Contractor dossier
103 projects on file, including joint ventures this contractor is part of.
Total projects
103
Total budget
₱3.4B
Average progress
97.0%
Completion rate
87.4%
Average risk score
55.8
Medium risk on average, out of 100
Flagged as unusual
3
2.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 103 | ₱3.4B | 55.8 | 3 | 97.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Bridges | 64 | ₱1.5B | 52.0 | 1 | 99.8% |
| Roads | 14 | ₱664.3M | 55.7 | 0 | 96.0% |
| Flood Control and Drainage | 13 | ₱682.9M | 49.7 | 0 | 100.0% |
| OTHER | 4 | ₱106.8M | 71.8 | 0 | 100.0% |
| GAA 2025 OO-2 | 3 | ₱201M | 89.8 | 0 | 69.1% |
| GAA 2025 SSP | 2 | ₱37.6M | 94.3 | 1 | 70.7% |
| GAA 2025 OO-1 | 2 | ₱133.6M | 94.3 | 1 | 52.0% |
| Bridges, Roads | 1 | ₱88.9M | 57.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25FG0040CONSTRUCTION OF BRIDGE, BARANGAY PILI TABIGUIAN, BARANGAY BAGCONG AND BARANGAY ANTOLON, CARAMOAN, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱14.1M | 99% | High risk94 | —-0.007 |
| 25FG0007CONSTRUCTION OF MISSING LINKS/NEW ROADS, MANAGNAG (TIGAON-GOA-SN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROAD) HIMANAG ROAD, CAMARINES SUR, LAGONOY, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱65.4M | 70% | High risk94 | —-0.001 |
| 25FG0042REHABILITATION OF ROAD WITH DRAINAGE CANAL, MALAGUAS ST.-QUEZON ST., BARANGAY POBLACION, TIGAON, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱23.5M | 42% | High risk94 | Flagged0.012 |
| 25FG0074ROAD WIDENING ALONG PILI-TIGAON-ALBAY BDRY RD.K0473+847 - K0474+918K0475+144 - K0476+058TIGAON, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱68.3M | 34% | High risk94 | Flagged0.010 |
| 25F00151ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BICO | Region V | Region V | On-Going | ₱144.9M | 98% | High risk93 | —-0.008 |
| 25FG0065CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BAHAY RIVER, (UPSTREAM OF BAHAY BRIDGE) PACKAGE 2, CARAMOAN, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱37M | 48% | High risk88 | —-0.011 |
| 25FG0047CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BARANGAY SAN ISIDRO, TINAMBAC, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱19M | 62% | High risk88 | —-0.012 |
| 22FG0015CONSTRUCTION OF BY PASS AND DIVERSION ROAD, JCT. NATO - SABANG COASTAL ROAD (TAGAS BRIDGE 2) CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱49M | 100% | High risk78 | —-0.035 |
| 17FF0084CONSTRUCTION AND MAINTENANCE OF BRIDGE ALONG NATIONAL ROADS, CONSTRUCTION OF NEW PERMANENT BRIDGE, NALAYAHAN BRIDGE ALONG TINAMBAC-SIRUMA ROAD, NALAYAHAN, SIRUMA, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱45.7M | 100% | High risk77 | —-0.034 |
| 22FG0022REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGE, TERES BRIDGE (B0188LZ) ALONG TIGAON-GOA-SAN JOSE-LAGONOY VIA SAN VICENTE ROAD BARANGAY SAN VICENTE, GARCHITORENA, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱7.6M | 100% | High risk76 | —-0.034 |
| 18F00035OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS, SAN PASCUAL-CLAVERIA ROAD, BURIAS ISLAND, MASBATE | Region V | Region V | Completed | ₱157.2M | 100% | High risk70 | —-0.079 |
| 20FO0062WIDENING OF PERMANENT BRIDGES - AGOS BRIDGE (B00279LZ) ALONG DAANG MAHARLIKA (LZ) | Region V | Albay 3rd DEO | On-Going | ₱92.8M | 93% | High risk68 | Flagged0.008 |
| 17FB0002REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4) COMUN-INARADO-PENAFRANCIA ROAD K0523+995-K0525+127, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱16.8M | 100% | High risk67 | —-0.067 |
| 20F00006OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES-PAWILI BRIDGE (B00451LZ) ALONG DAANG MAHARLIKA (LZ), BULA, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱101.3M | 100% | High risk65 | —-0.050 |
