Contractor dossier
147 projects on file, including joint ventures this contractor is part of.
Total projects
147
Total budget
₱4.2B
Average progress
81.7%
Completion rate
43.5%
Below 70%
Average risk score
54.4
Medium risk on average, out of 100
Flagged as unusual
37
25.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 147 | ₱4.2B | 54.4 | 37 | 81.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 38 | ₱460.8M | 44.7 | 1 | 88.7% |
| Bridges | 35 | ₱2.2B | 54.0 | 10 | 80.8% |
| Buildings and Facilities | 35 | ₱295.3M | 43.3 | 0 | 88.8% |
| OTHER | 14 | ₱535.6M | 79.1 | 13 | 83.6% |
| GAA 2025 SSP | 10 | ₱78.2M | 95.4 | 10 | 56.4% |
| Flood Control and Drainage | 8 | ₱341.2M | 50.8 | 0 | 76.3% |
| Water Provision and Storage | 3 | ₱16.1M | 36.5 | 0 | 75.1% |
| GAA 2025 OO-2 | 2 | ₱75.7M | 88.9 | 2 | 43.9% |
| GAA 2025 OO-1 | 1 | ₱144.6M | 95.0 | 1 | 8.7% |
| Bridges, Roads | 1 | ₱34.2M | 47.6 | 0 | 34.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BD0057SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF LOCAL ROAD, BARANGAY NATAPPIAN - BARANGAY BASI EAST, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.8M | 80% | High risk97 | Flagged0.011 |
| 25BD0076BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - MULTI-PURPOSE BUILDING, BARANGAY BICAL, PEÑABLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.8M | 24% | High risk97 | Flagged0.028 |
| 25BD0133BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVERTIBLE TO EVACUATION CENTER), BARANGAY SISIM, PEÑABLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.8M | 65% | High risk97 | Flagged0.018 |
| 25BD0143SUSTAINABLE INFRASTRUCTURE PROGRAM ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD AT SITIO MAASIN, BRGY. IRAGA, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱12.5M | 22% | High risk96 | Flagged0.029 |
| 25BD0135BASIC INFRASTRUCTURE PROGRAM (BIP) - BASIC WATER SUPPLY SYSTEM - CONSTRUCTION OF LEVEL II WATER SYSTEM AT MUNICIPALITY OF AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱9.7M | 52% | High risk96 | Flagged0.022 |
| 25BD0122BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱9.7M | 50% | High risk96 | Flagged0.022 |
| 25BD0127SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE, BARANGAY MANGA, PEÑABLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱11.5M | 31% | High risk96 | Flagged0.026 |
| 25BD0170BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF CSU MULTI-PURPOSE BUILDING CARIG CAMPUS, TUGUEGARAO CITY, CAGAYAN - PHASE II | Region II | Cagayan 3rd DEO | On-Going | ₱15.5M | 85% | High risk96 | Flagged0.012 |
| 25BD0018ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - PEÑABLANCA-CALLAO CAVE ROAD (S05071LZ) - K0475 + 233 - K0483 + 550 & K0484 + 020 - K0486 + 434 (TWO LANES) | Region II | Cagayan 3rd DEO | On-Going | ₱144.6M | 9% | High risk95 | Flagged0.039 |
| 25BD0082BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF MULTI-PURPOSE BUILDING, BARANGAY DODAN, PEÑABLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱2.9M | 53% | High risk94 | Flagged0.022 |
| 25BD0062OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF PINACANAUAN RIVER FLOOD MANAGEMENT PROJECT, CAGGAY, TUGUEGARAO CITY, CAGAYAN - PACKAGE2 | Region II | Cagayan 3rd DEO | On-Going | ₱47.3M | 58% | High risk90 | Flagged0.002 |
| 25BD0085BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF MULTI-PURPOSE BUILDING, BARANGAY NANNARIAN, PEÑABLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱1.9M | 100% | High risk89 | Flagged0.003 |
| 25BD0034OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS - FLOOD MGMT. PROGRAM - CONST./ REHAB. OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS - CONST. OF PINACANAUAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY PARABBA,PEÑABLANCA, CAG. | Region II | Cagayan 3rd DEO | On-Going | ₱28.4M | 30% | High risk87 | Flagged0.006 |
