Contractor dossier
474 projects on file, including joint ventures this contractor is part of.
Total projects
474
Total budget
₱11.2B
Average progress
97.4%
Completion rate
83.8%
Average risk score
45.1
Medium risk on average, out of 100
Flagged as unusual
44
9.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 474 | ₱11.2B | 45.1 | 44 | 97.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 203 | ₱2.7B | 40.3 | 6 | 98.3% |
| Buildings and Facilities | 98 | ₱910.4M | 37.7 | 1 | 99.4% |
| Flood Control and Drainage | 75 | ₱3.7B | 48.4 | 0 | 99.9% |
| Bridges | 33 | ₱581.1M | 42.5 | 1 | 99.7% |
| Water Provision and Storage | 24 | ₱179M | 39.2 | 0 | 100.0% |
| OTHER | 17 | ₱1.2B | 75.3 | 14 | 91.1% |
| GAA 2025 SSP | 15 | ₱250.3M | 95.9 | 15 | 69.7% |
| GAA 2025 OO-2 | 7 | ₱753.1M | 93.0 | 5 | 78.0% |
| GAA 2025 OO-1 | 1 | ₱253.5M | 95.1 | 1 | 46.0% |
| Bridges, Roads | 1 | ₱714M | 63.0 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BE0118CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PHASE 4, BARANGAY NGAR | Region II | Isabela 1st DEO | On-Going | ₱43.2M | 38% | High risk96 | Flagged0.027 |
| 25BE0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-REHABILITATION OF ROAD LEADING TO CABAGAN SCIENCE ELEMENTARY SCHOOL, BA | Region II | Isabela 1st DEO | On-Going | ₱29.7M | 87% | High risk96 | Flagged0.012 |
| 25BE0077CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD, BARANGAY PILIG ABAJO, CABAGAN, ISABELA | Region II | Isabela 1st DEO | On-Going | ₱4.8M | 80% | High risk96 | Flagged0.012 |
| 25BE0059CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, MOZZOZZIN ELEMENTARY SCHOOL, BARANGAY MOZZOZZIN SUR, SANTA MARIA, IS | Region II | Isabela 1st DEO | On-Going | ₱9.6M | 53% | High risk96 | Flagged0.023 |
| 25BE0058CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SANTA MARIA CENTRAL ELEMENTARY SCHOOL, BARANGAY POBLACION I, SANTA | Region II | Isabela 1st DEO | On-Going | ₱9.6M | 53% | High risk96 | Flagged0.023 |
| 25BE0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUTURE PROGRAM (BIP)-BIP- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD ALONG BARANGAY BOLINAO-CULALABO (JUNCTION GARDE | Region II | Isabela 1st DEO | On-Going | ₱19.2M | 96% | High risk96 | Flagged0.008 |
| 25BE0057CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY POBLACION, SAN PABLO, ISABELA | Region II | Isabela 1st DEO | On-Going | ₱19.2M | 52% | High risk96 | Flagged0.024 |
| 25BE0068CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SIMANU SUR, SAN PABLO, ISABELA | Region II | Isabela 1st DEO | On-Going | ₱9.6M | 100% | High risk96 | Flagged0.004 |
| 25BE0110CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS- WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SUPPLY SYSTEM AT BARANGAY SAN ROQUE, SANTO TOMAS, ISABELA | Region II | Isabela 1st DEO | On-Going | ₱4.8M | 81% | High risk96 | Flagged0.012 |
| 25BE0096CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUTURE PROGRAM (BIP) - BIP -EVACUATION CENTERS / QUARANTINE FACILITIES / PUBLIC HEALTH FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY POBLACION, SAN PABLO, ISABELA | Region II | Isabela 1st DEO | On-Going | ₱14.4M | 49% | High risk96 | Flagged0.024 |
| 25BE0099CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - EVACUATION CENTERS / QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY CARALUCUD, SAN PABLO, ISABELA | Region II | Isabela 1st DEO | On-Going | ₱14.4M | 67% | High risk96 | Flagged0.020 |
