Opening the dossier…
Opening the dossier…
Contractor dossier
88 projects on file, including joint ventures this contractor is part of.
Total projects
88
Total budget
₱7.1B
Average progress
89.2%
Completion rate
61.4%
Below 70%
Average risk score
56.2
Medium risk on average, out of 100
Flagged as unusual
14
15.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 88 | ₱7.1B | 56.2 | 14 | 89.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 40 | ₱3.5B | 56.0 | 6 | 82.7% |
| Flood Control and Drainage | 37 | ₱2.7B | 52.7 | 3 | 95.6% |
| Bridges | 5 | ₱199.2M | 48.4 | 0 | 100.0% |
| GAA 2025 OO-1 | 3 | ₱328.2M | 94.1 | 3 | 76.4% |
| Bridges, Roads | 2 | ₱261.1M | 67.5 | 1 | 97.7% |
| GAA 2025 OO-2 | 1 | ₱94.9M | 93.6 | 1 | 80.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25L00053PREVENTIVE MAINTENANCE OF ROAD - ASPHALT OVERLAY DIGOS - MAKAR ROAD - K1574+000 - K1575+425, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱94.1M | 90% | High risk94 | Flagged0.010 |
| 25L00061PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DIGOS - MAKAR RD. - K1575 + 425 - K1576 + 900, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.5M | 100% | High risk94 | Flagged0.004 |
| 25L00002PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAANG MAHARLIKA, DAVAO DE ORO K1382+337 - K1383+942, MONKAYO DAVAO DE ORO | Region XI | Region XI | On-Going | ₱140.6M | 39% | High risk94 | Flagged0.040 |
| 25LF0139CONSTRUCTION OF FLOOD MITIGATION STRUCTURE PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL RD (TAYTAYAN SECTION), CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱94.9M | 80% | High risk94 | Flagged0.006 |
| 18L00142IMPVT./CONC. OF JCT. DAVAO-BUKIDNON ROAD (CALINAN SECT.)-WANGAN-SUBASTA-TAGAKPAN-TUNGKALAN-TAGURANO- | Region XI | Region XI | On-Going | ₱164.6M | 95% | High risk69 | Flagged0.016 |
| 25L00041PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY (DAVAO CITY - JCT DIGOS SECT) - K1537+200 - K1538+391, K1538+985 - K1540+123, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱140.3M | 41% | High risk66 | —-0.024 |
| 25L00040PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY (DAVAO CITY - JCT. DIGOS SECT) - K1540+123 - K1541+163, K1541+767 - K1542+838, K1542+941 - K1543+130, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱140.3M | 41% | High risk66 | —-0.024 |
| 18LH0062IMPROVEMENT/CONCRETING OF JCT. CALINAN-BAGUIO-CADALIAN ROAD (BAGUIO PROPER-WINES-MAGPET BOUNDARY), DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱96.5M | 100% | High risk66 | —-0.059 |
| 18L00065WIDENING (2 INTO 4 LANES) OF BYPASS RD AT JCT. DAANG MAHARLIKA-LICANAN-BUNAWAN-MAHAYAG-INDANGAN-CABA | Region XI | Region XI | On-Going | ₱222.1M | 99% | High risk66 | Flagged0.015 |
| 20L00032RECONSTRUCTION TO CONCRETE PAVEMENT - JCT. R MAGSAYSAY AVE. - L. MA. GUERRERO ST. - GUZMAN ST. - VINZON ST. - T. PALMA GIL ST. - JCT. DACUDAO - JCT. J.P. CABAGUIO AVE., DAVAO CITY | Region XI | Region XI | On-Going | ₱214.5M | 91% | High risk66 | Flagged0.017 |
| 18L00077CONCRETING OF MONKAYO-COMPOSTELA ROAD, PACKAGE B, INCLUDING ROW, COMPOSTELA VALLEY | Region XI | Region XI | Completed | ₱223.2M | 100% | High risk65 | —-0.030 |