| 17FG0085WIDENING OF BRIDGE-SAN FRANCISCO BRIDGE (B00453LZ) ALONG DAANG MAHARLIKA (LZ), BAAO, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱55M | 100% | High risk63 | —-0.035 |
| 23FG0001CONSTRUCTION OF MISSING LINK / NEW ROAD, MANAGNAG (TIGAON-GOA-SAN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROAD), HIMANAG ROAD, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱91.7M | 100% | High risk61 | —-0.090 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25FG0042REHABILITATION OF ROAD WITH DRAINAGE CANAL, MALAGUAS ST.-QUEZON ST., BARANGAY POBLACION, TIGAON, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱23.5M | 42% | High risk94 | Flagged0.012 |
| 25FG0074ROAD WIDENING ALONG PILI-TIGAON-ALBAY BDRY RD.K0473+847 - K0474+918K0475+144 - K0476+058TIGAON, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱68.3M | 34% | High risk94 | Flagged0.010 |
| 20FO0062WIDENING OF PERMANENT BRIDGES - AGOS BRIDGE (B00279LZ) ALONG DAANG MAHARLIKA (LZ) | Region V | Albay 3rd DEO | On-Going | ₱92.8M | 93% | High risk68 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 24FG0074CONSTRUCTION OF SALVACION - GINGAROY BRIDGE,TIGAON, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱4.9M | 100% | Medium risk51 | —-0.066 |
| 77 | 21FG0029OFF-CARRIAGEWAY IMPROVEMENT ALONG JCT. DIGDIGON (GOA) - TINAMBAC ROADSECTION 1: K0502+269.00 - K0502+815.70 (B/S)SECTION 2: K0502+815.70 - K0503+121.00 (L/S)SECTION 3: K0503+121.00 - K0503+241.00 (B/S)TINAMBAC, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱9.8M | 100% | Medium risk51 | —-0.101 |
| 78 | 23FG0011CONSTRUCTION OF BRIDGE ALONG TAYTAY-AMOGUIS INTERJURISDICTIONAL ACCESS ROADLAGONOY, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱9.9M | 100% | Medium risk51 | —-0.065 |
| 79 | 25FG0013REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE, PANAGAN BR (B02380LZ) ALONG PILI-TIGAON-ALBAY BNDRY RD. TIGAON, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱23.7M | 100% | Medium risk51 | —-0.066 |
| 80 | 19FF0079CY-2019 BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGE, SAN ANTONIO BRIDGE 3 (B00478LZ) ALONG TIGAON-GOA-SAN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROADK0482+208.00 - K0482+214BARANGAY SAN ANTONIO, TIGAON, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱13M | 100% | Medium risk51 | —-0.065 |
| 81 | 19FF0078CY-2019 BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGE, SAN ANTONIO BRIDGE 2 (B00477LZ) ALONG TIGAON-GOA-SAN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROADK0481+639.00 - K0481+645BARANGAY SAN ANTONIO, TIGAON, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱13M | 100% | Medium risk51 | —-0.065 |
| 82 | 24FG0025CONSTRUCTION OF BRIDGE ALONG COYAOYAO - CABALINADAN ROAD, TIGAON, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱5M | 100% | Medium risk51 | —-0.063 |
| 83 | 22FG0001OFF-CARRIAGEWAY ALONG LAGONOY - PRESENTACION ROAD, K0504+000.00 - K0504+924.00 LAGONOY, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱14.7M | 100% | Medium risk51 | —-0.102 |
| 84 | 22F00077OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES-PAWILI BR. (B004517LZ) ALONG DAANG MAHARLIKA (LZ)(PHASE II), BULA, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱19.3M | 100% | Medium risk51 | —-0.065 |
| 85 | 22FN0086RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES MALAWAG BR. (B04899LZ) ALONG NABUA-BATO-LIBON (TANDAAY-BULUANG, BATO) RD | Region V | Camarines Sur 5th DEO | Completed | ₱9.3M | 100% | Medium risk51 | —-0.063 |
| 86 | 22FN0085RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES STO. DOMINGO BR. (B00468LZ) ALONG NABUA-BALATAN RD | Region V | Camarines Sur 5th DEO | Completed | ₱9.3M | 100% | Medium risk51 | —-0.063 |
