Contractor dossier
138 projects on file, including joint ventures this contractor is part of.
Total projects
138
Total budget
₱7.9B
Average progress
94.4%
Completion rate
85.5%
Average risk score
61.5
High risk on average, out of 100
Flagged as unusual
9
6.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 127 | ₱7.8B | 62.8 | 9 | 93.9% |
| Region VIII | 11 | ₱125.4M | 46.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 40 | ₱2.9B | 61.1 | 0 | 95.0% |
| Buildings and Facilities | 33 | ₱1.1B | 56.9 | 1 | 96.4% |
| Flood Control and Drainage | 25 | ₱1.8B | 61.1 | 1 | 100.0% |
| Bridges | 24 | ₱1.1B | 58.8 | 3 | 93.5% |
| OTHER | 10 | ₱766.6M | 73.8 | 1 | 99.6% |
| GAA 2025 SSP | 2 | ₱108.1M | 95.4 | 2 | 5.1% |
| GAA 2025 OO-1 | 2 | ₱45.9M | 93.1 | 1 | 50.7% |
| Bridges, Roads | 2 | ₱117.2M | 55.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25FO0087CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TALISAY RIVER FLOOD MITIGATION STRUCTURE, BRGY SAN JUAN AND BRGY PISTOLA, | Region V | Albay 3rd DEO | On-Going | ₱96.6M | 0% | High risk96 | Flagged0.034 |
| 25FA0038CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) CONVERTIBLE TO EVACUATION CENTER AT BARANGAY BONGABONG, TABACO CITY, ALBAY | Region V | Albay 1st DEO | On-Going | ₱11.5M | 10% | High risk95 | Flagged0.024 |
| 25F00498ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES - ASLONG BR. (B00383LZ) ALONG MAHARLIKA HIGHWAY, LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱36.4M | 8% | High risk93 | Flagged0.015 |
| 25F00156ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-UGUIS BR. (B00384LZ) ALONG MAHARLIKA HIGHWAY, LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱9.5M | 93% | High risk93 | —-0.012 |
| 16F00080MFO3-MAINT. & CONST. SERVICES OF OTHER INFRASTRUCTURE: CONST./IMPV'T. OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS, CAGRARAY CIRCUMFERENTIAL ROAD(MISIBIS-CAGBULACAO-CAGRARAY-PIGCOBOHAN-TAMBILAGAO SECTION)LEADING TO MISIB | Region V | Region V | Completed | ₱193M | 100% | High risk82 | Flagged0.004 |
| 23FA0034CLUSTER 6- CONST./EXTENSION/REHAB. OF SAN LORENZO SEAWALL (PHASE 3), TABACO CITY, ALBAY; PANARAYON RIVER CONTROL, BACACAY, ALBAY AND BAYBAY SEAWALL, MALINAO, ALBAY | Region V | Albay 1st DEO | Completed | ₱118.7M | 100% | High risk81 | —-0.023 |
| 17F00004CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS: CUMADCAD-MACALAYA PORT ROAD, CASTILLA, SORSOGON 1ST LD | Region V | Region V | Completed | ₱134.8M | 100% | High risk81 | —-0.014 |
| 19F00095REHABILITATION/RESTORATION OF MATANAG FLOOD CONTROL (DOWNSTREAM OF SPILLWAY), MATANAG, LEGAZPI CITY, ALBAY, ALBAY 2ND LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱120.6M | 100% | High risk80 | —-0.014 |
| 20FA0080CLUSTER 51-CONSTRUCTION OF SEAWALL AND FLOOD MITIGATION AT TIWI AND BACACAY, ALBAY | Region V | Albay 1st DEO | Completed | ₱57.1M | 100% | High risk79 | —-0.033 |
| 21FA0023CLUSTER 11-CONSTRUCTION OF ROADS AND BY-PASS ROADS AT TIWI AND MALILIPOT, ALBAY | Region V | Albay 1st DEO | Completed | ₱66.8M | 100% | High risk79 | —-0.033 |
| 17F00039REHAB./RECONST. OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SAN PASCUAL-CLAVERIA ROAD, K0005+000-K0043+702 WITH EXCEPTIONS, BURIAS ISLAND, MASBATE | Region V | Region V | Completed | ₱76.7M | 100% | High risk78 | —-0.027 |
