Contractor dossier
284 projects on file, including joint ventures this contractor is part of.
Total projects
284
Total budget
₱2.1B
Average progress
98.6%
Completion rate
89.8%
Average risk score
35.8
Medium risk on average, out of 100
Flagged as unusual
2
0.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 264 | ₱1.8B | 35.4 | 0 | 99.3% |
| Region I | 11 | ₱183.4M | 52.3 | 2 | 82.3% |
| Region IV-B | 9 | ₱81.3M | 26.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 157 | ₱1.3B | 33.7 | 1 | 98.4% |
| Roads | 84 | ₱519.8M | 35.8 | 0 | 99.6% |
| Bridges | 16 | ₱40.4M | 27.1 | 0 | 100.0% |
| Flood Control and Drainage | 11 | ₱128.4M | 42.2 | 0 | 95.0% |
| Water Provision and Storage | 8 | ₱40.1M | 32.7 | 0 | 100.0% |
| GAA 2025 OO-1 | 4 | ₱63.9M | 92.3 | 0 | 91.2% |
| GAA 2025 OO-2 | 2 | ₱18.9M | 88.0 | 0 | 95.4% |
| OTHER | 2 | ₱9.6M | 75.0 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DL0112ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, MSR JCT-LOPEZ-BUENAVISTA RD - K0218+(-650) - K0218+( | Region IV-A | Quezon 4th DEO | On-Going | ₱33.2M | 66% | High risk93 | —-0.003 |
| 25DL0096ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, MSR JCT-LOPEZ-CATANAUAN RD - 217 + (-745.70) - K0217 + (-655.70), K022 | Region IV-A | Quezon 4th DEO | On-Going | ₱11.7M | 100% | High risk92 | —-0.014 |
| 25DL0098ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, MSR JCT LOPEZ-HONDAGUA PORT RD - K0222+679 - K0222+805, K0224+416 - K | Region IV-A | Quezon 4th DEO | On-Going | ₱10M | 100% | High risk92 | —-0.014 |
| 25DL0099ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, MSR JCT-LOPEZ-BUENAVISTA RD K0226+100 - K0226+176.50, K0229+846 - K02 | Region IV-A | Quezon 4th DEO | On-Going | ₱9M | 100% | High risk92 | —-0.014 |
| 25DL0148ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BREAKWATER, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱14.2M | 91% | High risk88 | —-0.033 |
| 25DL0174ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL, BARANGAY PINAGTALLERAN, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱4.7M | 100% | High risk88 | —-0.034 |
| 24A00302CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, MANILA NORTH ROAD - K0519+954-K0520+030 | Region I | Region I | On-Going | ₱4.8M | 69% | High risk78 | —-0.033 |
| 25DL0058CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), BARANGAYS PAGSABANGAN-VILLA FUERTE ACC | Region IV-A | Quezon 4th DEO | On-Going | ₱4.8M | 100% | High risk75 | —-0.017 |
| 23A00147NATIONAL BUILDING PROGRAM, IMPROVEMENT OF NATIONAL ECONOMIC AND DEVELOPMENT AUTHORITY (NEDA) REGIONAL OFFICE I BUILDING, GUERRERO ROAD, SAN FERNANDO CITY, LA UNION | Region I | Region I | On-Going | ₱4.8M | 100% | High risk74 | Flagged0.011 |
| 22A00197CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS), CONSTRUCTION OF CRIME LABORATORY BUILDING, CAMP BGEN OSCAR M. FLORENDO, PARIAN, SAN FERNANDO CIT | Region I | La Union 1st DEO | Completed | ₱38.6M | 100% | High risk66 | —-0.051 |
| 22A00038CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS), CONSTRUCTION OF GALIMUYOD MUNICIPAL POLICE STATION BUILDING, GALIMUYOD, ILOCOS SUR | Region I | Region I | Completed | ₱11.9M | 100% | High risk63 | —-0.053 |
| 22DK0114LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF BUILDING OF THE SOUTHERN LUZON STATE UNIVERSITY (SLSU) - COLLEGE OF MEDICINE, LUCBAN, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.080 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23A00147NATIONAL BUILDING PROGRAM, IMPROVEMENT OF NATIONAL ECONOMIC AND DEVELOPMENT AUTHORITY (NEDA) REGIONAL OFFICE I BUILDING, GUERRERO ROAD, SAN FERNANDO CITY, LA UNION | Region I | Region I | On-Going | ₱4.8M | 100% | High risk74 | Flagged0.011 |
| 24A00616CONSTRUCTION OF A SILK WEAVING CENTER IN LA UNION - DON MARIANO MARCOS MEMORIAL STATE UNIVERSITY | Region I | Region I | On-Going | ₱29.7M | 76% | Medium risk45 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 21DL0120LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDING AND OTHER STRUCTURES, MULTIPURPOSE / FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MAPULOT, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.102 |
| 102 | 25DL0105ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, GUMACA-PITOGO-MULANAY-SN NARCISO RD - K0202+(-019) - K0202+062, K0202+175.90 - K0202+319.90 | Region IV-A | Quezon 4th DEO | On-Going | ₱9.6M | 100% | Medium risk46 | —-0.078 |
| 103 | 23DL0130CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM, ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES 2. CONSTRUCTION OF SAN ROQUE IBA- YAGANAK- PISIPIS ROAD, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱7.9M | 100% | Medium risk46 | —-0.105 |