| 24B00055OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - TUGUEGARAO CITY BOULEVARD (PINACANAUAN BRIDGE 2 AND APPROACHES), PHASE 3 (PACKAGE 2) TUGUEGARAO CITY, CAGAYAN | Region II | Region II | On-Going | ₱264.5M | 61% | High risk85 | Flagged0.051 |
| 23B00042OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: CONSTRUCTION OF MISSING LINKS/NEW ROADS -TUGUEGARAO CITY BOULEVARD (PINACANAUAN BRIDGE 2 AND APPROACHES) | Region II | Region II | Completed | ₱101.2M | 100% | High risk84 | —-0.002 |
| 23BD0119SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BRIDGE APPROACHES AT SITIO MAASIN, BRGY. IRAGA, SOLANA, CAGAYAN PHASE II - PACKAGE II | Region II | Cagayan 3rd DEO | On-Going | ₱50.2M | 98% | High risk82 | Flagged0.012 |
| 23BD0111LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAGAYAN STATE UNIVERSITY (CSU), IRAGA, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱7.8M | 81% | High risk80 | Flagged0.018 |
| 25BD0067CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ACCESS ROAD LEADING TO PINICON FALLS, BARANGAY DADDA, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱7.2M | 0% | High risk80 | Flagged0.027 |
| 23BD0150BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF DEPARTMENT OF JUSTICE (DOJ) R02 OFFICE BUILDING, REGIONAL GOVERNMENT CENTER, BARANGAY CARIG, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.8M | 89% | High risk80 | Flagged0.015 |
| 25BD0012CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM- TRIP) - ACCESS ROAD LEADING TO CALLAO CAVES TOURISM ZONE (TAWI-CALLAO ROAD), BRGY. MALIBABAG-BRGY. AGGUGADDAN, PEÑABLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱19.4M | 73% | High risk80 | Flagged0.009 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24B00055OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - TUGUEGARAO CITY BOULEVARD (PINACANAUAN BRIDGE 2 AND APPROACHES), PHASE 3 (PACKAGE 2) TUGUEGARAO CITY, CAGAYAN | Region II | Region II | On-Going | ₱264.5M | 61% | High risk85 | Flagged0.051 |
| 25BD0018ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - PEÑABLANCA-CALLAO CAVE ROAD (S05071LZ) - K0475 + 233 - K0483 + 550 & K0484 + 020 - K0486 + 434 (TWO LANES) | Region II | Cagayan 3rd DEO | On-Going | ₱144.6M | 9% | High risk95 | Flagged0.039 |
| 25BD0143SUSTAINABLE INFRASTRUCTURE PROGRAM ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD AT SITIO MAASIN, BRGY. IRAGA, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱12.5M | 22% | High risk96 | Flagged0.029 |
| 25BD0076BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - MULTI-PURPOSE BUILDING, BARANGAY BICAL, PEÑABLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.8M | 24% | High risk97 | Flagged0.028 |
| 25BD0067CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ACCESS ROAD LEADING TO PINICON FALLS, BARANGAY DADDA, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱7.2M | 0% | High risk80 | Flagged0.027 |
| 25BD0127SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE, BARANGAY MANGA, PEÑABLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱11.5M | 31% | High risk96 | Flagged0.026 |
| 24B00063OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO - ENRILE DIVERSION ROAD (INCLUDING TUGUEGARAO - ENRILE BRIDGE AND APPROACHES, PHASE 3, CAGAYAN | Region II | Region II | On-Going | ₱237.9M | 52% | High risk68 | Flagged0.026 |
| 25B00011OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - TUGUEGARAO CITY BOULEVARD (PINACANAUAN BRIDGE 2 & APPROACHES) | Region II | Region II | On-Going | ₱139.6M | 1% | High risk68 | Flagged0.023 |
| 25BD0135BASIC INFRASTRUCTURE PROGRAM (BIP) - BASIC WATER SUPPLY SYSTEM - CONSTRUCTION OF LEVEL II WATER SYSTEM AT MUNICIPALITY OF AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱9.7M | 52% | High risk96 | Flagged0.022 |
