Contractor dossier
113 projects on file, including joint ventures this contractor is part of.
Total projects
113
Total budget
₱7.7B
Average progress
93.2%
Completion rate
76.1%
Average risk score
53.4
Medium risk on average, out of 100
Flagged as unusual
8
7.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 111 | ₱7.7B | 53.7 | 8 | 93.1% |
| Region I | 2 | ₱9.5M | 39.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 61 | ₱4.6B | 50.8 | 0 | 94.6% |
| Flood Control and Drainage | 30 | ₱1.7B | 50.4 | 0 | 94.6% |
| Buildings and Facilities | 7 | ₱34M | 30.5 | 0 | 100.0% |
| OTHER | 5 | ₱402.7M | 75.0 | 2 | 97.6% |
| GAA 2025 OO-2 | 3 | ₱366.1M | 92.6 | 2 | 66.3% |
| GAA 2025 SSP | 2 | ₱153M | 94.8 | 2 | 65.3% |
| GAA 2025 OO-1 | 2 | ₱68.1M | 93.1 | 2 | 61.5% |
| Bridges | 2 | ₱217.1M | 60.8 | 0 | 90.0% |
| Bridges, Roads | 1 | ₱138.9M | 62.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25P00013CONSTRUCTION OF POTIA - NAMNAMA - HALAG - NATTUM ROAD, STA. 0+000 - STA.3+000, ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 44% | High risk95 | Flagged0.027 |
| 25P00002CONSTRUCTION OF ROAD, ABINUAN - NATTUM - ALIMIT, MAYOYAO, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱58M | 86% | High risk95 | Flagged0.012 |
| 25P00011CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINTO STA.31+800 - STA. 33+650 (L/S) ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱190M | 50% | High risk93 | Flagged0.026 |
| 25PJ002925PJ0029: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STA. 26 +900 - STA. 28+200 (R/S), BUSILAC, ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Ifugao 2nd DEO | On-Going | ₱123.5M | 78% | High risk93 | Flagged0.007 |
| 25PG0008CONST'N./UPGRADING/REHAB. OF DRAINAGE ALONG NVA. VIZ.-IFU-MT. PROV. RD. - K0318+248-K0318+418, K0318+497, K0319+000-K0319+169, K0319+595, K0319+740, K0319+844, LAGAWE, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | On-Going | ₱32.6M | 40% | High risk93 | Flagged0.007 |
| 25PF0009REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS: GOV. BADO DANGWA NATIONAL RD - K0325+110 - K0325+125, K0329+830-K0330+100, K0334+080-K0334+135, K0334+942 - K0335+000, K0336+068 - K0336+110, K0336+351 - K0 | Cordillera Administrative Region | Benguet 2nd DEO | On-Going | ₱35.5M | 83% | High risk93 | Flagged0.001 |
| 25PG0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG IBULAO RIVER, STA. 329+250 - STA. 330+000, OLILICON, LAGAWE, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | On-Going | ₱52.6M | 71% | High risk91 | —-0.003 |
| 24PF0050CONSTRUCTION OF NAPSONG-OLIWEK-SAKAANG-SALENG ROAD, KIBUNGAN, BENGUET | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱147.5M | 100% | High risk78 | —-0.002 |
| 17P00001ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD K0330+722 - K0333+401 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | High risk78 | —-0.002 |
| 24P00017CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAMUT RIVER, STA.18+825 - STA.19+570 (L/S), LAWIG, LAMUT, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱48.3M | 99% | High risk76 | Flagged0.000 |
| 18PE0029CONSTRUCTION OF CONCRETE ROAD - BAGUIO-BONTOC ROAD JCT. TO BATAN-ADAOAY, KABAYAN ROAD IN SUPPORT OF VEGETABLE, AND PROCESSED TEA AND COFFEE INDUSTRY, KABAYAN, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱28.9M | 100% | High risk72 | —-0.018 |
| 24P00064REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG KIANGAN-TINOC-BUGUIAS RD - (S00634LZ) CHAINAGE 27705 - CHAINAGE 27768, CHAINAGE 38876 - CHAINAGE 38921, CHAINAGE 41830 - CHAINAGE 41860, CHAINAGE 43251- CHAIN | Cordillera Administrative Region | Ifugao 1st DEO | On-Going | ₱33.3M | 89% | High risk72 | Flagged0.003 |
