Contractor dossier
103 projects on file, including joint ventures this contractor is part of.
Total projects
103
Total budget
₱3.4B
Average progress
97.0%
Completion rate
87.4%
Average risk score
55.8
Medium risk on average, out of 100
Flagged as unusual
3
2.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 103 | ₱3.4B | 55.8 | 3 | 97.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Bridges | 64 | ₱1.5B | 52.0 | 1 | 99.8% |
| Roads | 14 | ₱664.3M | 55.7 | 0 | 96.0% |
| Flood Control and Drainage | 13 | ₱682.9M | 49.7 | 0 | 100.0% |
| OTHER | 4 | ₱106.8M | 71.8 | 0 | 100.0% |
| GAA 2025 OO-2 | 3 | ₱201M | 89.8 | 0 | 69.1% |
| GAA 2025 SSP | 2 | ₱37.6M | 94.3 | 1 | 70.7% |
| GAA 2025 OO-1 | 2 | ₱133.6M | 94.3 | 1 | 52.0% |
| Bridges, Roads | 1 | ₱88.9M | 57.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25FG0040CONSTRUCTION OF BRIDGE, BARANGAY PILI TABIGUIAN, BARANGAY BAGCONG AND BARANGAY ANTOLON, CARAMOAN, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱14.1M | 99% | High risk94 | —-0.007 |
| 25FG0007CONSTRUCTION OF MISSING LINKS/NEW ROADS, MANAGNAG (TIGAON-GOA-SN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROAD) HIMANAG ROAD, CAMARINES SUR, LAGONOY, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱65.4M | 70% | High risk94 | —-0.001 |
| 25FG0042REHABILITATION OF ROAD WITH DRAINAGE CANAL, MALAGUAS ST.-QUEZON ST., BARANGAY POBLACION, TIGAON, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱23.5M | 42% | High risk94 | Flagged0.012 |
| 25FG0074ROAD WIDENING ALONG PILI-TIGAON-ALBAY BDRY RD.K0473+847 - K0474+918K0475+144 - K0476+058TIGAON, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱68.3M | 34% | High risk94 | Flagged0.010 |
| 25F00151ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BICO | Region V | Region V | On-Going | ₱144.9M | 98% | High risk93 | —-0.008 |
| 25FG0065CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BAHAY RIVER, (UPSTREAM OF BAHAY BRIDGE) PACKAGE 2, CARAMOAN, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱37M | 48% | High risk88 | —-0.011 |
| 25FG0047CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BARANGAY SAN ISIDRO, TINAMBAC, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱19M | 62% | High risk88 | —-0.012 |
| 22FG0015CONSTRUCTION OF BY PASS AND DIVERSION ROAD, JCT. NATO - SABANG COASTAL ROAD (TAGAS BRIDGE 2) CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱49M | 100% | High risk78 | —-0.035 |
| 17FF0084CONSTRUCTION AND MAINTENANCE OF BRIDGE ALONG NATIONAL ROADS, CONSTRUCTION OF NEW PERMANENT BRIDGE, NALAYAHAN BRIDGE ALONG TINAMBAC-SIRUMA ROAD, NALAYAHAN, SIRUMA, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱45.7M | 100% | High risk77 | —-0.034 |
| 22FG0022REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGE, TERES BRIDGE (B0188LZ) ALONG TIGAON-GOA-SAN JOSE-LAGONOY VIA SAN VICENTE ROAD BARANGAY SAN VICENTE, GARCHITORENA, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱7.6M | 100% | High risk76 | —-0.034 |
| 18F00035OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS, SAN PASCUAL-CLAVERIA ROAD, BURIAS ISLAND, MASBATE | Region V | Region V | Completed | ₱157.2M | 100% | High risk70 | —-0.079 |
| 20FO0062WIDENING OF PERMANENT BRIDGES - AGOS BRIDGE (B00279LZ) ALONG DAANG MAHARLIKA (LZ) | Region V | Albay 3rd DEO | On-Going | ₱92.8M | 93% | High risk68 | Flagged0.008 |
| 17FB0002REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4) COMUN-INARADO-PENAFRANCIA ROAD K0523+995-K0525+127, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱16.8M | 100% | High risk67 | —-0.067 |
| 20F00006OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES-PAWILI BRIDGE (B00451LZ) ALONG DAANG MAHARLIKA (LZ), BULA, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱101.3M | 100% | High risk65 | —-0.050 |
