Contractor dossier
66 projects on file, including joint ventures this contractor is part of.
Total projects
66
Total budget
₱4.4B
Average progress
90.2%
Completion rate
72.7%
Average risk score
53.9
Medium risk on average, out of 100
Flagged as unusual
6
9.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 45 | ₱2.7B | 48.8 | 2 | 93.8% |
| Region IX | 13 | ₱1.3B | 70.5 | 4 | 79.7% |
| Region IV-A | 4 | ₱254.3M | 59.0 | 0 | 100.0% |
| National Capital Region | 4 | ₱205.2M | 52.2 | 0 | 73.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 34 | ₱2.4B | 52.4 | 1 | 93.1% |
| Buildings and Facilities | 12 | ₱636M | 47.4 | 2 | 83.3% |
| Flood Control and Drainage | 11 | ₱588.9M | 51.5 | 0 | 90.3% |
| OTHER | 4 | ₱438.4M | 77.4 | 2 | 90.7% |
| GAA 2025 OO-2 | 2 | ₱192.4M | 93.6 | 1 | 63.8% |
| Water Provision and Storage | 2 | ₱75.1M | 46.5 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱76.9M | 51.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25J00029CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD (S01112MN) RIGHT | Region IX | Region IX | On-Going | ₱96.2M | 56% | High risk94 | Flagged0.001 |
| 25J00028CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD (S01112MN) LEFT | Region IX | Region IX | On-Going | ₱96.2M | 72% | High risk94 | —-0.001 |
| 24J00041CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY ROAD (S01112MN) LEFT | Region IX | Region IX | On-Going | ₱146.2M | 72% | High risk82 | Flagged0.033 |
| 24J00042CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY ROAD (S01112MN) RIGHT | Region IX | Region IX | On-Going | ₱146.2M | 90% | High risk82 | Flagged0.028 |
| 17K00058CONST. OF TANGUB-BONIFACIO BYPASS RD INCL.ROW & BR,MIS.OCC. 2ND LD | Region X | Region X | Completed | ₱87.8M | 100% | High risk76 | —-0.008 |
| 24J00120PAVING OF UNPAVED ROADS - SECONDARY ROADS LILOY - SIOCON ROAD (S01330MN) | Region IX | Region IX | On-Going | ₱143.3M | 85% | High risk73 | —-0.029 |
| 25JI0024CONSTRUCTION OF BUUG COASTAL ROAD, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | On-Going | ₱131M | 55% | High risk72 | —-0.028 |
| 19DC0004ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM | Region IV-A | Batangas 3rd DEO | Completed | ₱58.3M | 100% | High risk70 | —-0.039 |
| 25J00063ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱159.8M | 6% | High risk69 | Flagged0.018 |
| 21J00059REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - RIZAL - DAKAK - DAPITAN COASTAL LOOP ROAD | Region IX | Region IX | On-Going | ₱102.9M | 100% | High risk68 | —-0.016 |
| 21OE0022REHABILITATION OF RCBC ALONG E. QUINTOS STREET CHAINAGE 000.00 -CHAINAGE 803.00, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱94M | 100% | High risk65 | —-0.077 |
| 23DE0095CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF DRAINAGE ALONG BATANGAS PORT DIVERSION RD, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱99M | 100% | High risk64 | —-0.076 |
| 22JD0066SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONST. OF ROAD BRGY. MALIGAYA, POLANCO TO BRGY. SINAAD, SERGIO OSMEÑA,ZN | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱62.1M | 100% | High risk62 | —-0.025 |
| 24JD0018CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), CONSTRUCTION OF ACCESS ROAD LEADING TO ROCK DIVE INN, CRYSTAL BEACH, AZUL MAR BEACH, LILOY, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | On-Going | ₱57M | 100% | High risk61 | —-0.046 |
| 23K00067CONST. OF BY-PASS AND DIVERSION ROADS, ILIGAN CITY COASTAL BYPASS ROAD, PACKAGE 12, LANAO DEL NORTE | Region X | Region X | Completed | ₱141.2M | 100% | High risk60 | —-0.061 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25K00426CONSTRUCTION OF ONE (1) UNIT 4-STOREY 12 DOORS QUARTERING FACILITY FOR OFFICER'S QUARTERS | Region X | Region X | On-Going | ₱111.3M | 0% | Medium risk47 | Flagged0.054 |
| 25K00427CONSTRUCTION OF ONE (1) UNIT 4-STOREY 12 DOORS QUARTERING FACILITY FOR ENLISTED PERSONNEL | Region X | Region X | On-Going | ₱85.7M | 0% | Medium risk33 | Flagged0.049 |
| 24J00041CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY ROAD (S01112MN) LEFT | Region IX | Region IX | On-Going | ₱146.2M | 72% | High risk82 | Flagged0.033 |
| 24J00042CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY ROAD (S01112MN) RIGHT | Region IX | Region IX | On-Going | ₱146.2M | 90% | High risk82 | Flagged0.028 |
| 25J00063ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱159.8M | 6% | High risk69 | Flagged0.018 |
| 25J00029CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD (S01112MN) RIGHT | Region IX | Region IX | On-Going | ₱96.2M | 56% | High risk94 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25J00029CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD (S01112MN) RIGHT | Region IX | Region IX | On-Going | ₱96.2M | 56% | High risk94 | Flagged0.001 |
