Opening the dossier…
Opening the dossier…
Contractor dossier
69 projects on file, including joint ventures this contractor is part of.
Total projects
69
Total budget
₱889.5M
Average progress
97.1%
Completion rate
53.6%
Below 70%
Average risk score
52.6
Medium risk on average, out of 100
Flagged as unusual
9
13.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 69 | ₱889.5M | 52.6 | 9 | 97.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 38 | ₱382M | 48.4 | 1 | 99.7% |
| Buildings and Facilities | 10 | ₱63.5M | 52.6 | 0 | 99.5% |
| Flood Control and Drainage | 5 | ₱209.7M | 51.6 | 0 | 100.0% |
| Bridges | 4 | ₱47.8M | 50.7 | 0 | 100.0% |
| Water Provision and Storage | 4 | ₱12.2M | 28.0 | 0 | 100.0% |
| OTHER | 3 | ₱27.3M | 77.3 | 3 | 100.0% |
| GAA 2025 SSP | 2 | ₱28.2M | 94.3 | 2 | 49.9% |
| GAA 2025 OO-1 | 2 | ₱72.2M | 92.4 | 2 | 73.5% |
| GAA 2025 OO-2 | 1 | ₱46.5M | 87.0 | 1 | 67.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PC0070CSSP- BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONTINUATION IMPROVEMENT OF CAGANDUNGAN-CALABIGAN ROAD, CALABIGAN, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱9.4M | 50% | High risk95 | Flagged0.023 |
| 25PC0071CSSP - BASIC INFRASTRUCTURE PROGRAM(BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL, SITIO CASSIGGAMAN, BARANGAY STA. FILOMENA, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱18.8M | 50% | High risk94 | Flagged0.026 |
| 25PC0011OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- REHAB/RECONS OF ROADS W/ SLIPS,SLOPES COLLAPSE,& LANDSLIDE-TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO RD-K0626+605-K0626+670,K0628+513- K0628+577,K0634+554-K0634+600, K0635+343-K0 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱42M | 76% | High risk93 | Flagged0.006 |
| 25PC0039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - APAYAO-ILOCOS NORTE RD- K0650+700 - K0650+737, K065 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱30.2M | 71% | High risk92 | Flagged0.004 |
| 25PC0051OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS - FLOOD MNGT PROG-CON/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF CABICUNGAN RIVER BASIN FLOOD CONTROL STRUCTURE,DAPPAY SECTION, STA.12+090-STA.12+410(L/S),CAL | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱46.5M | 67% | High risk87 | Flagged0.005 |
| 24PB0022ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS,SLOPE COLLAPSE, AND LADNSLIDE-SECONDARY ROADS, KABUGAO-PUDTOL-LUNA-CAGAYAN BRDY RD -K0591+968-K0591+988 | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱6.2M | 100% | High risk79 | Flagged0.006 |
| 23PC0076CONCRETING/IMPROVEMENT OF SITIO BANAN, BRGY. ELEAZAR FMR, BRGY. ELEAZAR, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱11.6M | 100% | High risk76 | Flagged0.021 |
| 25PC0031CSSP-CONS/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES & ECONOMIC ZONES(ROADS LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRA PROG-ROLL-IT)-STA.FILOMENA ROAD IN SUPPORT OF MULTI-CROP PROCESSING CENTER(COFFEE,CACAO,PINEAPPLE,COCONUT)FURNITURE | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱9.5M | 100% | High risk76 | Flagged0.002 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PC0071CSSP - BASIC INFRASTRUCTURE PROGRAM(BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL, SITIO CASSIGGAMAN, BARANGAY STA. FILOMENA, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱18.8M | 50% | High risk94 | Flagged0.026 |
| 25PC0070CSSP- BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONTINUATION IMPROVEMENT OF CAGANDUNGAN-CALABIGAN ROAD, CALABIGAN, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱9.4M | 50% | High risk95 | Flagged0.023 |
| 23PC0076CONCRETING/IMPROVEMENT OF SITIO BANAN, BRGY. ELEAZAR FMR, BRGY. ELEAZAR, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱11.6M | 100% | High risk76 | Flagged0.021 |
| 23PC0075REHABILITATION AND CONCRETING OF LUROG-PANTAY-KALANGKUASAN-KAPANICKIAN FMR, BRGY ALLIG, FLORA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱19.4M | 94% | Medium risk58 | Flagged0.017 |
