284 projects on file, including joint ventures this contractor is part of.
Total projects
284
Total budget
₱2.1B
Average progress
98.6%
Completion rate
89.8%
Average risk score
35.8
Medium risk on average, out of 100
Flagged as unusual
2
0.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 264 | ₱1.8B | 35.4 | 0 | 99.3% |
| Region I | 11 | ₱183.4M | 52.3 | 2 | 82.3% |
| Region IV-B | 9 | ₱81.3M | 26.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 157 | ₱1.3B | 33.7 | 1 | 98.4% |
| Roads | 84 | ₱519.8M | 35.8 | 0 | 99.6% |
| Bridges | 16 | ₱40.4M | 27.1 | 0 | 100.0% |
| Flood Control and Drainage | 11 | ₱128.4M | 42.2 | 0 | 95.0% |
| Water Provision and Storage | 8 | ₱40.1M | 32.7 | 0 | 100.0% |
| GAA 2025 OO-1 | 4 | ₱63.9M | 92.3 | 0 | 91.2% |
| GAA 2025 OO-2 | 2 | ₱18.9M | 88.0 | 0 | 95.4% |
| OTHER | 2 | ₱9.6M | 75.0 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DL0112ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, MSR JCT-LOPEZ-BUENAVISTA RD - K0218+(-650) - K0218+( | Region IV-A | Quezon 4th DEO | On-Going | ₱33.2M | 66% | High risk93 | —-0.003 |
| 25DL0096ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, MSR JCT-LOPEZ-CATANAUAN RD - 217 + (-745.70) - K0217 + (-655.70), K022 | Region IV-A | Quezon 4th DEO | On-Going | ₱11.7M | 100% | High risk92 | —-0.014 |
| 25DL0098ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, MSR JCT LOPEZ-HONDAGUA PORT RD - K0222+679 - K0222+805, K0224+416 - K | Region IV-A | Quezon 4th DEO | On-Going | ₱10M | 100% | High risk92 | —-0.014 |
| 25DL0099ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, MSR JCT-LOPEZ-BUENAVISTA RD K0226+100 - K0226+176.50, K0229+846 - K02 | Region IV-A | Quezon 4th DEO | On-Going | ₱9M | 100% | High risk92 | —-0.014 |
| 25DL0148ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BREAKWATER, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱14.2M | 91% | High risk88 | —-0.033 |
| 25DL0174ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL, BARANGAY PINAGTALLERAN, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱4.7M | 100% | High risk88 | —-0.034 |
| 24A00302CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, MANILA NORTH ROAD - K0519+954-K0520+030 | Region I | Region I | On-Going | ₱4.8M | 69% | High risk78 | —-0.033 |
| 25DL0058CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), BARANGAYS PAGSABANGAN-VILLA FUERTE ACC | Region IV-A | Quezon 4th DEO | On-Going | ₱4.8M | 100% | High risk75 | —-0.017 |
| 23A00147NATIONAL BUILDING PROGRAM, IMPROVEMENT OF NATIONAL ECONOMIC AND DEVELOPMENT AUTHORITY (NEDA) REGIONAL OFFICE I BUILDING, GUERRERO ROAD, SAN FERNANDO CITY, LA UNION | Region I | Region I | On-Going | ₱4.8M | 100% | High risk74 | Flagged0.011 |
| 22A00197CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS), CONSTRUCTION OF CRIME LABORATORY BUILDING, CAMP BGEN OSCAR M. FLORENDO, PARIAN, SAN FERNANDO CIT | Region I | La Union 1st DEO | Completed | ₱38.6M | 100% | High risk66 | —-0.051 |
| 22A00038CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS), CONSTRUCTION OF GALIMUYOD MUNICIPAL POLICE STATION BUILDING, GALIMUYOD, ILOCOS SUR | Region I | Region I | Completed | ₱11.9M | 100% | High risk63 | —-0.053 |