| 104 | 25DL0100ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - TERTIARY ROADS, TALABA-SUMMIT-PANAON RD - K0179 + 865 - K0179 + 895, K0180 + 480 - K0180+487, K0180+501 - K0180+613.50 | Region IV-A | Quezon 4th DEO | On-Going | ₱6.6M | 100% | Medium risk46 | —-0.078 |
| 105 | 25DL0028ACCESS ROAD TO MAHARLIKA HIGHWAY SUPPORT OF AGRI-BASED INDUSTRIES, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱9.6M | 100% | Medium risk46 | —-0.078 |
| 106 | 25DL0010ACCESS ROADS IN SUPPORT OF HANDICRAFTS, FOODS, COCONUT PROCESSING AND OTHER AGRI-BASED INDUSTRIES, ATIMONAN, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱9.7M | 100% | Medium risk46 | —-0.079 |
| 107 | 25DL0097ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, JCT MSR-OLD ZIGZAG RD - K0156 + (-037.10) - K0156 + 062.40, K0156 + 2 | Region IV-A | Quezon 4th DEO | Completed | ₱6.5M | 100% | Medium risk46 | —-0.107 |
| 108 | 23DL0096ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS 2. DAANG MAHARLIKA (LZ) K0146 + 496 K0146 + 631 | Region IV-A | Quezon 4th DEO | Completed | ₱6.3M | 100% | Medium risk46 | —-0.108 |
| 109 | 20DL0024C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 3. CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES, AND ECONOMIC ZONES 4. ACCESS ROADS IN SUPPORT OF COCONUT PROCESSING, COFFEE AND OTHER AGRI-BASED INDUSTRIES, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.102 |
| 110 | 24DL0011CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) 10. DUNGAWAN CENTRAL - A. MABINI ECOTOURISM ROAD LEADING TO MABINI HIGHLANDS HIKING AN | Region IV-A | Quezon 4th DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.104 |
| 111 | 24DL0104CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT) 7. BARANGAYS BATONG DALIG-VILLA VICTORIA-BUNGAHAN ACCESS ROAD IN SUPPORT OF AGRI-BASED INDUSTRIES, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.105 |
| 112 | 23DL0095ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS 1. DAANG MAHARLIKA (LZ) K0135 + (-060) K0135 + 091 | Region IV-A | Quezon 4th DEO | Completed | ₱4.9M | 100% | Medium risk45 | —-0.106 |
| 113 | 24DL0106CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT) 9. BARANGAYS PAGSABANGAN, BANTAD, AND ANONANGIN ACCESS ROAD IN SUPPORT OF AGRI-BASED INDUSTRIES, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.9M | 100% | Medium risk45 | —-0.105 |
| 114 | 24DL0105CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT) 8. BARANGAYS MABUNGA, BUNGAHAN ACCESS ROAD IN SUPPORT OF AGRI-BASED INDUSTRIES, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.9M | 100% | Medium risk45 | —-0.105 |
| 115 | 23DL0161CONVERGE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM, ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES 9. CONSTRUCTION OF LOCAL ROAD, BARANGAY CAMOHAGUIN, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱5M | 100% | Medium risk45 | —-0.104 |
| 116 | 22DL0074CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MANSILAY, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱5M | 100% | Medium risk45 | —-0.103 |
| 117 | 23DM0022CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY DEL ROSARIO, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱5M | 100% | Medium risk45 | —-0.102 |
| 118 | 24A00616CONSTRUCTION OF A SILK WEAVING CENTER IN LA UNION - DON MARIANO MARCOS MEMORIAL STATE UNIVERSITY | Region I | Region I | On-Going | ₱29.7M | 76% | Medium risk45 | Flagged0.008 |
| 119 | 25DL0177ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF DRAINAGE STRUCTURE ALONG BARANGAY POBLACION, TAGKAWAYA | Region IV-A | Quezon 4th DEO | On-Going | ₱4.7M | 100% | Medium risk45 | —-0.057 |
| 120 | 20DL0066D. LOCAL PROGRAM 3. LOCAL INFRASTRUCTURE PROGRAM A. BUILDINGS AND OTHER STRUCTURES 1. MULTIPURPOSE/ FACILITIES 13. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. VILLA NAVA, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱2.4M | 100% | Medium risk44 | —-0.071 |
| 121 | 24A00599CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM | Region I | Region I | Completed | ₱6.4M | 100% | Medium risk44 | —-0.047 |
| 122 | 19DL0188CONSTRUCTION OF ELEMENTARY AND SECONDARY SCHOOL BUILDINGS UNDER THE DEPED'S CY 2019 BASIC EDUCATIONAL FACILITIES FUND (BATCH 1), 2STY8CL & 2STY4CL SABANG ES, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱30.9M | 100% | Medium risk44 | —-0.053 |
| 123 | 20DL0222CY 2020 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 2STY4CL DOÑA AURORA ES, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱15M | 100% | Medium risk43 | —-0.059 |
| 124 | 23DL0179CONCRETING OF BRGY. DEL ROSARIO FMR, BRGY. DEL ROSARIO, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱5.1M | 100% | Medium risk42 | —-0.053 |
| 125 | 21DL0144CONCRETING OF BRGY. MAGUIBUAY FMR, BRGY. MAGUIBUAY, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱12M | 100% | Medium risk42 | —-0.055 |