| 21FA0042CLUSTER 20- CONST./EXT. OF FLOOD MITIGATION/RIVER CONTROL AT PANARAYON RIVER, BACACAY, ALBAY AND CONSTRUCTION OF SEAWALL AT THE ISLAND BARANGAY OF NAHAPUNAN, BACACAY, ALBAY | Region V | Albay 1st DEO | Completed | ₱24.6M | 100% | High risk77 | —-0.036 |
| 24FN0070OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE PROGRAM RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - CRESINE BR. (B00466LZ) ALONG IRIGA CITY-MASOLI RD | Region V | Camarines Sur 5th DEO | On-Going | ₱6.7M | 96% | High risk76 | —-0.010 |
| 17FA0060CLUSTER 33 REHAB./RECONSTRUCTION OF FLOOD CONTROL PROJECTS DAMAGED BY TYPHOON NINA AND SUPER TYPHOON LAWIN AT BUANG,TABACO CITY AND STA. CRUZ, MALILIPOT,ALBAY | Region V | Albay 1st DEO | Completed | ₱91.7M | 100% | High risk71 | Flagged0.007 |
| 20FO0093CONSTRUCTION/EXPANSION/REHABILITATION OF PUBLIC MARKETS/FARMERS MARKETS (BAGSAKAN CENTERS) AND PUBLIC CEMENTERIES IN THE 3RD DISTRICT OF ALBAY (13 SITES) | Region V | Albay 3rd DEO | Completed | ₱95.6M | 100% | High risk70 | —-0.031 |
| 24F00124ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING L;INKS/NEW ROADS-PASACAO-BALATAN TOURISM COASTAL HIGHWAY (PASACAO-MINALABAC SECTION), CAMARINES SUR, PASACAO AND SAN FERNANDO, CAMA | Region V | Region V | On-Going | ₱234M | 73% | High risk70 | —-0.030 |
| 24FA0015CONSTRUCTION OF SEAWALL BARANGAY 3, MALILIPOT, ALBAY | Region V | Albay 1st DEO | Completed | ₱109M | 100% | High risk69 | —-0.073 |
| 19FA0076CLUSTER 40 -REHAB./RECONST. OF BULAWAN RIVER CONTROL (SAN JOSE & SAN ROQUE SECTION), MALILIPOT, ALBAY | Region V | Albay 1st DEO | Completed | ₱88.9M | 100% | High risk69 | —-0.021 |
| 20FA0004CLUSTER 4- CONSTRUCTION/EXTENSION OF CAJUGOTAN SEAWALL & SAN PEDRO SEAWALL, BACACAY, ALBAY AND BINITAYAN, SEAWALL, MALILIPOT, ALBAY | Region V | Albay 1st DEO | Completed | ₱97.6M | 100% | High risk69 | —-0.075 |
| 20FA0043CONSTRUCTION/IMPV'T. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION: CAGRARAY CIRCUMFERENTIAL ROAD, BACACAY, ALBAY | Region V | Albay 1st DEO | Completed | ₱144.8M | 100% | High risk69 | —-0.080 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19F00099PROPOSED CONSTRUCTION/RENOVATION OF VARIOUS NEDA FACILITIES, ARIMBAY, LEGAZPI CITY | Region V | Region V | On-Going | ₱40.4M | 0% | Medium risk51 | Flagged0.069 |
| 19FB0265CONSTRUCTION OF BRIDGE AT BARANGAY 15, ILAWOD EAST TO SITIO GUYAM BRGY. 57 TAYSAN, ALBAY, LEGAZPI CITY | Region V | Albay 2nd DEO | On-Going | ₱48.2M | 91% | High risk64 | Flagged0.039 |
| 25FO0087CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TALISAY RIVER FLOOD MITIGATION STRUCTURE, BRGY SAN JUAN AND BRGY PISTOLA, | Region V | Albay 3rd DEO | On-Going | ₱96.6M | 0% | High risk96 | Flagged0.034 |
| 25FA0038CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) CONVERTIBLE TO EVACUATION CENTER AT BARANGAY BONGABONG, TABACO CITY, ALBAY | Region V | Albay 1st DEO | On-Going | ₱11.5M | 10% | High risk95 | Flagged0.024 |
| 25F00498ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES - ASLONG BR. (B00383LZ) ALONG MAHARLIKA HIGHWAY, LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱36.4M | 8% | High risk93 | Flagged0.015 |
| 25F00250ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES-VIADUCT ALONG MAHARLIKA HIGHWAY, CAMARINES SUR (PACKAGE 2), LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱31.3M | 0% | High risk63 | Flagged0.011 |
