATIONAL OUTCOME: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-BANAUE-MAYOYAO-A. LISTA-ISABELA BDRY. RD- K0347+524-K0347+69 | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱67.7M | 100% | Medium risk53 | —-0.080 |
| 46 | 24PJ000724PJ0007: ASSET PRESERVATION - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROADS-NUEVA VIZCAYA-IFUGAO-MT. PROVINCE RD-KO335+621, K0336+909, K0336+979, K0337+439, K0337+985, K0338+167, K0338+316, K0338+683, K0338+760, | Cordillera Administrative Region | Ifugao 2nd DEO | On-Going | ₱60.2M | 91% | Medium risk52 | —-0.044 |
| 47 | 22PG0014KIANGAN-ASIPULO-AMBAGUIO-BAYOMBONG ROAD, PACKAGE 1, IFUGAO, ASIPULO, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | Completed | ₱59.9M | 100% | Medium risk52 | —-0.077 |
| 48 | 24P00038REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - KIANGAN-TINOC-BUGUIAS RD - CHAINAGE 25765 - CHAINAGE 25905TINOC, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱62.4M | 100% | Medium risk52 | —-0.083 |
| 49 | 23PJ001823PJ0018: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF BUSILAC FLOOD CONTROL, STA. 27+753-STA. 28+951 (LS), ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱86.9M | 100% | Medium risk52 | —-0.060 |
| 50 | 23P00035CONSTRUCTION OF FLOOD CONTROL ALONG TINOC RIVER, STA. 104+400 - STA.105+535 (DANGGO SECTION), TINOC, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱78.9M | 100% | Medium risk52 | —-0.064 |