| 22L00080CONSTRUCTION OF DIGOS RIVER FLOOD CONTROL PROJECT, BRGY. RUPARAN (SECTION 2), DIGOS CITY, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱173.2M | 95% | High risk65 | Flagged0.010 |
| 20L00044CONSTRUCTION OF CONCRETE ROAD-FATIMA-MALABOG ROAD (MALABOG-GUMITAN), PACKAGE D, DAVAO CITY | Region XI | Region XI | On-Going | ₱144.3M | 86% | High risk65 | —-0.000 |
| 22L00134ROAD WIDENING AT SPECIFIC LOCATIONS ALONG SURIGAO - DAVAO COASTAL RD. (S01376MN), K1795+185 - K1804+334, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱170.8M | 78% | High risk65 | Flagged0.003 |
| 18L00018WIDENING (2 INTO 4 LANES) OF DAVAO-BUKIDNON RD INCLUDING SLOPE PROTECTION & ROW (BRGY. MARILOG SECT. | Region XI | Region XI | Completed | ₱148M | 100% | High risk65 | —-0.062 |
| 25LF0134CONSTRUCTION OF NASIPIT FLOOD CONTROL TARRAGONA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱146.3M | 61% | High risk64 | Flagged0.002 |
| 18L00001REHAB./RECONST. OF DAMAGED PAVED RD ALONG DVO.-COT. RD.,(DAVAO CITY-JCT. DIGOS SECT.),ZONE III-TAGAB | Region XI | Region XI | Completed | ₱180.4M | 100% | High risk64 | —-0.056 |
| 18L00193CONSTRUCTION OF CONCRETE REVETMENT ON STEEL SHEET PILES ALONG TAGUM - LIBUGANON RIVER, DOWNSTREAM/UPSTREAM MIRANDA BRIDGE II INCLUDING ROW, TAGUM CITY, DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱136.7M | 100% | High risk63 | —-0.045 |
| 18L00056CONC. OF NRJ SURIGAO-DAVAO COASTAL RD TO HIJO CADASTRAL CONNECTING TAGUM CITY OVERLAND TRANSPORT TER | Region XI | Region XI | Completed | ₱131.4M | 100% | High risk63 | —-0.041 |
| 21L00088CONSTRUCTION OF CONCRETE ROAD - TALIKUD CIRCUMFERENTIAL ROAD, IGACOS, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱95.5M | 50% | High risk63 | Flagged0.002 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25L00002PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAANG MAHARLIKA, DAVAO DE ORO K1382+337 - K1383+942, MONKAYO DAVAO DE ORO | Region XI | Region XI | On-Going | ₱140.6M | 39% | High risk94 | Flagged0.040 |
| 20L00032RECONSTRUCTION TO CONCRETE PAVEMENT - JCT. R MAGSAYSAY AVE. - L. MA. GUERRERO ST. - GUZMAN ST. - VINZON ST. - T. PALMA GIL ST. - JCT. DACUDAO - JCT. J.P. CABAGUIO AVE., DAVAO CITY | Region XI | Region XI | On-Going | ₱214.5M | 91% | High risk66 | Flagged0.017 |
| 18L00142IMPVT./CONC. OF JCT. DAVAO-BUKIDNON ROAD (CALINAN SECT.)-WANGAN-SUBASTA-TAGAKPAN-TUNGKALAN-TAGURANO- | Region XI | Region XI | On-Going | ₱164.6M | 95% | High risk69 | Flagged0.016 |
| 18L00065WIDENING (2 INTO 4 LANES) OF BYPASS RD AT JCT. DAANG MAHARLIKA-LICANAN-BUNAWAN-MAHAYAG-INDANGAN-CABA | Region XI | Region XI | On-Going | ₱222.1M | 99% | High risk66 | Flagged0.015 |
| 22L00080CONSTRUCTION OF DIGOS RIVER FLOOD CONTROL PROJECT, BRGY. RUPARAN (SECTION 2), DIGOS CITY, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱173.2M | 95% | High risk65 | Flagged0.010 |
| 25L00053PREVENTIVE MAINTENANCE OF ROAD - ASPHALT OVERLAY DIGOS - MAKAR ROAD - K1574+000 - K1575+425, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱94.1M | 90% | High risk94 | Flagged0.010 |
| 25LF0139CONSTRUCTION OF FLOOD MITIGATION STRUCTURE PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL RD (TAYTAYAN SECTION), CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱94.9M | 80% | High risk94 | Flagged0.006 |