| 24PB0022ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS,SLOPE COLLAPSE, AND LADNSLIDE-SECONDARY ROADS, KABUGAO-PUDTOL-LUNA-CAGAYAN BRDY RD -K0591+968-K0591+988 | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱6.2M | 100% | High risk79 | Flagged0.006 |
| 25PC0011OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- REHAB/RECONS OF ROADS W/ SLIPS,SLOPES COLLAPSE,& LANDSLIDE-TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO RD-K0626+605-K0626+670,K0628+513- K0628+577,K0634+554-K0634+600, K0635+343-K0 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱42M | 76% | High risk93 | Flagged0.006 |
| 25PC0051OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS - FLOOD MNGT PROG-CON/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF CABICUNGAN RIVER BASIN FLOOD CONTROL STRUCTURE,DAPPAY SECTION, STA.12+090-STA.12+410(L/S),CAL | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱46.5M | 67% | High risk87 | Flagged0.005 |
| 25PC0039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - APAYAO-ILOCOS NORTE RD- K0650+700 - K0650+737, K065 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱30.2M | 71% | High risk92 | Flagged0.004 |
| 25PC0031CSSP-CONS/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES & ECONOMIC ZONES(ROADS LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRA PROG-ROLL-IT)-STA.FILOMENA ROAD IN SUPPORT OF MULTI-CROP PROCESSING CENTER(COFFEE,CACAO,PINEAPPLE,COCONUT)FURNITURE | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱9.5M | 100% | High risk76 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25PC0070CSSP- BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONTINUATION IMPROVEMENT OF CAGANDUNGAN-CALABIGAN ROAD, CALABIGAN, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱9.4M | 50% | High risk95 | Flagged0.023 |
| 2 | 25PC0071CSSP - BASIC INFRASTRUCTURE PROGRAM(BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL, SITIO CASSIGGAMAN, BARANGAY STA. FILOMENA, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱18.8M | 50% | High risk94 | Flagged0.026 |
| 3 | 25PC0011OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- REHAB/RECONS OF ROADS W/ SLIPS,SLOPES COLLAPSE,& LANDSLIDE-TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO RD-K0626+605-K0626+670,K0628+513- K0628+577,K0634+554-K0634+600, K0635+343-K0 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱42M | 76% | High risk93 | Flagged0.006 |
| 4 | 25PC0039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - APAYAO-ILOCOS NORTE RD- K0650+700 - K0650+737, K065 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱30.2M | 71% | High risk92 | Flagged0.004 |
| 5 | 25PC0051OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS - FLOOD MNGT PROG-CON/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF CABICUNGAN RIVER BASIN FLOOD CONTROL STRUCTURE,DAPPAY SECTION, STA.12+090-STA.12+410(L/S),CAL | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱46.5M | 67% | High risk87 | Flagged0.005 |
| 6 | 24PB0022ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS,SLOPE COLLAPSE, AND LADNSLIDE-SECONDARY ROADS, KABUGAO-PUDTOL-LUNA-CAGAYAN BRDY RD -K0591+968-K0591+988 | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱6.2M | 100% | High risk79 | Flagged0.006 |
| 7 | 23PC0076CONCRETING/IMPROVEMENT OF SITIO BANAN, BRGY. ELEAZAR FMR, BRGY. ELEAZAR, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱11.6M | 100% | High risk76 | Flagged0.021 |
| 8 | 25PC0031CSSP-CONS/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES & ECONOMIC ZONES(ROADS LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRA PROG-ROLL-IT)-STA.FILOMENA ROAD IN SUPPORT OF MULTI-CROP PROCESSING CENTER(COFFEE,CACAO,PINEAPPLE,COCONUT)FURNITURE | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱9.5M | 100% | High risk76 | Flagged0.002 |
| 9 | 23PC0046CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER BASIN, NAMALTUGAN SECTION, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.051 |
| 10 | 24PC0043CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY AGA, PUDTOL, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱4.8M | 99% | Medium risk59 | —-0.041 |