| 25BD0122BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱9.7M | 50% | High risk96 | Flagged0.022 |
| 25BD0082BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF MULTI-PURPOSE BUILDING, BARANGAY DODAN, PEÑABLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱2.9M | 53% | High risk94 | Flagged0.022 |
| 25B00022OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO - SOLANA DIVERSION ROAD (TUGUEGARAO - SOLANA BRIDGE AND APPROACHES), PACKAGE 2, CAGAYAN | Region II | Region II | On-Going | ₱141.7M | 13% | High risk68 | Flagged0.021 |
| 22B00021OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM :CONSTRUCTION OF MISSING LINKS/NEW ROADS: JCT. CAGAYAN VALLEY ROAD-SAMPAGUITA-WARAT-LA SUERTE-CATARAUAN-AFUSING ROAD (AMULUNG BRIDGE AND APPROACHES), CAGAYAN | Region II | Region II | Completed | ₱347.2M | 100% | High risk68 | Flagged0.021 |
| 23B00043OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM : CONSTRUCTION OF MISSING LINKS/NEW ROADS: JCT. CAGAYAN VALLEY ROAD - SAMPAGUITA-WARAT-LA SUERTE-CATARAUAN-AFUSING ROAD (AMULUNG BRIDGE AND APPROACHES), PACKAGE 2 | Region II | Region II | On-Going | ₱192.9M | 99% | High risk68 | Flagged0.019 |
| 25BD0133BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVERTIBLE TO EVACUATION CENTER), BARANGAY SISIM, PEÑABLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.8M | 65% | High risk97 | Flagged0.018 |
| 23BD0111LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAGAYAN STATE UNIVERSITY (CSU), IRAGA, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱7.8M | 81% | High risk80 | Flagged0.018 |
| 24B00062OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO-SOLANA DIVERSION ROAD (TUGUEGARAO- SOLANA BRIDGE AND APPROACHES), PHASE 3 (PACKAGE 2), CAGAYAN | Region II | Region II | On-Going | ₱270M | 90% | High risk68 | Flagged0.017 |
| 20BC0225CONCRETING OF CALAPAWAN, BRGY. SAN JUAN FMR, BRGY. SAN JUAN, BALLESTEROS, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱12.3M | 100% | High risk78 | Flagged0.016 |
| 23BD0150BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF DEPARTMENT OF JUSTICE (DOJ) R02 OFFICE BUILDING, REGIONAL GOVERNMENT CENTER, BARANGAY CARIG, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.8M | 89% | High risk80 | Flagged0.015 |
| 24BD0120OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MGMT PROG. - CONST./ REHAB. OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF PINACANAUAN RIVER FLOOD MGMT PROJECTS, DODAN, PEÑABLANCA, CAGAYAN- PHASE II | Region II | Cagayan 3rd DEO | On-Going | ₱34.2M | 81% | High risk79 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 22BD0109CONSTRUCTION OF BRGY. IRAGA TO BRGY. MALACABIBI FMR, BRGY. IRAGA AND BRGY. MALACABIBI, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱9.9M | 100% | Medium risk41 | —-0.031 |
| 127 | 21BD0137CONSTRUCTION OF FARM-TO-MILL ROAD, SITIO DIVISORIA TO SITIO ASILONG, SAMPAGUITA, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱7.8M | 100% | Medium risk40 | —-0.029 |
| 128 | 19BD0137CONCRETING OF BRGY. CORDOVA-BRGY. NABBIALAN FMR, BRGY. CORDOVA AND BRGY. NABBIALAN, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱4.8M | 100% | Medium risk39 | —-0.030 |
| 129 | 24BD0201CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/REHABILITATION OF RAINWATER COLLECTORS SYSTEM IN PUBLIC FACILITIES | Region II | Cagayan 3rd DEO | On-Going | ₱2.8M | 100% | Medium risk31 | —-0.025 |
| 130 | 24BD0180BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF MULTI-PURPOSE BUILDING, BRGY. NANGALASAUAN, AMULUNG, CAGAY | Region II | Cagayan 3rd DEO | Completed | ₱2.9M | 100% | Medium risk30 | —-0.085 |
| 131 | 24BD0166BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF MULTI- PURPOSE BUILDING, BRGY. CALINTAAN, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱2.9M | 100% | Medium risk30 | —-0.047 |