| 21P00022CLUSTER: 1. CONSTRUCTION OF SAN JUAN FLOOD CONTROL, STA. 38+023 - STA. 38+792 (LS) 2. CONSTRUCTION OF CALUPAAN FLOOD CONTROL, STA. 40+975 - STA. 41+668 (LS), 3. CONSTRUCTION OF CALIMAG FLOOD CONTROL, STA. 5+823 - STA. 6+132, ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱123.5M | 100% | High risk63 | —-0.052 |
| 18P00051ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING ROAD STANDARDS TO PAVED (HDM-4 PROJECT ANALYSIS) ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD, K0333+401 - K0336+226 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱114.3M | 100% | High risk63 | —-0.036 |
| 18P00039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM TALOY NORTE JCT. - SAN PASCUAL BRGY. HALL JCT. (SECTION 7 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD) INCL. RROW, BRIDGE, AND SLOPE PROTECTION | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱138.9M | 100% | High risk63 | —-0.041 |
| 22P00087(A) CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAGAWE RIVER, STA. 0+000 - STA. 1+219 (TUNGNGOD SIDE), LAGAWE, IFUGAO(B) CONSTRUCTION OF BOLIWONG FLOOD CONTROL STRUCTURE, STA. 3+858 - STA. 3+900 AND STA. 4+869 - STA. 5+182, LAGAWE, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱111.6M | 100% | High risk63 | —-0.054 |
| 24P00012CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF PINTO FLOOD CONTROL, STA.32+000 - STA.33+550 (RS), PINTO, ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | High risk62 | —-0.055 |
| 24P00029ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MANAAN FLOOD CONTROL (PHASE II) LUHONG, TINOC, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | High risk61 | —-0.058 |
| 24P00030ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DANGGO FLOOD CONTROL (PHASE II) DANGGO, TINOC, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | High risk61 | —-0.058 |
| 24PJ001124PJ0011: CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF BRIDGE, MAGUITAWA-D | Cordillera Administrative Region | Ifugao 2nd DEO | On-Going | ₱111M | 80% | High risk61 | —-0.008 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25P00013CONSTRUCTION OF POTIA - NAMNAMA - HALAG - NATTUM ROAD, STA. 0+000 - STA.3+000, ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 44% | High risk95 | Flagged0.027 |
| 25P00011CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINTO STA.31+800 - STA. 33+650 (L/S) ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱190M | 50% | High risk93 | Flagged0.026 |
| 25P00002CONSTRUCTION OF ROAD, ABINUAN - NATTUM - ALIMIT, MAYOYAO, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱58M | 86% | High risk95 | Flagged0.012 |
| 25PG0008CONST'N./UPGRADING/REHAB. OF DRAINAGE ALONG NVA. VIZ.-IFU-MT. PROV. RD. - K0318+248-K0318+418, K0318+497, K0319+000-K0319+169, K0319+595, K0319+740, K0319+844, LAGAWE, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | On-Going | ₱32.6M | 40% | High risk93 | Flagged0.007 |
| 25PJ002925PJ0029: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STA. 26 +900 - STA. 28+200 (R/S), BUSILAC, ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Ifugao 2nd DEO | On-Going | ₱123.5M | 78% | High risk93 | Flagged0.007 |
| 24P00064REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG KIANGAN-TINOC-BUGUIAS RD - (S00634LZ) CHAINAGE 27705 - CHAINAGE 27768, CHAINAGE 38876 - CHAINAGE 38921, CHAINAGE 41830 - CHAINAGE 41860, CHAINAGE 43251- CHAIN | Cordillera Administrative Region | Ifugao 1st DEO | On-Going | ₱33.3M | 89% | High risk72 | Flagged0.003 |
