88 projects on file, including joint ventures this contractor is part of.
Total projects
88
Total budget
₱1.2B
Average progress
95.1%
Completion rate
88.6%
Average risk score
40.8
Medium risk on average, out of 100
Flagged as unusual
6
6.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 88 | ₱1.2B | 40.8 | 6 | 95.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 48 | ₱487.9M | 35.8 | 0 | 97.9% |
| Buildings and Facilities | 14 | ₱208.7M | 35.6 | 0 | 92.9% |
| Bridges | 11 | ₱194.1M | 38.7 | 0 | 100.0% |
| Flood Control and Drainage | 9 | ₱196M | 48.4 | 2 | 100.0% |
| GAA 2025 SSP | 4 | ₱33.9M | 96.6 | 4 | 41.5% |
| OTHER | 1 | ₱9.8M | 79.9 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱23.7M | 48.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BD0097SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LOCAL ROAD, BARANGAY SALAMAGUE, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.9M | 18% | High risk97 | Flagged0.032 |
| 25BD0101SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LOCAL ROAD, BARANGAY CADAANAN, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.9M | 73% | High risk97 | Flagged0.013 |
| 25BD0040SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LOCAL ROAD, BARANGAY BANTAY, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.8M | 24% | High risk97 | Flagged0.028 |
| 25BD0065SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY CADAANAN, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱19.4M | 51% | High risk96 | Flagged0.024 |
| 24BD0019CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) MADDARULUG TO CADAANAN ROAD LEADING TO ECOTOURISM PARK, SOLANA, CAGAYAN - PACKAGE 2 | Region II | Cagayan 3rd DEO | Completed | ₱9.8M | 100% | High risk80 | —-0.028 |
| 17B00039MFO 1: NAT'L ROAD NETWORK SERVICES: CONST'N AND MAINTENANCE OF BRIDGES ALONG NAT'L ROADS REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES PRIMARY REHABILITATION/MAJOR REPAIR OF BRIDGE, BUNTUN BRIDGE (B01926LZ), ALONG CAGAYAN-APAYAO ROAD, K0486+280, TUGUEG | Region II | Region II | Completed | ₱125.4M | 100% | High risk67 | —-0.005 |
| 17BD0018MFO2: CONSTRUCTION OF MINANGA NORTE FLOOD CONTROL SYSTEM (DOWNSTREAM), STA. 0+221-STA. 0+382, MINANGA NORTE, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱42M | 100% | High risk65 | —-0.034 |
| 17BD0028MF02: CONSTRUCTION OF MINANGA NORTE FLOOD CONTROL SYSTEM (UPSTREAM) STA. 0+000 TO STA. 0+(-) 143.6, MINANGA NORTE, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱41.6M | 100% | High risk65 | —-0.037 |
| 17BD0052MFO1: CONST. OF DRAINAGE STRUCTURE ALONG NAT'L. RD., CVR RGCRN, S00707LZ CHAINAGE 920-CHAINAGE 1434 W/ EXCEPTION; S00712LZ CHAINAGE 000-CHAINAGE 363, CVR RGCRN, CARIG SUR, TUG. CITY, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱11.7M | 100% | High risk64 | —-0.053 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BD0097SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LOCAL ROAD, BARANGAY SALAMAGUE, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.9M | 18% | High risk97 | Flagged0.032 |
| 25BD0040SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LOCAL ROAD, BARANGAY BANTAY, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.8M | 24% | High risk97 | Flagged0.028 |
| 25BD0065SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY CADAANAN, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱19.4M | 51% | High risk96 | Flagged0.024 |
| 25BD0101SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LOCAL ROAD, BARANGAY CADAANAN, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.9M | 73% | High risk97 | Flagged0.013 |
| 17BD0062REPAIR/RESTORATION OF FLOOD CONTROL PROJECT, BRGY. SAN VICENTE, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱10.2M | 100% | Medium risk53 | Flagged0.003 |
| 17BD0063REPAIR/RESTORATION OF FLOOD CONTROL PROJECT, BRGY. MINANGA, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱6.9M | 100% | Medium risk51 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25BD0097SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LOCAL ROAD, BARANGAY SALAMAGUE, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.9M | 18% | High risk97 | Flagged0.032 |
| 2 | 25BD0101SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LOCAL ROAD, BARANGAY CADAANAN, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.9M | 73% | High risk97 | Flagged0.013 |
| 3 | 25BD0040SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LOCAL ROAD, BARANGAY BANTAY, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.8M | 24% | High risk97 | Flagged0.028 |
| 4 | 25BD0065SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY CADAANAN, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱19.4M | 51% | High risk96 | Flagged0.024 |
| 5 | 24BD0019CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) MADDARULUG TO CADAANAN ROAD LEADING TO ECOTOURISM PARK, SOLANA, CAGAYAN - PACKAGE 2 | Region II | Cagayan 3rd DEO | Completed | ₱9.8M | 100% | High risk80 | —-0.028 |