| 132 | 19BD0140CONSTRUCTION/REHABILITATION OF WATER SUPPLY/RAIN WATER COLLECTORS-20 UNITS, ANNAFUNAN ES, TUG. NORTHEAST ES, ANDARAYAN NHS, SAMPAGUITA ES, GADU NHS, CABBO ES, CABBO NHS, CABASAN ES, TVTS (MAIN) HS, NARUANGAN CS, TVTS (CULUNG) HS, IGUIG CS, STA. TERESA... | Region II | Cagayan 3rd DEO | Completed | ₱3.6M | 100% | Low risk29 | —-0.052 |
| 133 | 24BD0181BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, (BARANGAY HALL) BARANGAY, CENTRO NORTHEAST, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱1.9M | 85% | Low risk29 | —-0.041 |
| 134 | 24BD0183BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (GYM AND GROUNDS), SOLANA NORTH CENTRAL SCHOOL, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱1.9M | 100% | Low risk28 | —-0.048 |
| 135 | 23BD0114BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING (CONVERTIBLE TO EVACUATION CENTER), BARANGAY BACRING, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱2.4M | 100% | Low risk28 | —-0.085 |
| 136 | 20BD0084ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - IGUIG BYPASS ROAD, CAGAYAN, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱4.5M | 100% | Low risk28 | —-0.080 |
| 137 | 22BD0054SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD AT BARANGAY MALACABIBI- IRAGA, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱3.9M | 100% | Low risk27 | —-0.083 |
| 138 | 24BD0036ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - DAPANG BR. (B01119LZ) ALONG SANTIAGO-TUGUEGARAO RD (JCT. KALINGA-TUGUEGARAO SECT) | Region II | Cagayan 3rd DEO | Completed | ₱1.5M | 100% | Low risk21 | —-0.046 |
| 139 | 20BD0141CONCRETING OF FARM-TO-MILL ROAD PROJECT, BRGY. PALCA TO BRGY. LAKAMBINI, TUAO, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱4.2M | 100% | Low risk20 | —-0.031 |
| 140 | 22BD0117CONSTRUCTION OF FARM-TO-MILL ROAD, SITIO DIVISORIA TO SITIO ASILANG, SAMPAGUITA, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱3.9M | 100% | Low risk19 | —-0.032 |
| 141 | 24BD0118BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF MULTI-PURPOSE BUILDING, BRGY. LANNIG, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱1.9M | 100% | Low risk19 | —-0.047 |
| 142 | 19BD0148REPAIR/MAINTENANCE OF NATIONAL ROAD ALONG CAGAYAN VALLEY ROAD, K0475+(-210) - K0475+226, CAMASI, PEÑABLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱2.7M | 100% | Low risk18 | —-0.029 |
| 143 | 20BD0006LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. STA. BARBARA, IGUIG, BRGY. STA. BARBARA, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱974.1K | 100% | Low risk14 | —-0.083 |
| 144 | 20BD0007LOCAL PROGRAM- LOCAL INFRASTRUCTURE PROGRAM -BUILDINGSAND OTHER STRUCTURES- MULTIPURPOSE/FACILITIES - REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. DODAN,PENABLANCA, BRGY. DODAN, PENASBLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱974.1K | 100% | Low risk14 | —-0.082 |
| 145 | 20BD0004LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM -BUILDINGS AND OTHER STRUCTURES- MULTIPURPOSE/FACILITIES -REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. DADDA, AMULUNG, BRGY. DADDA, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱974.6K | 100% | Low risk14 | —-0.084 |
| 146 | 20BD0009LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES -REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. BUGNAY, TUAO, BRGY. BUGNAY, TUAO, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱974.3K | 100% | Low risk14 | —-0.085 |
| 147 | 20BD0005LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES- MULTIPURPOSE/FACILITIES - RAHABILITATION OF MULTI-PURPOSE BUILDING, BRGY., MANALO, AMULUNG, BRGY. MANALO, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱974.5K | 100% | Low risk14 | —-0.084 |