| 25PF0009REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS: GOV. BADO DANGWA NATIONAL RD - K0325+110 - K0325+125, K0329+830-K0330+100, K0334+080-K0334+135, K0334+942 - K0335+000, K0336+068 - K0336+110, K0336+351 - K0 | Cordillera Administrative Region | Benguet 2nd DEO | On-Going | ₱35.5M | 83% | High risk93 | Flagged0.001 |
| 24P00017CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAMUT RIVER, STA.18+825 - STA.19+570 (L/S), LAWIG, LAMUT, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱48.3M | 99% | High risk76 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 22PG0005REHAB./RECONST'N. OF NAT'L RDS. W/ SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY RDS. ALONG NVA-VIZ-IFU-MT. PROV. BDRY RD., K0304+477-K0304+498, K0305+800-K0305+900,K0320+517-K0320+545,K0320+910-K0320+935,K0322+687-K0322+707,K0332+199-K0332+221, K0332+305 | Cordillera Administrative Region | Ifugao 1st DEO | Completed | ₱44.1M | 100% | Medium risk46 | —-0.078 |
| 77 | 23PJ000123PJ0001: ASSET PRESERVATION -REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE, COLLAPSE, AND LANDSLIDE- SECONDARY ROADS-BANAUE-MAYOYAO-A. LISTA-ISABELA BDRY. RD (ITEM 522) K0350+775-K0350+867, BANAUE, IFUGAO | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱39.2M | 100% | Medium risk46 | —-0.084 |
| 78 | 24PG0005REHAB./RECONS'N. OF NAT'LS RDS W/ SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG KIANGAN-TINOC-BUGUIAS RD, CHAINAGE26244-CHAINAGE26344, CHAINAGE26382-CHAINAGE26509, CHAINAGE26879-CHAINAGE26909, CHAINAGE27932-CHAINAGE27970, CHAINAGE28006-CHAINAGE28030, CHAINAGE | Cordillera Administrative Region | Ifugao 1st DEO | Completed | ₱30.7M | 100% | Medium risk46 | —-0.084 |
| 79 | 24PG0071RESTORATION OF ROAD SECTION WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG BANAUE-HUNGDUAN-BENGUET BDRY. ROAD K0408+000 - K0408+400, TINOC, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | On-Going | ₱38.5M | 0% | Medium risk46 | —-0.020 |
| 80 | 25PG0050CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG IBULAO RIVER, STA. 350+000 - STA. 350+400, LAGAWE, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | On-Going | ₱37.4M | 11% | Medium risk46 | —-0.013 |
| 81 | 24PG0017CONSTRUCTION OF NABUNLAN MUNGAYANG CIS FLOOD CONTROL STRUCTURE, KIANGAN, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | Completed | ₱32.2M | 100% | Medium risk46 | —-0.068 |
| 82 | 24PG0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TINOC RIVER, STA. 98+350 - STA. 98+940 (MANAAN SECTION), TINOC, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | Completed | ₱38.8M | 100% | Medium risk46 | —-0.067 |
| 83 | 23P00032ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL ALONG TINOC RIVER, STA. 98+960 - STA. | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱32M | 100% | Medium risk46 | —-0.069 |
| 84 | 23P00033CONSTRUCTION OF FLOOD CONTROL ALONG LAMUT RIVER, STA. 18+300 - STA. 18+900 (LAWIG SIDE), LAMUT, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱38.1M | 78% | Medium risk46 | —-0.017 |
| 85 | 25PG0015CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG IBULAO RIVER, STA. 331+630 - STA. 332+180, HAPID, LAMUT, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | On-Going | ₱38.5M | 72% | Medium risk46 | —-0.028 |
| 86 | 22P00085CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAMUT RIVER, STA.18+300 - STA.18+800 AND STA. 18+985 - STA.19+111 (PIEZA SIDE)LAMUT, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱38.1M | 100% | Medium risk46 | —-0.067 |
