Contractor dossier
236 projects on file, including joint ventures this contractor is part of.
Total projects
236
Total budget
₱9.6B
Average progress
98.8%
Completion rate
95.8%
Average risk score
47.8
Medium risk on average, out of 100
Flagged as unusual
3
1.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 107 | ₱5.3B | 50.5 | 3 | 98.4% |
| Region VIII | 66 | ₱2B | 52.7 | 0 | 98.1% |
| Region XIII | 63 | ₱2.2B | 38.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 177 | ₱7.2B | 46.9 | 0 | 99.3% |
| Buildings and Facilities | 24 | ₱1B | 41.1 | 1 | 97.5% |
| Bridges | 12 | ₱563M | 49.9 | 1 | 100.0% |
| OTHER | 8 | ₱336.5M | 63.7 | 1 | 87.5% |
| Flood Control and Drainage | 8 | ₱358.5M | 45.4 | 0 | 100.0% |
| GAA 2025 OO-1 | 4 | ₱126.4M | 88.8 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱19.6M | 47.3 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱2.7M | 82.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IE0006ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS, CALUBIAN JCT-SN ISIDRO-TABANGO-VILLABA-PALOMPON RD K1039+422-K1039+632, K1039+971-K1040+036 | Region VIII | Leyte 3rd DEO | On-Going | ₱18.3M | 100% | High risk91 | —-0.011 |
| 25ID0061ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE TERTIARY ROADS LA PAZ-JAVIER-BITO RD - K0065 + (-291) - K0065 + 214,MAC ARTHUR,LEYTE | Region VIII | Leyte 2nd DEO | On-Going | ₱17.6M | 100% | High risk91 | —-0.008 |
| 25ID0058ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS PALO-CARIGARA-ORMOC RD - K0959 + 500 - K0960 + 443,CARIGARA,LEYTE | Region VIII | Leyte 2nd DEO | Completed | ₱65M | 100% | High risk88 | —-0.036 |
| 25ID0062ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS PALO-CARIGARA -ORMOC RD - K0963 +226 K0963 + 827, CAPOOCAN,LEYTE | Region VIII | Leyte 2nd DEO | Completed | ₱25.4M | 100% | High risk85 | —-0.040 |
| 25I00012SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) - AS PER R.A. 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY - K0953+098 - K0953+125, LEYTE 2ND LD | Region VIII | Region VIII | Completed | ₱2.7M | 100% | High risk82 | —-0.025 |
| 24HN0226OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - MACTAN AIRPORT RD - K0018 + 785 - K0018 + 1936, LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱76.8M | 0% | High risk71 | Flagged0.030 |
| 17H00016MFO-1 NATIONAL ROAD NETWORK SERVICES, ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS/SLOPE COLLAPSE, AND LANDSLIDE CEBU-BALAMBAN TRANSCENTRAL HIGHWAY, K0036+790-K0036+880; K0031+910-K0031+985 | Region VII | Region VII | Completed | ₱162.1M | 100% | High risk65 | —-0.038 |
| 25IE0010ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS - CALUBIAN JCT-SN ISIDRO-TABANGO-VILLABA-PALOMPON RD K1042+285-K1046+979, VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱142.8M | 100% | High risk65 | —-0.046 |
| 17H00015MF0 1- NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT, IMPROVEMENT/WIDENING OF NATIONAL ROADS, TERTIARY ROADS, P00109126VS, BOGO-CURVA-MEDELLIN-DAANBANTAYAN-MAYA ROAD | Region VII | Region VII | Completed | ₱94.6M | 100% | High risk64 | —-0.052 |
| 25H00010ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, CEBU NORTH HAGNAYA WHARF RD - K0098 + 829 - K0099 + 889, K0102 + 000 - K0102 + 680, K0105 + 658 - K0105 + 993 | Region VII | Region VII | On-Going | ₱158.8M | 93% | High risk64 | —-0.040 |
| 21H00021LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), BARANGAY POBL | Region VII | Region VII | Completed | ₱187.2M | 100% | High risk63 | —-0.052 |
| 16HD0059CONST. & MAINT. OF BRIDGES ALONG NATIONAL ROADS - WIDENING OF BONGON BRIDGE (B00621CB), TABUELAN | Region VII | Cebu 4th DEO | Completed | ₱24.5M | 100% | High risk63 | —-0.030 |
| 20HN0081LP: LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES -LOCAL ROADS - REHABILITATION AND IMPROVEMENT OF GARING-DANGLAG-POLOG ROAD WITH SLOPE PROTECTION, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱47M | 100% | High risk63 | —-0.029 |
