Contractor dossier
284 projects on file, including joint ventures this contractor is part of.
Total projects
284
Total budget
₱2.1B
Average progress
98.6%
Completion rate
89.8%
Average risk score
35.8
Medium risk on average, out of 100
Flagged as unusual
2
0.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 264 | ₱1.8B | 35.4 | 0 | 99.3% |
| Region I | 11 | ₱183.4M | 52.3 | 2 | 82.3% |
| Region IV-B | 9 | ₱81.3M | 26.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 157 | ₱1.3B | 33.7 | 1 | 98.4% |
| Roads | 84 | ₱519.8M | 35.8 | 0 | 99.6% |
| Bridges | 16 | ₱40.4M | 27.1 | 0 | 100.0% |
| Flood Control and Drainage | 11 | ₱128.4M | 42.2 | 0 | 95.0% |
| Water Provision and Storage | 8 | ₱40.1M | 32.7 | 0 | 100.0% |
| GAA 2025 OO-1 | 4 | ₱63.9M | 92.3 | 0 | 91.2% |
| GAA 2025 OO-2 | 2 | ₱18.9M | 88.0 | 0 | 95.4% |
| OTHER | 2 | ₱9.6M | 75.0 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DL0112ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, MSR JCT-LOPEZ-BUENAVISTA RD - K0218+(-650) - K0218+( | Region IV-A | Quezon 4th DEO | On-Going | ₱33.2M | 66% | High risk93 | —-0.003 |
| 25DL0096ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, MSR JCT-LOPEZ-CATANAUAN RD - 217 + (-745.70) - K0217 + (-655.70), K022 | Region IV-A | Quezon 4th DEO | On-Going | ₱11.7M | 100% | High risk92 | —-0.014 |
| 25DL0098ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, MSR JCT LOPEZ-HONDAGUA PORT RD - K0222+679 - K0222+805, K0224+416 - K | Region IV-A | Quezon 4th DEO | On-Going | ₱10M | 100% | High risk92 | —-0.014 |
| 25DL0099ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, MSR JCT-LOPEZ-BUENAVISTA RD K0226+100 - K0226+176.50, K0229+846 - K02 | Region IV-A | Quezon 4th DEO | On-Going | ₱9M | 100% | High risk92 | —-0.014 |
| 25DL0148ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BREAKWATER, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱14.2M | 91% | High risk88 | —-0.033 |
| 25DL0174ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL, BARANGAY PINAGTALLERAN, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱4.7M | 100% | High risk88 | —-0.034 |
| 24A00302CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, MANILA NORTH ROAD - K0519+954-K0520+030 | Region I | Region I | On-Going | ₱4.8M | 69% | High risk78 | —-0.033 |
| 25DL0058CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), BARANGAYS PAGSABANGAN-VILLA FUERTE ACC | Region IV-A | Quezon 4th DEO | On-Going | ₱4.8M | 100% | High risk75 | —-0.017 |
| 23A00147NATIONAL BUILDING PROGRAM, IMPROVEMENT OF NATIONAL ECONOMIC AND DEVELOPMENT AUTHORITY (NEDA) REGIONAL OFFICE I BUILDING, GUERRERO ROAD, SAN FERNANDO CITY, LA UNION | Region I | Region I | On-Going | ₱4.8M | 100% | High risk74 | Flagged0.011 |
| 22A00197CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS), CONSTRUCTION OF CRIME LABORATORY BUILDING, CAMP BGEN OSCAR M. FLORENDO, PARIAN, SAN FERNANDO CIT | Region I | La Union 1st DEO | Completed | ₱38.6M | 100% | High risk66 | —-0.051 |
| 22A00038CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS), CONSTRUCTION OF GALIMUYOD MUNICIPAL POLICE STATION BUILDING, GALIMUYOD, ILOCOS SUR | Region I | Region I | Completed | ₱11.9M | 100% | High risk63 | —-0.053 |
| 22DK0114LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF BUILDING OF THE SOUTHERN LUZON STATE UNIVERSITY (SLSU) - COLLEGE OF MEDICINE, LUCBAN, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.080 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23A00147NATIONAL BUILDING PROGRAM, IMPROVEMENT OF NATIONAL ECONOMIC AND DEVELOPMENT AUTHORITY (NEDA) REGIONAL OFFICE I BUILDING, GUERRERO ROAD, SAN FERNANDO CITY, LA UNION | Region I | Region I | On-Going | ₱4.8M | 100% | High risk74 | Flagged0.011 |
| 24A00616CONSTRUCTION OF A SILK WEAVING CENTER IN LA UNION - DON MARIANO MARCOS MEMORIAL STATE UNIVERSITY | Region I | Region I | On-Going | ₱29.7M | 76% | Medium risk45 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 18DL0148A. ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 1. ASSET PRESERVATION PROGRAM C. CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS 1. PRIMARY ROADS 1. DAANG MAHARLIKA (LZ) - K0194+065 - K0194+714, K0194 | Region IV-A | Quezon 4th DEO | Completed | ₱37.8M | 100% | Medium risk47 | —-0.105 |
| 52 | 21DL0122LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDING AND OTHER STRUCTURES, MULTIPURPOSE / FACILITIES, REHABILITATION OF MULTI-PURPOSE BUILDING AT BRGY. TINIGUIBAN, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.102 |
| 53 | 24DL0116CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES 8. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BALUNGAY, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.103 |
| 54 | 24DL0038CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES 45. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TALINGTING, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.099 |
| 55 | 22DL0050CLUSTER XXIA. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY CAPULUAN CENTRAL, GUINAYANGAN, QUEZON B. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY DANCALAN CENTRAL, GUINAYANGAN, QUEZONC. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY GAPAS, | Region IV-A | Quezon 4th DEO | Completed | ₱9.7M | 100% | Medium risk47 | —-0.101 |