| 17FA0060CLUSTER 33 REHAB./RECONSTRUCTION OF FLOOD CONTROL PROJECTS DAMAGED BY TYPHOON NINA AND SUPER TYPHOON LAWIN AT BUANG,TABACO CITY AND STA. CRUZ, MALILIPOT,ALBAY | Region V | Albay 1st DEO | Completed | ₱91.7M | 100% | High risk71 | Flagged0.007 |
| 20F00007OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES-TALINGA BRIDGE (B00269LZ) ALONG DAANG MAHARLIKA (LZ), JUBAN, SORSOGON 2ND LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱53.1M | 75% | High risk60 | Flagged0.004 |
| 16F00080MFO3-MAINT. & CONST. SERVICES OF OTHER INFRASTRUCTURE: CONST./IMPV'T. OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS, CAGRARAY CIRCUMFERENTIAL ROAD(MISIBIS-CAGBULACAO-CAGRARAY-PIGCOBOHAN-TAMBILAGAO SECTION)LEADING TO MISIB | Region V | Region V | Completed | ₱193M | 100% | High risk82 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25FO0087CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TALISAY RIVER FLOOD MITIGATION STRUCTURE, BRGY SAN JUAN AND BRGY PISTOLA, | Region V | Albay 3rd DEO | On-Going | ₱96.6M | 0% | High risk96 | Flagged0.034 |
| 2 | 25FA0038CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) CONVERTIBLE TO EVACUATION CENTER AT BARANGAY BONGABONG, TABACO CITY, ALBAY | Region V | Albay 1st DEO | On-Going | ₱11.5M | 10% | High risk95 | Flagged0.024 |
| 3 | 25F00498ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES - ASLONG BR. (B00383LZ) ALONG MAHARLIKA HIGHWAY, LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱36.4M | 8% | High risk93 | Flagged0.015 |
| 4 | 25F00156ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-UGUIS BR. (B00384LZ) ALONG MAHARLIKA HIGHWAY, LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱9.5M | 93% | High risk93 | —-0.012 |
| 5 | 16F00080MFO3-MAINT. & CONST. SERVICES OF OTHER INFRASTRUCTURE: CONST./IMPV'T. OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS, CAGRARAY CIRCUMFERENTIAL ROAD(MISIBIS-CAGBULACAO-CAGRARAY-PIGCOBOHAN-TAMBILAGAO SECTION)LEADING TO MISIB | Region V | Region V | Completed | ₱193M | 100% | High risk82 | Flagged0.004 |
| 6 | 23FA0034CLUSTER 6- CONST./EXTENSION/REHAB. OF SAN LORENZO SEAWALL (PHASE 3), TABACO CITY, ALBAY; PANARAYON RIVER CONTROL, BACACAY, ALBAY AND BAYBAY SEAWALL, MALINAO, ALBAY | Region V | Albay 1st DEO | Completed | ₱118.7M | 100% | High risk81 | —-0.023 |
| 7 | 17F00004CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS: CUMADCAD-MACALAYA PORT ROAD, CASTILLA, SORSOGON 1ST LD | Region V | Region V | Completed | ₱134.8M | 100% | High risk81 | —-0.014 |
| 8 | 19F00095REHABILITATION/RESTORATION OF MATANAG FLOOD CONTROL (DOWNSTREAM OF SPILLWAY), MATANAG, LEGAZPI CITY, ALBAY, ALBAY 2ND LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱120.6M | 100% | High risk80 | —-0.014 |
| 9 | 20FA0080CLUSTER 51-CONSTRUCTION OF SEAWALL AND FLOOD MITIGATION AT TIWI AND BACACAY, ALBAY | Region V | Albay 1st DEO | Completed | ₱57.1M | 100% | High risk79 | —-0.033 |
| 10 | 21FA0023CLUSTER 11-CONSTRUCTION OF ROADS AND BY-PASS ROADS AT TIWI AND MALILIPOT, ALBAY | Region V | Albay 1st DEO | Completed | ₱66.8M | 100% | High risk79 | —-0.033 |
| 11 | 17F00039REHAB./RECONST. OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SAN PASCUAL-CLAVERIA ROAD, K0005+000-K0043+702 WITH EXCEPTIONS, BURIAS ISLAND, MASBATE | Region V | Region V | Completed | ₱76.7M | 100% | High risk78 | —-0.027 |