| 20HN0082LP: LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - REHABILITATION AND IMPROVEMENT OF DANGLAG-GARING- LANIPGA ROAD WITH SLOPE PROTECTION, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱47M | 100% | High risk63 | —-0.030 |
| 16HD0063CONST & MAINT OF BRIDGES ALONG NATL ROADS-WIDENING OF CAPUTATAN BR (B00622CB), BCMDM ROAD, MEDELLIN | Region VII | Cebu 4th DEO | Completed | ₱17.6M | 100% | High risk63 | —-0.030 |
| 16HD0098CONST. & MAINT. OF BRIDGES-WIDENING OF MAGSA-UBAY BR (B00474CB), BCMDM ROAD, DAANBANTAYAN | Region VII | Cebu 4th DEO | Completed | ₱32.3M | 100% | High risk63 | —-0.029 |
| 16HD0092NETWORK DEVT-IMPVT/WIDENING OF ROAD, CNHWR, K0078+(-954)-K0078+861, TABOGON, CEBU | Region VII | Cebu 4th DEO | Completed | ₱45.1M | 100% | High risk62 | —-0.031 |
| 23H00100CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTIPURPOSE BUILDING (LILOAN, MUNICIPAL HALL), LILOAN, CEBU | Region VII | Region VII | On-Going | ₱193M | 40% | High risk62 | Flagged0.052 |
| 25HN0120SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD AT OLANGO ISLAND (PHASE 2), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱142.3M | 100% | High risk62 | —-0.074 |
| 16HD0091IMPROVEMENT/WIDENING OF NATIONAL ROADS INCLUDING DRAINAGE ALONG AYDH, K0111+131-K0113+034, TABUELAN | Region VII | Cebu 4th DEO | Completed | ₱46.1M | 100% | High risk62 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23H00100CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTIPURPOSE BUILDING (LILOAN, MUNICIPAL HALL), LILOAN, CEBU | Region VII | Region VII | On-Going | ₱193M | 40% | High risk62 | Flagged0.052 |
| 24HN0226OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - MACTAN AIRPORT RD - K0018 + 785 - K0018 + 1936, LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱76.8M | 0% | High risk71 | Flagged0.030 |
| 17HI0021CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, REPLACEMENT OF PERMANENT WEAK BRIDGES AT SUBA BRIDGE (B00625CB) ALONG CONSOLACION-TAYUD-LILOAN, CEBU | Region VII | Cebu 5th DEO | Completed | ₱46.5M | 100% | Medium risk51 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 20HD0041ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS, BOGO-CURVA-MEDELLIN-DAANBANTAYAN-MAYA ROADS, K0103+927-K0104+483, K0104+899-K0105+355, K0136+(-633)-K0136+182, BOGO-CURVA-MEDELLIN-DAANBANTAYAN-MAYA ROAD | Region VII | Cebu 4th DEO | Completed | ₱57M | 100% | Medium risk53 | —-0.092 |
| 52 | 24IE0004ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS - LEMON-LEYTE-BILIRAN RD, K0977+669 K0979+457, K0981+056 K0981+558, LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱48.9M | 100% | Medium risk53 | —-0.095 |
| 53 | 23HD0050ROAD WIDENING ALONG CEBU NORTH HAGNAYA WHARF ROAD, K0080+424 - K0080+578, K0080+578 - K0080+710, K0080+710 - K0081+122, K0081+122 - K0081+209, K0093+096 - K0094+500, CITY OF BOGO AND TABOGON, CEBU | Region VII | Cebu 4th DEO | Completed | ₱68.2M | 100% | Medium risk53 | —-0.091 |
| 54 | 23HD0004PREVENTIVE MAINTENANCE ALONG CEBU NORTH HAGNAYA WHARF ROAD, K0095+1728-K0097-678, K0099+938-K0100+762, CITY OF BOGO, CEBU | Region VII | Cebu 4th DEO | Completed | ₱81.7M | 100% | Medium risk53 | —-0.087 |
| 55 | 19IE0045ASSET PRESERVATION-PREVENTIVE MAINTENANCE-TERTIARY ROADS, SAN ISIDRO-DAJA ROAD, K1024+437- K1026+438, SAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱47M | 100% | Medium risk53 | —-0.096 |
| 56 | 23HD0064CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY AGUJO, DAANBANTAYAN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱39.6M | 100% | Medium risk52 | —-0.089 |
| 57 | 24HD0046CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY AGUJO, DAANBANTAYAN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱39.6M | 100% | Medium risk52 | —-0.089 |