| 56 | 23DL0002CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES 14. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY DE LA PAZ, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.102 |
| 57 | 22DL0180CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES 35. CONSTRUCTION OF MULTI-PURPOSE FACILITIES, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.102 |
| 58 | 24DL0069CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES 40. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MAABOT, PEREZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.099 |
| 59 | 23DL0033CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM, MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES 7. CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY STA. MARIA, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.096 |
| 60 | 23DL0155CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM, MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES 29. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MAGUILAYAN, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.100 |
| 61 | 21DD0259LOCAL PROGRAM, CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, FLOOD CONTROL AND DRAINAGE, DRAINAGE/ PROTECTION WORKS, CONSTRUCTION OF SLOPE PROTECTION IN BARANGAY CASTILLO, PADRE GARCIA, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱9.5M | 100% | Medium risk47 | —-0.090 |
| 62 | 24DL0052CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES 37. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ERMITA, GUINAYANGAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.099 |
| 63 | 24DL0053CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES 39. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY HIMBUBULO WESTE, GUINAYANGAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.097 |
| 64 | 25DL0041ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SMALL RIVER IMPROVEMENT PROJECT INCLUDING PROTECTION STR | Region IV-A | Quezon 4th DEO | On-Going | ₱14.3M | 45% | Medium risk46 | —-0.038 |
| 65 | 21DL0080CLUSTER XIA. LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDING AND OTHER STRUCTURES, MULTIPURPOSE / FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING - BARANGAY DUHAT, PLARIDEL, QUEZONB. LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROG | Region IV-A | Quezon 4th DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.100 |
| 66 | 20DJ0087LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION OF ROAD BRGY. POBLACION-BRGY. BULIRAN, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱14.9M | 100% | Medium risk46 | —-0.110 |
| 67 | 19DL0144CLUSTER XA. I. OPERATIONS D. LOCAL PROGRAM 3. LOCAL INFRASTRUCTURE PROGRAM A. BUILDINGS AND OTHER STRUCTURES 1. MULTIPURPOSE / FACILITIES 5. CONSTRUCTION OF MULTI-PURPOSE BUILDING, CALAUAG EAST CENTRAL SCHOOL, BRGY. POBLACION 5, CALAUAG, QUEZONB. I. O | Region IV-A | Quezon 4th DEO | Completed | ₱6.7M | 100% | Medium risk46 | —-0.103 |
| 68 | 25DL0057CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), BARANGAYS VILLA VICTORIA-M.H. DEL PILA | Region IV-A | Quezon 4th DEO | On-Going | ₱4.8M | 100% | Medium risk46 | —-0.077 |
| 69 | 25DL0061CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), HIMBUBULO ESTE - DANCALAN CENTRAL COASTAL ECOTOURISM ROAD LEADING TO PRISTINE BEACHES, GUINAYANGAN, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱4.8M | 100% | Medium risk46 | —-0.077 |
| 70 | 20DL0028C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 1. CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS 7. ACCESS ROAD LEADING TO MAULAWIN WATERSHED/SPRING, GUINAYANGAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.101 |
| 71 | 20DL0043C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 3. CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES, AND ECONOMIC ZONES 11. BARANGAYS VILLA VICTORIA-M.H. DEL PILAR ACCESS ROAD IN SUPPORT OF AGRI-BASED INDUSTRIES, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.102 |
| 72 | 23DL0084ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, 6. CONSTRUCTION OF DRAINAGE STRUCTURE ALONG CALAUAG-GUINAYANGAN-BUENAVIS | Region IV-A | Quezon 4th DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.086 |
| 73 | 25DL0020CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), ACCESS ROAD TO HAGDAN-HAGDAN FALLS AND MABILOG NA LAYON, STA. CATALINA, ATIMONAN, QUE | Region IV-A | Quezon 4th DEO | On-Going | ₱4.8M | 100% | Medium risk46 | —-0.078 |
| 74 | 20DL0035C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 1. CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS 13. GAPAS - DANLAGAN BATIS ECOTOURISM ROAD LEADING TO GAPAS CAVE AND DANLAGAN BATIS CAVE AND DANLAGAN RESERVA SPRING RESORT, | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.103 |
| 75 | 20DL0022C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 1. CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS 19. VILLA MANZANO NORTE PAMBUHAN MAINIT NORTE RIZAL ECO-TOURISM ROAD LEADING TO MAINIT HOTSPRING, PEREZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.103 |