Contractor dossier
150 projects on file, including joint ventures this contractor is part of.
Total projects
150
Total budget
₱5.1B
Average progress
97.1%
Completion rate
88.7%
Average risk score
48.7
Medium risk on average, out of 100
Flagged as unusual
4
2.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 117 | ₱3.3B | 49.6 | 2 | 97.1% |
| Region IV-B | 33 | ₱1.8B | 45.3 | 2 | 97.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 62 | ₱2.6B | 49.4 | 0 | 96.8% |
| Buildings and Facilities | 38 | ₱978.7M | 44.4 | 1 | 99.0% |
| Bridges | 19 | ₱313.5M | 50.6 | 0 | 94.8% |
| Flood Control and Drainage | 19 | ₱721.3M | 46.7 | 0 | 100.0% |
| Water Provision and Storage | 6 | ₱148.2M | 40.8 | 0 | 100.0% |
| OTHER | 4 | ₱236.3M | 76.7 | 2 | 84.9% |
| GAA 2025 SSP | 1 | ₱9.8M | 94.5 | 1 | 59.7% |
| Bridges, Roads | 1 | ₱66.6M | 55.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DK0132CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD FROM BRGY ANOS TO BRGY ILAYANG BUKAL, TAYABAS, QUEZON | Region IV-A | Quezon 1st DEO | On-Going | ₱9.8M | 60% | High risk94 | Flagged0.007 |
| 24EA0050CONSTRUCTION OF WATER SUPPLY SYSTEM (LEVEL III), BUENAVISTA, MARINDUQUE | Region IV-B | Marinduque DEO | On-Going | ₱54M | 100% | High risk79 | Flagged0.008 |
| 25EA0035LOCAL PROGRAM - NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER MULTIPURPOSE/ FACILITIES STRUCTURES, CONSTRUCTION OF DPWH BUILDING, MARINDUQUE DISTRICT ENGINEERING OFFICE, BOAC, MARINDUQUE | Region IV-B | Marinduque DEO | On-Going | ₱53.4M | 40% | High risk79 | Flagged0.012 |
| 17D00028IMPROVEMENT/WIDENING OF NATIONAL ROADS, ALONG N1, DAANG MAHARLIKA (LZ), MSR DIVERSION ROAD, S01994LZ, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱107.8M | 100% | High risk78 | —-0.026 |
| 16DJ0054OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, PRIMARY ROADS, IMPROVEMENT OF INTERSECTION ALONG DAANG MAHARLIKA (LZ) S01985LZ AND LUTUCAN-GUISGUIS PORT ROAD S02003LZ INTERSECTION, K0114+380-K0114+440 SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱21.1M | 100% | High risk72 | —-0.042 |
| 16DK0114NETWORK DEV'T -IMPV'T/WIDENING OF NAT'L ROADS (N1) ALONG DAANG MAHARLIKA (LZ) K0122+098-K0123+000 | Region IV-A | Quezon 1st DEO | Completed | ₱57.9M | 100% | High risk69 | —-0.072 |
| 17DL0098A. MFO-1: NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS B. REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 | Region IV-A | Quezon 4th DEO | Completed | ₱47.9M | 100% | High risk68 | —-0.071 |
| 20DK0043CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DUMACAA RIVER (ALONG PRINCESA BRIDGE) @ BARANGAY IBAS, TAYABAS CITY-QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱19.6M | 100% | High risk67 | —-0.060 |
| 17DL0031A. MFO -1: NATIONAL ROAD NETWORK SERVICES 2. NETWORK DEVELOPMENT A. IMPROVEMENT / WIDENING OF NATIONAL ROADS 1. PRIMARY ROADS B. OTHER PRIMARY ROADS 1. QUIRINO H-WAY - K0251+ - 511 - K0251+000, K0251+359 - K0251+600, K0251+834 - K0252+192 | Region IV-A | Quezon 4th DEO | Completed | ₱47.2M | 100% | High risk67 | —-0.071 |
| 25DK0026ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - JCT LUCBAN-LUISIANA RD - K0130+650 - K0131+193 | Region IV-A | Quezon 1st DEO | On-Going | ₱24.2M | 60% | High risk66 | —-0.036 |
| 20DK0005NETWORK DEVELOPMENT ROAD WIDENING SECONDARY ROAD LUCENA-TAYABAS- LUCBAN-SAMPALOC-MAUBAN PORT ROAD, K0134+170-K0134+460 | Region IV-A | Quezon 1st DEO | Completed | ₱12.7M | 100% | High risk65 | —-0.074 |