| 58 | 24HD0051CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - BARANGAY GUADALUPE, CITY OF BOGO TO BARANGAY SALAG, TABOGON ROAD LEADING TO SALAG'S HANGING BRIDGE AND VARIOUS TOURISM DESTINATIONS, CITY OF BOGO AND TABOGON, CEBU | Region VII | Cebu 4th DEO | Completed | ₱72.4M | 100% | Medium risk52 | —-0.090 |
| 59 | 19IE0034ASSET PRESERVATION-PREVENTIVE MAINTENANCE-TERTIARY ROADS, CABUNGAAN-TABUNOK-CONSUEGRA ROAD, K1014+(-449)-K1016+347VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱47M | 100% | Medium risk52 | —-0.096 |
| 60 | 24HD0057CONSTRUCTION OF MULTI-PURPOSE BUILDING, DAANBANTAYAN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱29.7M | 100% | Medium risk51 | —-0.089 |
| 61 | 24HD0001PREVENTIVE MAINTENANCE ALONG CEBU NORTH HAGNAYA WHARF ROAD-K0078+(-949)-K0078+(-023), TABOGON, CEBU | Region VII | Cebu 4th DEO | Completed | ₱53.6M | 100% | Medium risk51 | —-0.094 |
| 62 | 20HD0100REHABILITATION/CONCRETING/WIDENING OF PROVINCIAL ROAD, BARANGAY MUABOG TO BARANGAY TAPUL, TABOGON, CEBU | Region VII | Cebu 4th DEO | Completed | ₱48.3M | 100% | Medium risk51 | —-0.034 |
| 63 | 16HD0099CONST & MAINT. OF BRIDGES ALONG NATIONAL ROADS; WIDENING OF BRS, BINABAG BR. ALONG CNHWR, BOGO CITY | Region VII | Cebu 4th DEO | Completed | ₱30.4M | 100% | Medium risk51 | —-0.030 |
| 64 | 17HI0021CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, REPLACEMENT OF PERMANENT WEAK BRIDGES AT SUBA BRIDGE (B00625CB) ALONG CONSOLACION-TAYUD-LILOAN, CEBU | Region VII | Cebu 5th DEO | Completed | ₱46.5M | 100% | Medium risk51 | Flagged0.005 |
| 65 | 20HD0039CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS ALONG MAYA RORO PORT TO MALAPASCUA ISLAND - PACKAGE II, STA. 2+477 - STA. 8+806, MEDELLIN AND DAANBANTAYAN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.093 |
| 66 | 22HN0092CSSP: BIP - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF MAPULO, GARING ROAD, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱49.5M | 100% | Medium risk51 | —-0.095 |
| 67 | 19HI0058CONCRETING OF BRGY. VINCENTE ROAD, BRGY. POBLACION, LILOAN, CEBU | Region VII | Cebu 5th DEO | Completed | ₱47.4M | 100% | Medium risk50 | —-0.095 |
| 68 | 24HD0029PREVENTIVE MAINTENANCE ALONG BOGO-POLAMBATO WHARF ROAD, K0102+(-314) - K0102+520, CITY OF BOGO, CEBU | Region VII | Cebu 4th DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.095 |
| 69 | 22HD0066REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG CEBU NORTH HAGNAYA WHARF ROAD, K0078(-822)-K0078+(-828), K0078+(-688)-K0078+(-603), K0078+(-281)-K0078+(-119), K0078+654-K0078+966, K0080+120-K0080+424, K0081+511-K0082+000, K0084+430-K0 | Region VII | Cebu 4th DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.094 |
| 70 | 20HD0038CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS ALONG MAYA RORO PORT TO MALAPASCUA ISLAND-PACKAGE I, STA. 0+319-STA. 2+256, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.094 |
| 71 | 16HD0097CONST. & MAINT. OF BRIDGES-WIDENING OF POB. DAAN BANTAYAN BRIDGE (B00011CB), BCMDM RD, DAANBANTAYAN | Region VII | Cebu 4th DEO | Completed | ₱29.4M | 100% | Medium risk50 | —-0.028 |
| 72 | 22N00174CONSTRUCTION OF NRJ PACIFICO-TIGASAO BYPASS BRIDGE PHASE 1, SAN ISIDRO, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱119.7M | 100% | Medium risk50 | —-0.030 |
| 73 | 17HI0039WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES AT PANALIPAN BRIDGE (B000576CB) ALONG CEBU NORTH HAGNAYA WHARF ROAD, PHASE 1, K0047+777 - K0047+849, K0047+513 - K0047+777, K0047+849 - K0048+113, CATMON, CEBU | Region VII | Cebu 5th DEO | Completed | ₱45M | 100% | Medium risk50 | —-0.025 |
| 74 | 24IE0023ASSET PRESERVATION-PREVENTIVE MAINTENANCE-TERTIARY ROADS SN ISIDRO-DAJA RD K1020+974 K1022+100, SAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱29.3M | 100% | Medium risk50 | —-0.095 |
| 75 | 24IE0002ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS CALUBIAN JCT-SN ISIDRO-TABANGO-VILLABA-PALOMPON RD, K1037+547-K1039+422 TABANGO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱44.6M | 100% | Medium risk50 | —-0.096 |