| 25L00061PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DIGOS - MAKAR RD. - K1575 + 425 - K1576 + 900, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.5M | 100% | High risk94 | Flagged0.004 |
| 22L00134ROAD WIDENING AT SPECIFIC LOCATIONS ALONG SURIGAO - DAVAO COASTAL RD. (S01376MN), K1795+185 - K1804+334, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱170.8M | 78% | High risk65 | Flagged0.003 |
| 22L00018CONSTRUCTION OF GRAVEL ROAD - BYPASS ROAD AT JCT. DAVAO CITY DIVERSION ROAD - TIGATTO ROAD - JCT. DAVAO CITY DIVERSION ROAD, DAVAO CITY | Region XI | Region XI | On-Going | ₱63.6M | 12% | Medium risk55 | Flagged0.003 |
| 18L00135JCT. DAVAO CITY DIVERSION ROAD-CABANTIAN ROAD (BANCO EXTENSION ROAD), INCL. ROW, DAVAO CITY | Region XI | Region XI | On-Going | ₱39.7M | 36% | Medium risk47 | Flagged0.003 |
| 25LF0134CONSTRUCTION OF NASIPIT FLOOD CONTROL TARRAGONA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱146.3M | 61% | High risk64 | Flagged0.002 |
| 21L00088CONSTRUCTION OF CONCRETE ROAD - TALIKUD CIRCUMFERENTIAL ROAD, IGACOS, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱95.5M | 50% | High risk63 | Flagged0.002 |
| 21LB0116CONSTRUCTION OF FLOOD MITIGATION FACILITY - STA. MARINA SECTION, BRGY. TIGATTO, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱93.6M | 92% | High risk62 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25L00053PREVENTIVE MAINTENANCE OF ROAD - ASPHALT OVERLAY DIGOS - MAKAR ROAD - K1574+000 - K1575+425, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱94.1M | 90% | High risk94 | Flagged0.010 |
| 2 | 25L00061PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DIGOS - MAKAR RD. - K1575 + 425 - K1576 + 900, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.5M | 100% | High risk94 | Flagged0.004 |
| 3 | 25L00002PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAANG MAHARLIKA, DAVAO DE ORO K1382+337 - K1383+942, MONKAYO DAVAO DE ORO | Region XI | Region XI | On-Going | ₱140.6M | 39% | High risk94 | Flagged0.040 |
| 4 | 25LF0139CONSTRUCTION OF FLOOD MITIGATION STRUCTURE PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL RD (TAYTAYAN SECTION), CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱94.9M | 80% | High risk94 | Flagged0.006 |
| 5 | 18L00142IMPVT./CONC. OF JCT. DAVAO-BUKIDNON ROAD (CALINAN SECT.)-WANGAN-SUBASTA-TAGAKPAN-TUNGKALAN-TAGURANO- | Region XI | Region XI | On-Going | ₱164.6M | 95% | High risk69 | Flagged0.016 |
| 6 | 25L00041PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY (DAVAO CITY - JCT DIGOS SECT) - K1537+200 - K1538+391, K1538+985 - K1540+123, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱140.3M | 41% | High risk66 | —-0.024 |
| 7 | 25L00040PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY (DAVAO CITY - JCT. DIGOS SECT) - K1540+123 - K1541+163, K1541+767 - K1542+838, K1542+941 - K1543+130, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱140.3M | 41% | High risk66 | —-0.024 |
| 8 | 18LH0062IMPROVEMENT/CONCRETING OF JCT. CALINAN-BAGUIO-CADALIAN ROAD (BAGUIO PROPER-WINES-MAGPET BOUNDARY), DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱96.5M | 100% | High risk66 | —-0.059 |
| 9 | 18L00065WIDENING (2 INTO 4 LANES) OF BYPASS RD AT JCT. DAANG MAHARLIKA-LICANAN-BUNAWAN-MAHAYAG-INDANGAN-CABA | Region XI | Region XI | On-Going | ₱222.1M | 99% | High risk66 | Flagged0.015 |