| 17FG0085WIDENING OF BRIDGE-SAN FRANCISCO BRIDGE (B00453LZ) ALONG DAANG MAHARLIKA (LZ), BAAO, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱55M | 100% | High risk63 | —-0.035 |
| 23FG0001CONSTRUCTION OF MISSING LINK / NEW ROAD, MANAGNAG (TIGAON-GOA-SAN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROAD), HIMANAG ROAD, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱91.7M | 100% | High risk61 | —-0.090 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25FG0042REHABILITATION OF ROAD WITH DRAINAGE CANAL, MALAGUAS ST.-QUEZON ST., BARANGAY POBLACION, TIGAON, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱23.5M | 42% | High risk94 | Flagged0.012 |
| 25FG0074ROAD WIDENING ALONG PILI-TIGAON-ALBAY BDRY RD.K0473+847 - K0474+918K0475+144 - K0476+058TIGAON, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱68.3M | 34% | High risk94 | Flagged0.010 |
| 20FO0062WIDENING OF PERMANENT BRIDGES - AGOS BRIDGE (B00279LZ) ALONG DAANG MAHARLIKA (LZ) | Region V | Albay 3rd DEO | On-Going | ₱92.8M | 93% | High risk68 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 22FG0014REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGE, RANGAS BRIDGE II (B02550LZ) ALONG SAN RAFAEL-MAMPIRAO-SAN JOSE ROAD, BARANGAY MAMPIRAO, SAN JOSE, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱4.6M | 100% | Medium risk57 | —-0.035 |
| 27 | 18FF0074FY-2018 CONSTRUCTION AND MAINTENANCE OF BRIDGE ALONG NATIONAL ROAD WIDENING OF PERMANENT BRIDGE, GINGAROY BRIDGE (B02382LZ) ALONG PILI-TIGAON-ALBAY BOUNDARY ROAD K0476+276.68 - K0476+318.21 TIGAON, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱65M | 100% | Medium risk56 | —-0.060 |
| 28 | 18FF0056FY-2018 CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, REPLACEMENT OF PERMANENT WEAK BRIDGE, OCINE BRIDGE, ALONG PILI - TIGAON - ALBAY BOUNDARY ROAD, K0475+020.00 - K0475+040.00 SITIO OCINE, PANAGAN, TIGAON, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱66.1M | 100% | Medium risk56 | —-0.060 |
| 29 | 24FG0052CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, JCT. NATO-SABANG COASTAL ROAD, TELEGRAPO BRIDGE PHASE-I, CAMARINES SUR, SAN JOSE, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱67.6M | 100% | Medium risk56 | —-0.061 |
| 30 | 24FG0082CONSTRUCTION OF TINAWAGAN - LIBOD BRIDGE, TIGAON, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱57.9M | 100% | Medium risk56 | —-0.060 |
| 31 | 17FG0055INDV. PROJ. - WIDENING OF BRIDGE - AGDANGAN BRIDGE (B0045LZ) ALONG DAANG MAHARLIKA(LZ), BAAO, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱18.3M | 100% | Medium risk56 | —-0.038 |
| 32 | 21FG0021CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG PANAGAN RIVERSECTION 1: STA.0+000.00 - STA.0+282.50SECTION 2: STA.0+351.30 - STA.0+667.55TIGAON, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱91.7M | 100% | Medium risk55 | —-0.077 |
| 33 | 22FG0028CONSTRUCTION OF BY-PASS AND DIVERSION ROAD, JCT. NATO-SABANG COASTAL ROAD TAGAS AND CALALAHAN SECTIONSECTION 1: STA. 4+210.00-STA. 4+376.00SECTION 2: STA. 4+417.00-STA. 4+511.00SAN JOSE, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱49M | 100% | Medium risk55 | —-0.100 |
| 34 | 23FG0069WIDENING OF PERMANENT BRIDGE - BALIGUAN BRIDGE (B00479LZ) ALONG TIGAON-GOA-SAN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROAD, GOA, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱53.1M | 100% | Medium risk55 | —-0.064 |
| 35 | 17FF0083CONSTRUCTION AND MAINTENANCE OF BRIDGE ALONG NATIONAL ROADS REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE, BALIGUAN BRIDGE (B00479LZ) ALONG TIGAON-GOA-SAN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROAD, MATACLA, GOA, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱13.8M | 100% | Medium risk55 | —-0.036 |