| 25BE0128CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF SLOPE PROTECTION AND CROSS DRAIN ALONG BAGABAG CREEK, STO. TOMAS, ISABE | Region II | Isabela 1st DEO | On-Going | ₱14.4M | 60% | High risk96 | Flagged0.022 |
| 25BE0091CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PHASE 5, BARANGAY MALA | Region II | Isabela 1st DEO | On-Going | ₱38.4M | 50% | High risk96 | Flagged0.024 |
| 25BE0069CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF CONCRETE ROAD AT SI | Region II | Isabela 1st DEO | On-Going | ₱14.3M | 90% | High risk95 | Flagged0.008 |
| 25B00047OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MALALAM BR. (B01121LZ) ALONG MAHARLIKA HIGHWAY | Region II | Region II | On-Going | ₱253.5M | 46% | High risk95 | Flagged0.038 |
| 25BE0109CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SUPPLY SYSTEM AT BARANGAY BALELLENG, SANTO TOMAS, ISABELA | Region II | Isabela 1st DEO | On-Going | ₱4.8M | 90% | High risk94 | Flagged0.008 |
| 25BE0090ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION STRUCTUR | Region II | Isabela 1st DEO | On-Going | ₱93.6M | 42% | High risk93 | Flagged0.011 |
| 25BE0081ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE | Region II | Isabela 1st DEO | On-Going | ₱93.6M | 96% | High risk93 | —-0.000 |
| 25BE0079ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AL | Region II | Isabela 1st DEO | On-Going | ₱93.6M | 93% | High risk93 | —-0.000 |
| 25BE0041ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AL | Region II | Isabela 1st DEO | On-Going | ₱96.5M | 92% | High risk93 | Flagged0.001 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 20B00028ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS ROAD, PACKAGE 2, ISABELA (GOV. DY BRIDGE) | Region II | Region II | On-Going | ₱579.2M | 84% | High risk83 | Flagged0.062 |
| 25BE0130CONCRETING OF RODEO ARENA POBLACION-SITIO ANTAGAN FMR, BRGY. POBLACION AND BRGY. DALENA, SAN PABLO, ISABELA | Region II | Isabela 1st DEO | On-Going | ₱14.5M | 53% | High risk87 | Flagged0.060 |
| 25BE0101CONCRETING OF BRGY. CALANIGAN NORTE FMR, BRGY. CALANIGAN NORTE, STO. TOMAS, ISABELA | Region II | Isabela 1st DEO | On-Going | ₱14.5M | 75% | High risk87 | Flagged0.052 |
| 25BE0100CONCRETING OF SITIO VILLA-SITIO COLUNGUAN FMR, BRGY. BARUMBONG, STO. TOMAS, ISABELA | Region II | Isabela 1st DEO | On-Going | ₱14.5M | 81% | High risk87 | Flagged0.050 |
| 25BE0085CONCRETING OF BRGY. PILIG ALTO FMR, BRGY. PILIG ALTO, CABAGAN, ISABELA | Region II | Isabela 1st DEO | On-Going | ₱19.3M | 89% | High risk87 | Flagged0.048 |
| 25BE0082CONCRETING OF MALASI-SAN ANTONIO FMR, BRGY. SITIO MALASI, BRGY. SAN ANTONIO, CABAGAN, ISABELA | Region II | Isabela 1st DEO | On-Going | ₱14.5M | 85% | High risk88 | Flagged0.047 |
| 25BE0103CONSTRUCTION OF SCHOOL BUILDING, MANGCURAM ELEMENTARY SCHOOL, ILAGAN CITY, ISABELA | Region II | Isabela 1st DEO | On-Going | ₱9.7M | 91% | High risk87 | Flagged0.046 |
| 25BE0083CONCRETING OF BRGY. TALLAG PROPER-SITIO PUNTA FMR, BRGY. TALLAG, CABAGAN, ISABELA | Region II | Isabela 1st DEO | On-Going | ₱29M | 50% | High risk61 | Flagged0.039 |
| 25B00047OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MALALAM BR. (B01121LZ) ALONG MAHARLIKA HIGHWAY | Region II | Region II | On-Going | ₱253.5M | 46% | High risk95 | Flagged0.038 |
| 24B00100CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ILAGAN-DIVILACAN ROAD, IL | Region II | Region II | On-Going | ₱192.8M | 92% | High risk83 | Flagged0.030 |
| 25BE0118CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PHASE 4, BARANGAY NGAR | Region II | Isabela 1st DEO | On-Going | ₱43.2M | 38% | High risk96 | Flagged0.027 |