| 87 | 20FG0056REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG LAGONOY-PRESENTACION ROADSECTION 1 : K0511+000.00 - K0511+156SECTION 2 : K0511+473.00 - K0511+750PRESENTACION, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱12.6M | 100% | Medium risk51 | —-0.102 |
| 88 | 20FG0080CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE ALONG RANGAS RIVER SECTION 1: STA. 0+000-STA.0+050.00 SECTION 2: STA.0+000.00-STA.0+150.00 SECTION 3: STA.0+000.00-STA.0+080.00 PUGAY, SAN JOSE, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱47M | 100% | Medium risk50 | —-0.088 |
| 89 | 19FF0032CY-2019 CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALIWAG RIVERSECTION 1 ; STA.0+000.00 - STA.0+170.00SECTION 2 : STA.0+285.00 - STA.0+550.00SITIO BALIWAG, BURABOD, LAG | Region V | Camarines Sur 4th DEO | Completed | ₱23.3M | 100% | Medium risk49 | —-0.087 |
| 90 | 19FF0029CY-2019 CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SALVACION RIVERSTA.0+000.00 - STA.0+674.00SALVACION, CARAMOAN, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱37.2M | 100% | Medium risk49 | —-0.087 |
| 91 | 21FG0053CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KULASI RIVERSECTION 1: STA.0+045.00 - STA.0+155.00 (PCCP & RCBC)SECTION 2: STA.0+000.00 - STA.0+150.00 (UPSTREAM)SECTION 3: STA.0+000.00 - STA.0+128.00 (DOWNSTREAM)SAN ROQUE, LAGONOY, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.086 |
| 92 | 17FH0070CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, REPLACEMENT OF PERMANENT WEAK BRIDGE, DORORIAN BRIDGE (B00058CN) ALONG BARAS-GIGMOTO-VIGA ROAD, GIGMOTO, CATANDUANES | Region V | Catanduanes DEO | Completed | ₱39.2M | 100% | Medium risk48 | —-0.028 |
| 93 | 19FF0052CY-2019 CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG RANGAS RIVER,SECTION 1 : STA.0+000.00 - STA.0+201.30 TOSECTION 3 : STA.0+000.00 - STA.0+393.46 CATAGBACAN, GOA, CAM. SUR | Region V | Camarines Sur 4th DEO | Completed | ₱31.8M | 100% | Medium risk48 | —-0.088 |
| 94 | 22FN0021CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD STRUCTURE ALONG BICOL RIVER, UPSTREAM BACOLOD BRIDGE, LEFT SIDE, (STA.0+147-STA.0+600), BATO, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.088 |
| 95 | 22FG0062CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (SEAWALL) ALONG LAMIT BAY STA.0+000.00 - STA.0+678.00 BARANGAY SIPACO, LAGONOY, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.085 |
| 96 | 21FN0024CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BARIT RIVER, DOWNSTREAM OF MALIBAN BRIDGE, SAN ESTEBAN· STA. BARBARA SECTION, NABUA, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱35.4M | 100% | Medium risk47 | —-0.088 |
| 97 | 18FG0018CONSTRUCTION OF REVETMENT AND CHANNEL IMPROVEMENT AT BARIT RIVER OUTFALL(BULA AND NABUA SECTION), NABUA, CAM. SUR- STA. 0+(-025.00)-STA. 0+064 | Region V | Camarines Sur 5th DEO | Completed | ₱18.6M | 100% | Medium risk46 | —-0.088 |
| 98 | 21FG0016REHABILITATION/MAJOR OF REPAIR OF PERMANENT BRIDGE, ANKOLAN BRIDGE (B04169LZ) ALONG PRESENTACION - MALIGAYA ROADK0531+014.00 - K0531+045.00BARANGAY STA. MARIA, PRESENTACION, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱4.7M | 100% | Medium risk38 | —-0.065 |
| 99 | 23FG0059REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG PRESENTACION - ,ALIGAYA ROAD, K0529+000.00 - K0529+136.00, K0534+300.00 - K0534+400.00, PRESENTACION, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱4.4M | 100% | Medium risk38 | —-0.099 |
| 100 | 19FF0040CY-2019 BRIDGE -RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE, CARAMBOAN BRIDGE (B00514LZ) ALONG JCT. BINALAY (TINAMBAC) - TAMBAN ROAD, K0522+447.00 - K0522+549.60BANGA, TINAMBAC, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱4.2M | 100% | Medium risk34 | —-0.062 |