| 17DM0006REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0369+200 - K0370+418, K0370+592 - K0371+400 | Region IV-A | Quezon 3rd DEO | Completed | ₱27.4M | 100% | High risk64 | —-0.071 |
| 17EA0079ROAD UPGRADNG (UNPAVED TO PAVED) OF DR. DAMIAN REYES ROAD (BOAC SIDE), K0022+1092.00-K0024+013.00 | Region IV-B | Marinduque DEO | Completed | ₱48.9M | 100% | High risk63 | —-0.037 |
| 21DK0194CONSTRUCTION OF MULTI- PURPOSE BUILDING, BARANGAY LAKAWAN, TAYABAS CITY, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.082 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22DJ0169PROPOSED CONSTRUCTION OF FOUR (4) STOREY WITH ROOF DECK DEPARTMENT OF JUSTICE BUILDING, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱57.1M | 75% | Medium risk49 | Flagged0.031 |
| 25EA0035LOCAL PROGRAM - NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER MULTIPURPOSE/ FACILITIES STRUCTURES, CONSTRUCTION OF DPWH BUILDING, MARINDUQUE DISTRICT ENGINEERING OFFICE, BOAC, MARINDUQUE | Region IV-B | Marinduque DEO | On-Going | ₱53.4M | 40% | High risk79 | Flagged0.012 |
| 24EA0050CONSTRUCTION OF WATER SUPPLY SYSTEM (LEVEL III), BUENAVISTA, MARINDUQUE | Region IV-B | Marinduque DEO | On-Going | ₱54M | 100% | High risk79 | Flagged0.008 |
| 25DK0132CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD FROM BRGY ANOS TO BRGY ILAYANG BUKAL, TAYABAS, QUEZON | Region IV-A | Quezon 1st DEO | On-Going | ₱9.8M | 60% | High risk94 | Flagged0.007 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 17DM0034CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS- REHABILITATION /MAJOR REPAIR OF PERMANENT BRIDGE,, SISIRIN BRIDGE (B02526LZ), BARANGAY SISIRIN, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱10.1M | 100% | Medium risk54 | —-0.037 |
| 27 | 17DM0035CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS- REHABILITATION /MAJOR REPAIR OF PERMANENT BRIDGE, BIGA BRIDGE (B02527LZ), BARANGAY BIGA, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱10.3M | 100% | Medium risk54 | —-0.038 |
| 28 | 17DM0050CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS- REHABILITATION /MAJOR REPAIR OF PERMANENT BRIDGE, VIGO BRIDGE (B03264LZ), BARANGAY VIGO, SAN NARCISO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱11M | 100% | Medium risk54 | —-0.039 |
| 29 | 17DM0048CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS- REHABILITATION /MAJOR REPAIR OF PERMANENT BRIDGE, SAMPALOC BRIDGE (B03261LZ), BARANGAY CAMFLORA, SAN ANDRES, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱12.8M | 100% | Medium risk54 | —-0.037 |
| 30 | 17DM0036CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS- REHABILITATION /MAJOR REPAIR OF PERMANENT BRIDGE, POTOTANIN BRIDGE (B02528LZ), BARANGAY POTOTANIN, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱9.5M | 100% | Medium risk54 | —-0.037 |
| 31 | 17DM0044CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS- REHABILITATION /MAJOR REPAIR OF PERMANENT BRIDGE, KAWAYANIN BRIDGE (B02964LZ), BARANGAY KAWAYANIN, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱7.4M | 100% | Medium risk54 | —-0.036 |
| 32 | 17DM0022CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES, KABULUAN BR. (B02533LZ) ALONG GUMACA-PITOGO-MULANAY-SN NARCISO RD, BARANGAY SAN IGNACIO ILAYA, GENERAL LUNA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱9.1M | 100% | Medium risk54 | —-0.038 |
| 33 | 17DM0049CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS- REHABILITATION /MAJOR REPAIR OF PERMANENT BRIDGE, BAHAY BRIDGE (B03263LZ), BARANGAY VILLA REYES, SAN NARCISO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱10.7M | 100% | Medium risk53 | —-0.037 |