| 22DK0114LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF BUILDING OF THE SOUTHERN LUZON STATE UNIVERSITY (SLSU) - COLLEGE OF MEDICINE, LUCBAN, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.080 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23A00147NATIONAL BUILDING PROGRAM, IMPROVEMENT OF NATIONAL ECONOMIC AND DEVELOPMENT AUTHORITY (NEDA) REGIONAL OFFICE I BUILDING, GUERRERO ROAD, SAN FERNANDO CITY, LA UNION | Region I | Region I | On-Going | ₱4.8M | 100% | High risk74 | Flagged0.011 |
| 24A00616CONSTRUCTION OF A SILK WEAVING CENTER IN LA UNION - DON MARIANO MARCOS MEMORIAL STATE UNIVERSITY | Region I | Region I | On-Going | ₱29.7M | 76% | Medium risk45 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 18DL0401CY 2018 BASIC EDUCATION FACILITIES FUND, BATCH 3, CONSTRUCTION OF CLASSROOMS 2STY 6CL ATIMONAN CES (MERGED ATIMONAN CSI AND ATIMONAN CSII), ATIMONAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱13.2M | 100% | Medium risk42 | —-0.059 |
| 127 | 18DL0416CY 2018 BASIC EDUCATIONAL FACILITIES FUND, (CONSTRUCTION OF CLASSROOMS) BATCH 3, CONSTRUCTION OF CLASSROOMS 2STY 4CL SASTRE ES, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱10.2M | 100% | Medium risk42 | —-0.060 |
| 128 | 18DL0415CY 2018 BASIC EDUCATIONAL FACILITIES FUND, (CONSTRUCTION OF CLASSROOMS) BATCH 3, CONSTRUCTION OF CLASSROOMS 2STY 4CL PANIKIHAN ES, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱10M | 100% | Medium risk42 | —-0.060 |
| 129 | 19DL0179CONSTRUCTION OF ELEMENTARY AND SECONDARY SCHOOL BUILDINGS UNDER THE DEPED'S CY 2019 BASIC EDUCATIONAL FACILITIES FUND (BATCH 1), 2STY6CL KINATAKUTAN ES, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱13.9M | 100% | Medium risk42 | —-0.059 |
| 130 | 17DJ0090CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM ACADEMIC SCHOOL BUILDING AT ANASTACIA ELEMENTARY SCHOOL, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱10.1M | 100% | Medium risk41 | —-0.033 |
| 131 | 18DL0405CY 2018 BASIC EDUCATION FACILITIES FUND, (CONSTRUCTION OF CLASSROOMS) BATCH 3, CONSTRUCTION OF CLASSROOMS 2STY6CL, CANDA ILAYA ES, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱13.2M | 100% | Medium risk41 | —-0.060 |
| 132 | 18DL0404CY 2018 BASIC EDUCATIONAL FACILITIES FUND, (CONSTRUCTION OF CLASSROOMS) BATCH 3, CONSTRUCTION OF CLASSROOMS 2STY6CL, PROGRESO ES, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱13.2M | 100% | Medium risk41 | —-0.060 |
| 133 | 18DL0411CY 2018 BASIC EDUCATIONAL FACILITIES FUND, (CONSTRUCTION OF CLASSROOMS) BATCH 3, CONSTRUCTION OF CLASSROOMS, 2STY4CL AND 1STY2CL, BIGA-LABNIG ES, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱13.1M | 100% | Medium risk41 | —-0.060 |
| 134 | 19DL0181CONSTRUCTION OF ELEMENTARY AND SECONDARY SCHOOL BUILDINGS UNDER THE DEPED'S CY 2019 BASIC EDUCATIONAL FACILITIES FUND (BATCH 1), 2STY6CL VERGAÑA ES, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱13.9M | 100% | Medium risk41 | —-0.059 |
| 135 | 17DJ0103CONSTRUCTION OF FOUR (4) STOREY REGULAR WORKSHOP AT GULANG-GULANG NATIONAL HIGH SCHOOL-IBABANG TALIM EXTENSION, LUCENA CITY | Region IV-A | Quezon 2nd DEO | Completed | ₱19.9M | 100% | Medium risk40 | —-0.031 |
| 136 | 18DL0111CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF TVL AND OTHER WORKSHOPS, VERONICA NHS (FORMERLY MAGALLANES NHS VERONICA EXTENSION), 2 UNITS - REGULAR WORKSHOPS, 2 UNITS - SCIENCE LABS, 2 UNITS - ICT LABS, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱19.5M | 100% | Medium risk39 | —-0.030 |
| 137 | 18DL0104CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF TVL AND OTHER WORKSHOPS, MAGALLANES NHS - STA. CATALINA EXTENSION, 1 UNIT - UNIQUE WORKSHOPS, 1 UNIT - REGULAR WORKSHOPS, 2 UNITS - SCIENCE LABS, 2 UNITS - ICT LABS, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱19.8M | 100% | Medium risk39 | —-0.031 |