| 25BE0091CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PHASE 5, BARANGAY MALA | Region II | Isabela 1st DEO | On-Going | ₱38.4M | 50% | High risk96 | Flagged0.024 |
| 25BE0057CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY POBLACION, SAN PABLO, ISABELA | Region II | Isabela 1st DEO | On-Going | ₱19.2M | 52% | High risk96 | Flagged0.024 |
| 25BE0096CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUTURE PROGRAM (BIP) - BIP -EVACUATION CENTERS / QUARANTINE FACILITIES / PUBLIC HEALTH FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY POBLACION, SAN PABLO, ISABELA | Region II | Isabela 1st DEO | On-Going | ₱14.4M | 49% | High risk96 | Flagged0.024 |
| 25BE0059CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, MOZZOZZIN ELEMENTARY SCHOOL, BARANGAY MOZZOZZIN SUR, SANTA MARIA, IS | Region II | Isabela 1st DEO | On-Going | ₱9.6M | 53% | High risk96 | Flagged0.023 |
| 25BE0058CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SANTA MARIA CENTRAL ELEMENTARY SCHOOL, BARANGAY POBLACION I, SANTA | Region II | Isabela 1st DEO | On-Going | ₱9.6M | 53% | High risk96 | Flagged0.023 |
| 25BE0128CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF SLOPE PROTECTION AND CROSS DRAIN ALONG BAGABAG CREEK, STO. TOMAS, ISABE | Region II | Isabela 1st DEO | On-Going | ₱14.4M | 60% | High risk96 | Flagged0.022 |
| 25BE0099CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - EVACUATION CENTERS / QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY CARALUCUD, SAN PABLO, ISABELA | Region II | Isabela 1st DEO | On-Going | ₱14.4M | 67% | High risk96 | Flagged0.020 |
| 19BE0149REPAIR AND MAINTENANCE OF CONCRETE PAVEMENT ALONG ILAGAN-BIGAO-PALANAN ROAD KO420+400-KO420+500 VILLA IMELDA, CITY OF ILAGAN, ISABELA | Region II | Isabela 1st DEO | Completed | ₱18.3M | 100% | High risk82 | Flagged0.020 |
| 19BE0154REPAIR AND MAINTENANCE OF NAGAPPAGAN BRIDGE APPROACH SLOPE PROTECTION CITY OF ILAGAN, ISABELA | Region II | Isabela 1st DEO | Completed | ₱9M | 100% | High risk86 | Flagged0.018 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 276 | 20BE0078CONSTRUCTION OF MARANA-BACULOD BRIDGE RIVER CONTROL ILAGAN CITY, ISABELA | Region II | Isabela 1st DEO | Completed | ₱28.2M | 100% | Medium risk44 | —-0.066 |
| 277 | 24BE0001CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF CONCRETE ROAD, BARANGAY CABISERA 2, CITY OF ILAGAN, ISABE | Region II | Isabela 1st DEO | Completed | ₱14.8M | 100% | Medium risk44 | —-0.081 |
| 278 | 25BE0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD ALONG BARANGAY | Region II | Isabela 1st DEO | Completed | ₱19.8M | 100% | Medium risk44 | —-0.082 |
| 279 | 25BE0004CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY PILAR, ILAGAN CITY, ISABELA | Region II | Isabela 1st DEO | Completed | ₱14.8M | 100% | Medium risk44 | —-0.082 |
| 280 | 20BE0060CONCRETING OF CARIKKIKAN NORTE BARANGAY ROAD, ILAGAN CITY, ISABELA | Region II | Isabela 1st DEO | Completed | ₱18.8M | 100% | Medium risk44 | —-0.082 |
| 281 | 24BE0076ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PASA SMALL RESERVOIR IS SLOPE PROTECTION AT EXISTING | Region II | Isabela 1st DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.065 |
| 282 | 20BE0053CONSTRUCTION OF CONCRETE ROAD INCLUDING SLOPE PROTECTION AT SAN ISIDRO - ANEG DELFIN ALBANO, ISABELA | Region II | Isabela 1st DEO | Completed | ₱14M | 100% | Medium risk44 | —-0.083 |
| 283 | 23BE0056CONSTRUCTION OF ROAD, BARANGAY ANEG, DELFIN ALBANO, ISABELA | Region II | Isabela 1st DEO | Completed | ₱9.9M | 100% | Medium risk44 | —-0.084 |