| 87 | 24PG0015CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TINOC RIVER, STA. 103+900 - STA. 104+415, DANGGO, TINOC, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | Completed | ₱36.2M | 100% | Medium risk46 | —-0.068 |
| 88 | 18PF0068CONSTRUCTION OF TWO-STOREY, FOUR-CLASSROOM SCHOOL BUILDING AT AMPUSONGAN NATIONAL HIGH SCHOOL MAIN SCHOOL | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱10.2M | 100% | Medium risk46 | —-0.044 |
| 89 | 23PJ0010ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS-BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD K0397+(-043)-K0397+(-004), K0397+000-K0397+125,K0397+013-K0397+049, K0397+115-K0397+130, K04 | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱44.1M | 100% | Medium risk46 | —-0.080 |
| 90 | 22PJ001322PJ0013: CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIO | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱31.1M | 100% | Medium risk46 | —-0.083 |
| 91 | 24PJ000524PJ0005: ASSET PRESERVATION PROGRAM- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS NUEVA VIZCAYA-IFUGAO-MT. PROVINCE RD - K0344 + 017 - K0344 + 092, BANAUE, IFUGAO | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱18.3M | 100% | Medium risk45 | —-0.086 |
| 92 | 23PJ001123PJ0011: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS-ALFONSO LISTA-AURORA BDRY. RD- K0449+270-K0450+050, ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱39.2M | 100% | Medium risk45 | —-0.082 |
| 93 | 22PJ000222PJ0002: NETWORK DEVELOPMENT-OFF-CARRIAGEWAY IMPROVEMENT-TERTIARY ROADS-ALFONSO LISTA-AURORA BDRY. RD. K0442+402-K0444+622, K0444+811-K0445+000, ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱31.2M | 100% | Medium risk45 | —-0.084 |
| 94 | 22PJ0003ACCESS ROAD LEADING TO AMMUNG FESTIVAL, YAO JIA XI DRAGON FRUIT FARM, DOMINGO'SINTEGRATED ORGANIC FARM, MUNICIPAL FOREST LIBRARY (MAGAT DAM WETLANDS, MARIS DAM WETLANDS, BFAR-AQUA PARK) BRGY. STO DOMINGO, ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱30.7M | 100% | Medium risk45 | —-0.084 |
| 95 | 24PJ000624PJ0006: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS NUEVA VIZCAYA-IFUGAO-MT PROVINCE RD - K0354 + 536 - K0354 + 573, BANAUE, IFUGAO | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱27.2M | 100% | Medium risk45 | —-0.085 |
| 96 | 23P00034ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL ALONG TINOC RIVER, STA. 21+310 - STA. | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱29.7M | 100% | Medium risk45 | —-0.069 |
| 97 | 18PF0020CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES: BAGUIO-BONTOC ROAD JCT. MADAYMEN-MASALA-SAGPAT ROAD IN SUPPORT OF COFFEE, BAMBOO, FOOD AND FEED CROPS, CUTFLOWERS AND FRUIT TREES INDUSTRY, KIBUNGAN, BENGUET, STA. | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱37.3M | 100% | Medium risk45 | —-0.082 |
| 98 | 19PF0026ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS, ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD, K0337+118-K0337+208, K0337+798-K0337+963, K0338+0 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱34.3M | 100% | Medium risk45 | —-0.082 |
| 99 | 20PF0017CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES: GUISWAK-LOKOT-AMBALIDENG ACCESS ROAD IN SUPPORT OF COFFEE, CACAO, BAMBOO, CUT FLOWER, BANANA, LIVESTOCK, HEIRLOOM RICE, AND HIGH VALUE | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱29.4M | 100% | Medium risk45 | —-0.083 |
| 100 | 21PF0062CONSTRUCTION OF AMPUSONGAN FLOOD CONTROL PHASE 2, BARANGAY AMPUSONGAN, BAKUN, BENGUET | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱9.9M | 100% | Medium risk44 | —-0.069 |