| 138 | 18DL0108CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF TVL AND OTHER WORKSHOPS, PISIPIS NHS (FORMERLY MAGALLANES NHS PISIPIS EXTENSION), 2 UNITS - REGULAR WORKSHOPS, 2 UNITS - SCIENCE LABS, 2 UNITS - ICT LABS, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱19.5M | 100% | Medium risk39 | —-0.031 |
| 139 | 20DL0223CY 2020 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 2STY4CL MUNICIPAL SECTOR ES, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱15M | 100% | Medium risk39 | —-0.032 |
| 140 | 18DL0094CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF TVL AND OTHER WORKSHOPS, COGORIN IBABA NATIONAL HIGH SCHOOL - JONGO EXTENSION, 2 UNITS - UNIQUE WORKSHOPS, 2 UNITS - REGULAR WORKSHOPS, 2 UNITS - SCIENCE LABS, 2 UNITS - ICT LABS, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱25.6M | 100% | Medium risk39 | —-0.028 |
| 141 | 20DL0081D. LOCAL PROGRAM 3. LOCAL INFRASTRUCTURE PROGRAM BUILDINGS AND OTHER STRUCTURES 3. LOCAL ROADS AND BRIDGES 1. LOCAL ROADS 2. CONSTRUCTION OF LOCAL ROAD, BRGY. SAN ROQUE, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱2.9M | 100% | Medium risk38 | —-0.066 |
| 142 | 22ED0133CONSTRUCTION/IMPROVEMENT/REHABILITATION/COMPLETION OF VARIOUS MULTI - PURPOSE BUILDINGS (COVERED COURT, BRGY. HALL, EVACUATION CENTER), SOCORRO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱19.2M | 100% | Medium risk37 | —-0.086 |
| 143 | 18ED0117CONSTRUCTION OF 2 UNITS 2 STOREY ICT LAB, 2 STOREY SCI LAB AT LEANDRO PANGANIBAN SR. TAGUMPAY HIGH SCHOOL, POLA, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱18.6M | 100% | Medium risk37 | —-0.045 |
| 144 | 18ED0136CONSTRUCTION OF 2 UNITS 2 STOREY ICT LAB, 2 STOREY SCI LAB AT MATULATULA HIGH SCHOOL, POLA, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱17.7M | 100% | Medium risk37 | —-0.046 |
| 145 | 21ED0114CONSTRUCTION OF MULTI - PURPOSE BUILDING (ISOLATION FACILITIES), POLA, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱11.8M | 100% | Medium risk36 | —-0.086 |
| 146 | 19DL0076C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 1. CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS 17. ACCESS ROAD LEADING TO LAMESANG BATO, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱3.8M | 100% | Medium risk34 | —-0.102 |
| 147 | 20DL0027C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 1. CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS 5. ACCESS ROAD LEADING TO LIMBON LIMBON FALLS, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱1.9M | 100% | Medium risk33 | —-0.067 |
| 148 | 25DL0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY CAPULUAN TULON, GUINAYANGAN, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱2.9M | 100% | Low risk26 | —-0.071 |
| 149 | 19DL0079CLUSTER VIIIA. I. OPERATIONS D. LOCAL PROGRAM 3. LOCAL INFRASTRUCTURE PROGRAM B. LOCAL ROAD AND BRIDGES 2. LOCAL BRIDGES 3. REHABILITATION OF LOCAL BRIDGE, BRGY. GUINUANGAN, LOPEZ, QUEZON B. I. OPERATIONS D. LOCAL PROGRAM 3. LOCAL INFRASTRUCTURE PROGRA | Region IV-A | Quezon 4th DEO | Completed | ₱2.9M | 100% | Low risk26 | —-0.062 |
| 150 | 24DL0073ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES 2. COMETA BR. (B00034AB) ALONG QUEZON-ALABAT-PEREZ RD | Region IV-A | Quezon 4th DEO | Completed | ₱4.3M | 100% | Low risk26 | —-0.066 |