| 10 | 20L00032RECONSTRUCTION TO CONCRETE PAVEMENT - JCT. R MAGSAYSAY AVE. - L. MA. GUERRERO ST. - GUZMAN ST. - VINZON ST. - T. PALMA GIL ST. - JCT. DACUDAO - JCT. J.P. CABAGUIO AVE., DAVAO CITY | Region XI | Region XI | On-Going | ₱214.5M | 91% | High risk66 | Flagged0.017 |
| 11 | 18L00077CONCRETING OF MONKAYO-COMPOSTELA ROAD, PACKAGE B, INCLUDING ROW, COMPOSTELA VALLEY | Region XI | Region XI | Completed | ₱223.2M | 100% | High risk65 | —-0.030 |
| 12 | 22L00080CONSTRUCTION OF DIGOS RIVER FLOOD CONTROL PROJECT, BRGY. RUPARAN (SECTION 2), DIGOS CITY, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱173.2M | 95% | High risk65 | Flagged0.010 |
| 13 | 20L00044CONSTRUCTION OF CONCRETE ROAD-FATIMA-MALABOG ROAD (MALABOG-GUMITAN), PACKAGE D, DAVAO CITY | Region XI | Region XI | On-Going | ₱144.3M | 86% | High risk65 | —-0.000 |
| 14 | 22L00134ROAD WIDENING AT SPECIFIC LOCATIONS ALONG SURIGAO - DAVAO COASTAL RD. (S01376MN), K1795+185 - K1804+334, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱170.8M | 78% | High risk65 | Flagged0.003 |
| 15 | 18L00018WIDENING (2 INTO 4 LANES) OF DAVAO-BUKIDNON RD INCLUDING SLOPE PROTECTION & ROW (BRGY. MARILOG SECT. | Region XI | Region XI | Completed | ₱148M | 100% | High risk65 | —-0.062 |
| 16 | 25LF0134CONSTRUCTION OF NASIPIT FLOOD CONTROL TARRAGONA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱146.3M | 61% | High risk64 | Flagged0.002 |
| 17 | 18L00001REHAB./RECONST. OF DAMAGED PAVED RD ALONG DVO.-COT. RD.,(DAVAO CITY-JCT. DIGOS SECT.),ZONE III-TAGAB | Region XI | Region XI | Completed | ₱180.4M | 100% | High risk64 | —-0.056 |
| 18 | 18L00193CONSTRUCTION OF CONCRETE REVETMENT ON STEEL SHEET PILES ALONG TAGUM - LIBUGANON RIVER, DOWNSTREAM/UPSTREAM MIRANDA BRIDGE II INCLUDING ROW, TAGUM CITY, DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱136.7M | 100% | High risk63 | —-0.045 |
| 19 | 18L00056CONC. OF NRJ SURIGAO-DAVAO COASTAL RD TO HIJO CADASTRAL CONNECTING TAGUM CITY OVERLAND TRANSPORT TER | Region XI | Region XI | Completed | ₱131.4M | 100% | High risk63 | —-0.041 |
| 20 | 21L00088CONSTRUCTION OF CONCRETE ROAD - TALIKUD CIRCUMFERENTIAL ROAD, IGACOS, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱95.5M | 50% | High risk63 | Flagged0.002 |
| 21 | 25LK0008CONSTRUCTION OF REVETMENT ALONG ILANG CREEK, ILANG BRIDGE UPSTREAM, LEFT BANK, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱95.1M | 29% | High risk63 | —-0.008 |
| 22 | 21L00087CONSTRUCTION OF CONCRETE ROAD - ISLAND GARDEN CITY OF SAMAL (IGACOS) CIRCUMFERENTIAL ROAD, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱95.3M | 96% | High risk62 | —-0.009 |
| 23 | 21LB0116CONSTRUCTION OF FLOOD MITIGATION FACILITY - STA. MARINA SECTION, BRGY. TIGATTO, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱93.6M | 92% | High risk62 | Flagged0.001 |
| 24 | 22LH0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT LIPADAS RIVER, LIZADA SECTION, BRGY. LIZADA, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱93.4M | 100% | High risk62 | —-0.061 |
| 25 | 24LG0061CONSTRUCTION OF DRAINAGE STRUCTURE, SITIO DALSA, BRGY. POBLACION, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱97.5M | 100% | High risk62 | —-0.022 |