| 36 | 18FG0064REHABILITATION/MAJOR REPAIR OF BRIDGE, MAMPUAG BRIDGE (B00467LZ) ALONG NABUA-BALATAN ROAD, NABUA, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱47M | 100% | Medium risk54 | —-0.064 |
| 37 | 22FN0087RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES SALVACION BR. (B04902LZ) ALONG NABUA-BATO-LIBON (TANDAAY-BULUANG, BATO) RD | Region V | Camarines Sur 5th DEO | Completed | ₱9.2M | 100% | Medium risk54 | —-0.063 |
| 38 | 20FG0002REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG PILI-TIGAON-ALBAY BOUNDARY ROADK0488+705 - K0488+810K0488+853 - K0489+126K0497+660 - K0497+740SAGÑAY, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱46.5M | 100% | Medium risk54 | —-0.101 |
| 39 | 20FG0060CONSTRUCTION OF FLOOD CONTROL DIKE ALONG PARUBCAN RIVERSECTION 1 : STA.0+200.00 - STA.0+275.00 TOSECTION 4 : STA.0+080.00 - STA.0+310.00BRGY. STA. MARIA AND PILI, PRESENTACION, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱77.2M | 100% | Medium risk54 | —-0.083 |
| 40 | 25FG0023REHABILITATION OF BRIDGE, BARANGAY PANIMAN, CARAMOAN, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱9.6M | 100% | Medium risk53 | —-0.042 |
| 41 | 24F00183ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG GENORANGAN RIVER, LAGONOY, C | Region V | Region V | Completed | ₱87.3M | 100% | Medium risk53 | —-0.079 |
| 42 | 21FG0033REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE, BAHAY BRIDGE (B04266LZ) ALONG TIGAON-GOA-SAN JOSE-LAGONOY VIA SAN VICENTE ROAD K0566+118.00 - K0566+173.00BARANGAY BAHAY, CARAMOAN, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱16.7M | 100% | Medium risk53 | —-0.064 |
| 43 | 18FF0060FY 2018 - ASSET PRESERVATION OF NAT'L ROADS - REHAB/RECONST/UPGRADING OF DAMAGED PAVED NAT'L ROADS INCL. DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HDM4 ALONG PILI-TIGAON-ALBAY BOUNDARY ROAD, PANAGAN, SALVACION AND POBLACION, TIGAON, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱32.2M | 100% | Medium risk53 | —-0.100 |
| 44 | 21FG0010REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE, PILI BRIDGE (B01895LZ) ALONG TIGAON-GOA-SAN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROAD K0554+182.00 - K0557+224.00TABIGUIAN, CARAMOAN, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱7.4M | 100% | Medium risk53 | —-0.062 |
| 45 | 20FG0024WIDENING OF PERMANENT BRIDGE, BALANGAO BRIDGE (BO2379LZ) ALONG PILI-TIGAON-ALBAY BOUNDARY ROADK0473+(-912.30) - K0473+(-889.70)MABALODBALOD, TIGAON, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱27.9M | 100% | Medium risk53 | —-0.063 |
| 46 | 23FG0056REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG PRESENTACION - MALIGAYA ROAD K0540+015.00 - K0541+000.00, PRESENTACION, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱29.4M | 100% | Medium risk53 | —-0.100 |
| 47 | 25FG0006REHABILITATION OF BRIDGE, BARANGAY SANTO NINO, SAGNAY, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱4.8M | 100% | Medium risk53 | —-0.063 |
| 48 | 21FG0028REHABILITATION/MAJOR REPAIR OF BRIDGE, IGOT BRIDGE (B02389LZ) ALONG PILI-ALBAY BOUNDARY ROAD, K0503+096.00 - K0503+110.00, PATITINAN, SAGNAY, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱8.9M | 100% | Medium risk53 | —-0.064 |
| 49 | 25FG0021RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE, TONGKIG BR. (B00515LZ) ALONG JCT. BINALAY-(TINAMBAC)-TAMBAN RD. TINAMBAC, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱7.1M | 100% | Medium risk52 | —-0.062 |
| 50 | 21FG0024RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE, BATAAN BRIDGE (B00513LZ) ALONG JCT. BINALAY (TINAMBAC) - TAMBAN ROADK0519+371.00 - K0519+384.00BARANGAY BATAAN, TINAMBAC, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱6.3M | 100% | Medium risk52 | —-0.062 |