| 11 | 24PC0070CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF BARANGAY LOWER MATON MULTI-PURPOSE BUILDING, BARANGAY LOWER MATON, PUDTOL, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱4.8M | 100% | Medium risk58 | —-0.043 |
| 12 | 23PC0075REHABILITATION AND CONCRETING OF LUROG-PANTAY-KALANGKUASAN-KAPANICKIAN FMR, BRGY ALLIG, FLORA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱19.4M | 94% | Medium risk58 | Flagged0.017 |
| 13 | 22PC0028BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TUBONGAN, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱5M | 100% | Medium risk57 | —-0.074 |
| 14 | 24PC0016OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - APAYAO-ILOCOS NORTE RD - K0650 + 339 - K0650 + 422 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱20.2M | 100% | Medium risk57 | —-0.047 |
| 15 | 24PC0084CSSP-CONS./IMPROV.OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) SANTA MARIA-MALLIG ROAD IN SUPPORT OF FURNITURE, HANDICRAFTS, BANANA, RICE, CORN, & TOURISM | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱19.1M | 100% | Medium risk56 | —-0.047 |
| 16 | 24PC0024OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - APAYAO-ILOCOS NORTE RD - K0647 + 120 - K0647 + 320 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱33.1M | 98% | Medium risk56 | —-0.044 |
| 17 | 25PC0003CSSP-CONS/IMPROVEMENT OF ACCESS RD LEADING TO TRADES,INDUSTRIES & ECONOMIC ZONES(RD LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRA PROGRAM-ROLL-IT)-SANTA MARIA-MALLIG ROAD IN SUPPORT OF FURNITURE,HANDICRAFTS,BANANA, RICE,CORN,& TOURISM INDUSTRIES, FLORA, | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱9.5M | 100% | Medium risk56 | —-0.050 |
| 18 | 25PC0002CSSP-CONS/ IMPROVEMENT OF ACCESS RD LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES(RD LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRA PROG-ROLL-IT)-MALUBIBIT SUR-BALASI-ATOK RD IN SUPPORT TO HANDICRAFT, FURNITURE,HIGH VALUE CROPS PROCESSING & SUPPORT TO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱9.5M | 100% | Medium risk56 | —-0.050 |
| 19 | 25PC0018OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0646+162.5 - K0646+247 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱20.3M | 100% | Medium risk56 | —-0.049 |
| 20 | 24PC0001OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESEVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY RD - AYAGA - STA. MARCELA-FLORA-LASAM RD - K0686+905-K0686+965 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱7.7M | 100% | Medium risk56 | —-0.044 |
| 21 | 24PC0085CSSP-BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SABANGAN, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱9.7M | 100% | Medium risk56 | —-0.044 |
| 22 | 24PC0042CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (JUSTICE HALL), BARANGAY POBLACION WEST, FLORA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱9.7M | 100% | Medium risk56 | —-0.043 |
| 23 | 24PC0031CSSP-CONS/IMPVT OF ACCESS RD LEADING TO TRADES,INDUSTRIES & ECONOMIC ZONES(RD LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRA PROG-ROLL-IT)-MALUBIBIT SUR-BALASI-ATOK RD IN SUPPORT TO HANDICRAFT,FURNITURE,HIGH VALUE CROPS PROCESSING & SUPPORT TO TOURISM IND | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱19M | 100% | Medium risk56 | —-0.043 |
| 24 | 22PC0039CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONS./IMP. OF ACCESS RDS LEADING TO TRADES, IND. AND ECONOMIC ZONES (ROLL-IT)-MALUBIBIT SUR-BALASI-ATOK ROAD IN SUPPORT TO HANDICRAFT, FURNITURE, HIGH VALUE CROPS PROCESSING AND SUPPORT TO TOURISM IND. FLORA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.5M | 100% | Medium risk56 | —-0.078 |
| 25 | 24PC0003CSSP-CONS/IMPV'T OF ACCESS RD LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (RD LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRA PROG-ROLL IT)-DOÑA LORETA-LYDIA RD IN SUPPORT OF FURNITURE,HANDICRAFT,LOOMWEAVING,BLACKSMITHING,PINEAPPLE,BANANA,VEGETABLES | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱19.2M | 99% | Medium risk55 | —-0.043 |