| 6 | 17B00039MFO 1: NAT'L ROAD NETWORK SERVICES: CONST'N AND MAINTENANCE OF BRIDGES ALONG NAT'L ROADS REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES PRIMARY REHABILITATION/MAJOR REPAIR OF BRIDGE, BUNTUN BRIDGE (B01926LZ), ALONG CAGAYAN-APAYAO ROAD, K0486+280, TUGUEG | Region II | Region II | Completed | ₱125.4M | 100% | High risk67 | —-0.005 |
| 7 | 17BD0018MFO2: CONSTRUCTION OF MINANGA NORTE FLOOD CONTROL SYSTEM (DOWNSTREAM), STA. 0+221-STA. 0+382, MINANGA NORTE, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱42M | 100% | High risk65 | —-0.034 |
| 8 | 17BD0028MF02: CONSTRUCTION OF MINANGA NORTE FLOOD CONTROL SYSTEM (UPSTREAM) STA. 0+000 TO STA. 0+(-) 143.6, MINANGA NORTE, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱41.6M | 100% | High risk65 | —-0.037 |
| 9 | 17BD0052MFO1: CONST. OF DRAINAGE STRUCTURE ALONG NAT'L. RD., CVR RGCRN, S00707LZ CHAINAGE 920-CHAINAGE 1434 W/ EXCEPTION; S00712LZ CHAINAGE 000-CHAINAGE 363, CVR RGCRN, CARIG SUR, TUG. CITY, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱11.7M | 100% | High risk64 | —-0.053 |
| 10 | 21BC0145CSSP-CONST/IMPRVT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY (TIKAS PROGRAM)-CONSTRUCTION OF MULTIPURPOSE BUILDING WITH FIRING RANGE, ABULUG, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱34.3M | 100% | Medium risk60 | —-0.047 |
| 11 | 21BD0109LOCAL PROGRAM - NATIONAL BUILDING PROGRAM- BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - CONSTRUCTION OF PHILIPPINE INFORMATION AGENCY, REGIONAL OFFICE II BUILDING, REGIONAL GOVERNMENT CENTER, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱24.6M | 100% | Medium risk54 | —-0.079 |
| 12 | 24BD0226BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE FACILITY, AMULUNG MUNICIPAL SPORTS CENTER, AMULUNG, CAGAYAN- PHASE II | Region II | Cagayan 3rd DEO | On-Going | ₱19.8M | 0% | Medium risk53 | —-0.010 |
| 13 | 17BD0062REPAIR/RESTORATION OF FLOOD CONTROL PROJECT, BRGY. SAN VICENTE, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱10.2M | 100% | Medium risk53 | Flagged0.003 |
| 14 | 17BD0075MF01: CONSTRUCTION AND MAINTENANCE ALONG NAT'L. ROADS, REHAB./MAJOR REPAIR OF PERMANENT BRIDGES, CALLILUAN BRIDGE (B04325LZ) ALONG GADU-CARILUCUD-NABBOTUAN-PALAO-MACUTAY ROAD, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱5.2M | 100% | Medium risk52 | —-0.027 |
| 15 | 17BD0063REPAIR/RESTORATION OF FLOOD CONTROL PROJECT, BRGY. MINANGA, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱6.9M | 100% | Medium risk51 | Flagged0.002 |
| 16 | 21BD0089LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL BRIDGES - CONSTRUCTION OF VARIOUS LOCAL BRIDGES, PEÑABLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱14.4M | 100% | Medium risk50 | —-0.046 |
| 17 | 21BB0014OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - REHABILITATION/MAJOR REPAIR - PARED BR. (B0108LZ) ALONG CAGAYAN VALLEY ROAD, ALCALA, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱31.4M | 100% | Medium risk50 | —-0.039 |
| 18 | 19BD0092ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT-ROAD WIDENING - TERTIARY ROADS,CAGAYAN APAYAO ROAD, K0508+943 - K0513+000 | Region II | Cagayan 3rd DEO | Completed | ₱63.1M | 100% | Medium risk50 | —-0.070 |
| 19 | 19BD0046ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CABULUAN BR. (B04778LZ) ALONG KALINGA-CAGAYAN ROAD,(CALANAN-ENRILE SECTION), | Region II | Cagayan 3rd DEO | Completed | ₱5.2M | 100% | Medium risk49 | —-0.049 |
| 20 | 19BD0054WATER MANAGEMENT FACILITIES - WATER SUPPLY - CONSTRUCTION/REPAIR / REHABILITATION /IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONSTRUCTION/ REHABILITATION/IMPROVEMENTOF LEVEL III WATER SUPPLY | Region II | Cagayan 3rd DEO | Completed | ₱23.7M | 100% | Medium risk48 | —-0.042 |
| 21 | 20BD0012CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS -MADDARULUG TO CADAANAN ROAD LEADING TO ECOTOURISM PARK, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱14.5M | 100% | Medium risk48 | —-0.080 |
| 22 | 19BD0052PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION OF FACILITIES WITHIN MAJOR BASINS AND PRINCIPLE RIVERS CAGAYAN RIVER FLOOD MANAGEMENT PROJECTS, MINANGA SUR, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱49.9M | 100% | Medium risk48 | —-0.052 |
| 23 | 18BD0086NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT TERTIARY ROADS, CAGAYAN APAYAO ROAD, K0489+625 - K0489+655BS, K0489+686 - K0491+480LS, K0489+686 - K0491+300RS, K0491,SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱18.8M | 100% | Medium risk48 | —-0.084 |
| 24 | 23BD0013CSSP-CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - MADDARULUG TO CADAANAN ROAD LEADING TO ECOTOURISM PARK, SOLANA, CAGAYAN, PACKAGE II | Region II | Cagayan 3rd DEO | Completed | ₱14.6M | 100% | Medium risk48 | —-0.084 |
| 25 | 22BD0006CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - MADDARULUG TO CADAANAN ROAD LEADING TO ECOTOURISM PARK, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱14.7M | 100% | Medium risk48 | —-0.081 |