| 284 | 19BE0022CONSTRUCTION OF FLOOD CONTROL PROJECT CAPO, ILAGAN CITY, ISABELA | Region II | Isabela 1st DEO | Completed | ₱27.9M | 100% | Medium risk44 | —-0.065 |
| 285 | 21BE0060CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY BACULUD ILAGAN CITY, ISABELA | Region II | Isabela 1st DEO | Completed | ₱18.8M | 100% | Medium risk44 | —-0.066 |
| 286 | 22BE0005CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, STA.0+000-STA. 0+780, BRGY. CALIGAYAN (SITE I), TUMAUINI, ISABELA | Region II | Isabela 1st DEO | Completed | ₱39.2M | 100% | Medium risk44 | —-0.066 |
| 287 | 22BE0013CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG ILAGAN RIVER (STA.0+000-STA.0+213), BRGY. CAPO, CITY OF ILAGAN, ISABELA | Region II | Isabela 1st DEO | Completed | ₱44.1M | 100% | Medium risk44 | —-0.066 |
| 288 | 23BE0126BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ILAGAN RIVER, BRGY. CABISERA 4, CITY OF ILAGAN, ISABELA | Region II | Isabela 1st DEO | Completed | ₱29.7M | 100% | Medium risk44 | —-0.066 |
| 289 | 21BE0016CONCRETING OF GUINATAN-STO. TOMAS CIRCUMFERENTIAL ROAD, CITY OF ILAGAN, ISABELA | Region II | Isabela 1st DEO | Completed | ₱14.1M | 100% | Medium risk44 | —-0.083 |
| 290 | 22BE0042CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG CAGAYAN RIVER (STA.0+360-STA.0+472), PHASE II, BARANGAY PILITAN TUMAUINI, ISABELA | Region II | Isabela 1st DEO | Completed | ₱24.3M | 100% | Medium risk44 | —-0.067 |
| 291 | 22BE0006CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG PINACANAUAN RIVER, PHASE II, BARANGAY CALIGAYAN, TUMAUINI, ISABELA | Region II | Isabela 1st DEO | Completed | ₱24.5M | 100% | Medium risk44 | —-0.067 |
| 292 | 25BE0010CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY CAPELLAN, CITY OF ILAGAN, ISABELA | Region II | Isabela 1st DEO | Completed | ₱9.9M | 100% | Medium risk44 | —-0.080 |
| 293 | 25BE0002CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY SAN RODRIGO, CITY OF ILAGAN, ISABELA | Region II | Isabela 1st DEO | Completed | ₱9.9M | 100% | Medium risk44 | —-0.081 |
| 294 | 23BE0150CONSTRUCTION OF 2STY4CL, TUMAUINI STAND-ALONE SENIOR HIGH SCHOOL, TUMAUINI, ISABELA | Region II | Isabela 1st DEO | Completed | ₱14.7M | 100% | Medium risk44 | —-0.039 |
| 295 | 25BE0052CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF ROAD, BRGY. CABANNUNGAN 2ND, ILAGAN CITY, | Region II | Isabela 1st DEO | On-Going | ₱9.9M | 93% | Medium risk44 | —-0.057 |
| 296 | 20BE0024ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-ILAGAN- DELFIN ALBANO-MALLIG RD., DELFIN ALBANO, ISABELA, KO425+221-KO426+800 | Region II | Isabela 1st DEO | Completed | ₱10.4M | 100% | Medium risk44 | —-0.082 |
| 297 | 20BE0018ACCESS ROAD LEADING TO ABUAN RIVER-BASE ECO-TOURISM SINDON BAYABO, ILAGAN CITY, ISABELA, STA. 1+200-1+461, STA. 2+020-2+424 | Region II | Isabela 1st DEO | Completed | ₱14M | 100% | Medium risk44 | —-0.083 |
| 298 | 18BE0140CONSTRUCTION OF TWO STOREY (8 CLASSROOMS) SCHOOL BUILDING SAN ANTONIO NATIONAL AGRO-INDL. & VOCATIONAL HIGH SCHOOL, ILAGAN CITY (CAPITAL), ISABELA | Region II | Isabela 1st DEO | Completed | ₱22.2M | 100% | Medium risk44 | —-0.037 |
| 299 | 24BE0045CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR /STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF ROAD, BARANGAY ARUS | Region II | Isabela 1st DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.079 |
| 300 | 23BE0054CONSTRUCTION OF ROAD, BARANGAY UNION, CABAGAN, ISABELA | Region II | Isabela 1st DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.079 |