| 12 | 21FA0042CLUSTER 20- CONST./EXT. OF FLOOD MITIGATION/RIVER CONTROL AT PANARAYON RIVER, BACACAY, ALBAY AND CONSTRUCTION OF SEAWALL AT THE ISLAND BARANGAY OF NAHAPUNAN, BACACAY, ALBAY | Region V | Albay 1st DEO | Completed | ₱24.6M | 100% | High risk77 | —-0.036 |
| 13 | 24FN0070OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE PROGRAM RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - CRESINE BR. (B00466LZ) ALONG IRIGA CITY-MASOLI RD | Region V | Camarines Sur 5th DEO | On-Going | ₱6.7M | 96% | High risk76 | —-0.010 |
| 14 | 17FA0060CLUSTER 33 REHAB./RECONSTRUCTION OF FLOOD CONTROL PROJECTS DAMAGED BY TYPHOON NINA AND SUPER TYPHOON LAWIN AT BUANG,TABACO CITY AND STA. CRUZ, MALILIPOT,ALBAY | Region V | Albay 1st DEO | Completed | ₱91.7M | 100% | High risk71 | Flagged0.007 |
| 15 | 20FO0093CONSTRUCTION/EXPANSION/REHABILITATION OF PUBLIC MARKETS/FARMERS MARKETS (BAGSAKAN CENTERS) AND PUBLIC CEMENTERIES IN THE 3RD DISTRICT OF ALBAY (13 SITES) | Region V | Albay 3rd DEO | Completed | ₱95.6M | 100% | High risk70 | —-0.031 |
| 16 | 24F00124ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING L;INKS/NEW ROADS-PASACAO-BALATAN TOURISM COASTAL HIGHWAY (PASACAO-MINALABAC SECTION), CAMARINES SUR, PASACAO AND SAN FERNANDO, CAMA | Region V | Region V | On-Going | ₱234M | 73% | High risk70 | —-0.030 |
| 17 | 24FA0015CONSTRUCTION OF SEAWALL BARANGAY 3, MALILIPOT, ALBAY | Region V | Albay 1st DEO | Completed | ₱109M | 100% | High risk69 | —-0.073 |
| 18 | 19FA0076CLUSTER 40 -REHAB./RECONST. OF BULAWAN RIVER CONTROL (SAN JOSE & SAN ROQUE SECTION), MALILIPOT, ALBAY | Region V | Albay 1st DEO | Completed | ₱88.9M | 100% | High risk69 | —-0.021 |
| 19 | 20FA0004CLUSTER 4- CONSTRUCTION/EXTENSION OF CAJUGOTAN SEAWALL & SAN PEDRO SEAWALL, BACACAY, ALBAY AND BINITAYAN, SEAWALL, MALILIPOT, ALBAY | Region V | Albay 1st DEO | Completed | ₱97.6M | 100% | High risk69 | —-0.075 |
| 20 | 20FA0043CONSTRUCTION/IMPV'T. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION: CAGRARAY CIRCUMFERENTIAL ROAD, BACACAY, ALBAY | Region V | Albay 1st DEO | Completed | ₱144.8M | 100% | High risk69 | —-0.080 |
| 21 | 23FA0057CONSTRUCTION/EXTENSION OF SALVACION SEAWALL(PHASE 4), TABACO CITY, ALBAY | Region V | Albay 1st DEO | Completed | ₱96.5M | 100% | High risk69 | —-0.077 |
| 22 | 19FA0014CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION, CAGRARAY CIRCUMFERETIAL ROAD, BACACAY, ALBAY | Region V | Albay 1st DEO | Completed | ₱96.5M | 100% | High risk68 | —-0.089 |
| 23 | 19FA0028CLUSTER 8-STO. DOMINGO-BUHATAN-CAGRARAY CIRCUMFERENTIAL ROAD WIDENING SLOPE PROTECTION & DRAINAGE ALONG ROADS, STO. DOMINGO & BACACAY, ALBAY; AND SHOULDER PAVING/CONSTRUCTION ALONG DM-JCT-LEGAZPI-STO. DOMINGO-TABACO-CAM SUR BDRY. ROAD, TIWI, ALBAY | Region V | Albay 1st DEO | Completed | ₱91.5M | 100% | High risk67 | —-0.090 |
| 24 | 24FA0049CLUSTER 10 CONSTRUCTION OF MULTI-PURPOSE BLDGS. AT MALILIPOT,TIWI AND TABACO CITY, ALBAY | Region V | Albay 1st DEO | On-Going | ₱64.4M | 90% | High risk67 | —-0.051 |
| 25 | 22FA0081CLUSTER 24- CONST./REHAB./COMPLETION OF MULTI-PURPOSE BLDG. (EVACUATION CENTER) IN THE FIRST DISTRICT OF ALBAY | Region V | Albay 1st DEO | Completed | ₱62.3M | 100% | High risk67 | —-0.091 |