| 34 | 21EA0029NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-SECONDARY ROADS, MARINDUQUE CIRCUMFERENTIAL RD- K0084+000-K0086+000 | Region IV-B | Marinduque DEO | Completed | ₱95.1M | 100% | Medium risk53 | —-0.080 |
| 35 | 22EA0178CONSTRUCTION OF MANIWAYA CIRCUMFERENTIAL ROAD, STA. CRUZ, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱97M | 100% | Medium risk53 | —-0.076 |
| 36 | 22EA0208NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS, DR. DAMIAN REYES MEMORIAL ROAD, (PHASE 2), BOAC, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱96.5M | 100% | Medium risk52 | —-0.077 |
| 37 | 22EA0207NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS, DR. DAMIAN REYES MEMORIAL ROAD, (PHASE I), BOAC, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱96.5M | 100% | Medium risk52 | —-0.078 |
| 38 | 24EA0071REHABILITATION OF TAMAYO-MORALES-ALOBO ROAD, STA. CRUZ, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱96.5M | 100% | Medium risk52 | —-0.079 |
| 39 | 18DL0361CONSTRUCTION OF TECHNOLOGY & LIVELIHOOD EDUCATION INNOVATION BUILDING, PHILIPPINES NORMAL UNIVERSITY SOUTH LUZON, MAÑAGO EXTENSION, BRGY. MAGSAYSAY, LOPEZ, QUEZON (PHASE III) | Region IV-A | Quezon 4th DEO | Completed | ₱58.7M | 100% | Medium risk52 | —-0.043 |
| 40 | 24DK0015CSSP - CONST./ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - JCT MSR CALUMPANG - TAYABAS ROAD LEADING TO MINOR BASILICA OF ST. MICHAEL DE ARCHANGEL, AND KAMAY NI HESUS, TAYABAS, QUEZON | Region IV-A | Quezon 1st DEO | On-Going | ₱53.1M | 97% | Medium risk52 | —-0.064 |
| 41 | 18DK0022NETWORK DEVELOPMENT ROAD WIDENING SECONDARY ROADS (P00201321LZ) LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT ROAD, K0131+190-K0133+000, K0131+190-K0132+000, K0132+000-K0133+000 | Region IV-A | Quezon 1st DEO | Completed | ₱51M | 100% | Medium risk51 | —-0.104 |
| 42 | 25DK0042CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SAMPALOC BY-PASS ROAD, QUEZON | Region IV-A | Quezon 1st DEO | On-Going | ₱47.3M | 51% | Medium risk51 | —-0.062 |
| 43 | 22DK0173ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - MAUBAN-TIGNOAN ROAD, REAL SECTION, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.104 |
| 44 | 23DK0021ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - MAUBAN - TIGNOAN ROAD (MAUBAN SIDE), QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.104 |
| 45 | 18DK0044NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS NEW ROAD MAUBAN-TIGNOAN ROAD (MAUBAN SIDE) MAUBAN, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.104 |
| 46 | 22DK0140ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - JCT. DAANG MAHARLIKA - TAYABAS BY-PASS ROAD AND QUEZON ECO-TOURISM ROAD EXTENSION, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.105 |
| 47 | 20DK0053NETWORK DEVELOPMENT-CONSTRUCTION OF BYPASS AND DIVERSION, LUCBAN BYPASS ROAD (PACKAGE A) QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.106 |
| 48 | 20DK0073NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINK/NEW ROADS, MAUBAN-TIGNOAN ROAD, REAL SECTION-QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.104 |
| 49 | 24DK0028OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF AGOS RIS WATER MANAGEMENT FLOOD CONTROL PROJECT OF AGOS RIVER, GEN. NAKAR, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱51.5M | 100% | Medium risk50 | —-0.086 |
| 50 | 23DK0012ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PAGBILAO - TAYABAS - LUCBAN DIVERSION ROAD (TAYABAS SIDE), QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.106 |