| 2 | 25J00028CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD (S01112MN) LEFT | Region IX | Region IX | On-Going | ₱96.2M | 72% | High risk94 | —-0.001 |
| 3 | 24J00041CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY ROAD (S01112MN) LEFT | Region IX | Region IX | On-Going | ₱146.2M | 72% | High risk82 | Flagged0.033 |
| 4 | 24J00042CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY ROAD (S01112MN) RIGHT | Region IX | Region IX | On-Going | ₱146.2M | 90% | High risk82 | Flagged0.028 |
| 5 | 17K00058CONST. OF TANGUB-BONIFACIO BYPASS RD INCL.ROW & BR,MIS.OCC. 2ND LD | Region X | Region X | Completed | ₱87.8M | 100% | High risk76 | —-0.008 |
| 6 | 24J00120PAVING OF UNPAVED ROADS - SECONDARY ROADS LILOY - SIOCON ROAD (S01330MN) | Region IX | Region IX | On-Going | ₱143.3M | 85% | High risk73 | —-0.029 |
| 7 | 25JI0024CONSTRUCTION OF BUUG COASTAL ROAD, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | On-Going | ₱131M | 55% | High risk72 | —-0.028 |
| 8 | 19DC0004ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM | Region IV-A | Batangas 3rd DEO | Completed | ₱58.3M | 100% | High risk70 | —-0.039 |
| 9 | 25J00063ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱159.8M | 6% | High risk69 | Flagged0.018 |
| 10 | 21J00059REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - RIZAL - DAKAK - DAPITAN COASTAL LOOP ROAD | Region IX | Region IX | On-Going | ₱102.9M | 100% | High risk68 | —-0.016 |
| 11 | 21OE0022REHABILITATION OF RCBC ALONG E. QUINTOS STREET CHAINAGE 000.00 -CHAINAGE 803.00, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱94M | 100% | High risk65 | —-0.077 |
| 12 | 23DE0095CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF DRAINAGE ALONG BATANGAS PORT DIVERSION RD, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱99M | 100% | High risk64 | —-0.076 |
| 13 | 22JD0066SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONST. OF ROAD BRGY. MALIGAYA, POLANCO TO BRGY. SINAAD, SERGIO OSMEÑA,ZN | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱62.1M | 100% | High risk62 | —-0.025 |
| 14 | 24JD0018CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), CONSTRUCTION OF ACCESS ROAD LEADING TO ROCK DIVE INN, CRYSTAL BEACH, AZUL MAR BEACH, LILOY, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | On-Going | ₱57M | 100% | High risk61 | —-0.046 |
| 15 | 23K00067CONST. OF BY-PASS AND DIVERSION ROADS, ILIGAN CITY COASTAL BYPASS ROAD, PACKAGE 12, LANAO DEL NORTE | Region X | Region X | Completed | ₱141.2M | 100% | High risk60 | —-0.061 |
| 16 | 19KA0074ROAD WIDENING - ALONG KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) RD (S00641MN) K1597 + 000 TO K1600 + 250VALENCIA CITY, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.077 |
| 17 | 22K00184CONSTRUCTION OF BY-PASS AND DIVERSION ROAD, OPOL DIVERSION ROAD (OPOL-CANITOAN), PACKAGE 13, CAGAYAN DE ORO CITY SECTION | Region X | Region X | Completed | ₱103M | 100% | Medium risk56 | —-0.069 |
| 18 | 23KM0046CONSTRUCTION OF MISSING LINKS / NEW ROADS ALONG STA. FELOMINA - BONBONON - DIGKILAAN - ROGONGON ROAD, PACKAGE 1, LANAO DEL NORTE | Region X | Iligan City DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.082 |
| 19 | 23J00222CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AT SIBUGUEY RIVER ALONG IMELDA - BAYOG - KUMALARANG - LAPUYAN - MARGOSATUBIG ROAD, BARANGAY PARADISE, DIPLAHAN, ZAMBO | Region IX | Region IX | Completed | ₱48.2M | 100% | Medium risk56 | —-0.075 |
| 20 | 20J00219CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS STRUCTURAL IMPROVEMENT OF PUBLIC BUILDING AND CONSTRUCTION OF EVACUATION CENTERS REGION IX, BRGY. POBLACION, PIÑAN, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱34.4M | 100% | Medium risk53 | —-0.016 |
| 21 | 20J00223CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATION CENTERS - REGION IX, BRGY. CANIANGAN, RAMON MAGSAYSAY, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱34.4M | 100% | Medium risk53 | —-0.015 |
| 22 | 21KJ0121CONSTRUCTION OF MULTI-PURPSE BUILDING CLUSTER (HOUSING PROJECTS), OZAMIZ CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱66.5M | 100% | Medium risk53 | —-0.073 |
| 23 | 21KJ0118CONSTRUCTION OF MULTI-PURPOSE BUILDINGS, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱67.2M | 100% | Medium risk53 | —-0.085 |
| 24 | 20KJ0088CONSTRUCTION AND IMPROVEMENT OF MULTI-PURPOSE BUILDING, TANGUB CITY CLUSTER, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱74.9M | 100% | Medium risk53 | —-0.078 |
| 25 | 19KB0107CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, SAYRE HIGHWAY, K1547+000-K1548+000, K1559+000-K1559+528, K1561+070-K1561+700, TUBIGON, MARAMAG AND SOUTH POBLACION, MARAMAG-CAMP I SECTION, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱63.8M | 100% | Medium risk52 | —-0.084 |