Contractor dossier
102 projects on file, including joint ventures this contractor is part of.
Total projects
102
Total budget
₱14.1B
Average progress
86.7%
Completion rate
59.8%
Below 70%
Average risk score
61.9
High risk on average, out of 100
Flagged as unusual
17
16.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 31 | ₱6.2B | 68.2 | 11 | 77.9% |
| Region II | 17 | ₱1.7B | 56.3 | 0 | 100.0% |
| National Capital Region | 12 | ₱1.1B | 69.6 | 2 | 83.7% |
| Region IV-A | 12 | ₱1.3B | 64.5 | 0 | 67.8% |
| Region III | 9 | ₱589.3M | 48.0 | 0 | 91.2% |
| Region IV-B | 8 | ₱506.4M | 45.5 | 0 | 100.0% |
| Region I | 4 | ₱335.1M | 66.6 | 1 | 100.0% |
| Region VI | 4 | ₱443.1M | 54.9 | 2 | 97.1% |
| Central Office | 3 | ₱1.1B | 76.2 | 1 | 99.6% |
| Region V | 1 | ₱482.5M | 68.2 | 0 | 100.0% |
| Region XI | 1 | ₱193M | 57.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 40 | ₱5.1B | 60.4 | 5 | 91.2% |
| Roads | 33 | ₱3.6B | 55.4 | 0 | 92.6% |
| Buildings and Facilities | 16 | ₱3.2B | 64.0 | 4 | 73.8% |
| OTHER | 10 | ₱2B | 77.6 | 7 | 75.5% |
| GAA 2025 OO-2 | 2 | ₱96.5M | 89.0 | 0 | 60.0% |
| GAA 2025 SSP | 1 | ₱49M | 93.8 | 1 | 82.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OA0049CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN BARANGAY TANZA (PHASE 3), NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱49M | 83% | High risk94 | Flagged0.008 |
| 25OA0025CONSTRUCTION OF BOX CULVERT, E. RODRIGUEZ ST., BARANGAY TANZA 1, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱47.5M | 29% | High risk89 | —-0.007 |
| 25OA0001CONSTRUCTION OF RIVERWALLS ALONG TANGOS RIVER, PHASE 4, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱49M | 91% | High risk89 | —-0.020 |
| 24I00375BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS CENTER), TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱197.9M | 62% | High risk84 | Flagged0.030 |
| 24I00395SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES - CONSTRUCTION (COMPLETION) OF EASTERN VISAYAS MEDICAL CENTER, CANCER CENTER, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱482.2M | 24% | High risk84 | Flagged0.046 |
| 23I00128CLUSTER 5: PROJECT 1. BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF THREE-STOREY BUILDING, DPWH REGIONAL OFFICE VIII, EQUIPMENT MANAGEMENT DIVISION, PHASE II, BARANGAY PAWING, PALO, LEYTE; PROJECT 2 | Region VIII | Region VIII | On-Going | ₱277.7M | 81% | High risk84 | Flagged0.044 |
| 24I00141CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF MOTHER & CHILD AND OUT-PATIENT BUILDING OF SAMAR ISLAND MEDICAL CENTER, CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱385.9M | 59% | High risk84 | Flagged0.044 |
| 23I00131CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱222.9M | 87% | High risk83 | Flagged0.034 |
| 23IF0127CONSTRUCTION OF MULTI-PURPOSE BUILDING (CULTURAL CENTER), BRGY. JUATON, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱148.4M | 100% | High risk83 | Flagged0.022 |
| 17IK0001CLUSTER I - PREVENTIVE MAINT. WRIGHT OLD ROUTE, KO826+797-KO826+182; SAN JUANICO-BASEY-SOHOTON ROAD, KO896+290-KO900+500 & KO900+850-KO907+450; SAN JUANICO-BASEY-SOHOTON ROAD, KO909+278-KO909+422 | Region VIII | Samar 2nd DEO | Completed | ₱27.9M | 100% | High risk78 | —-0.035 |
| 17O00021CONSTRUCTION OF NAVOTAS COASTAL DIKE, NAVOTAS CITY, STA. 0+000 - STA. 0+(-425) (NAVOTAS TERMINAL) | Central Office | Flood Control Management Cluster | Completed | ₱183.9M | 100% | High risk77 | —-0.049 |
| 17Z00010RAISING OF FOLDER DIKE INCLUDING SLOPE PROTECTION WORKS (PHASE 4: STA 2+030 TO STA. 2+530, PHASE 5: STA. 5+720 TO STA. 5+200, PHASE 6) BRGY. DAMPALIT, MALABON CITY | Central Office | Flood Control Management Cluster | On-Going | ₱284.5M | 99% | High risk77 | Flagged0.014 |
| 25I00193BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (SAMAR ISLAND MEDICAL CENTER BUILDING), CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱482.2M | 23% | High risk76 | Flagged0.025 |
| 17BD0024MF02: CONSTRUCTION OF FLOOD CONTROL SYSTEM, NAMABBALAN, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱92M | 100% | High risk76 | —-0.010 |
| 17Z00006REHABILITATION OF DIKE SYSTEM ALONG SOLSONA RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Central Office | Flood Control Management Cluster | Completed | ₱669.3M | 100% | High risk75 | —-0.002 |
| 25CC0257CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY SAN MARCOS, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱14.5M | 73% | High risk74 | —-0.033 |
| 24CC0223CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱14.8M | 48% | High risk74 | —-0.017 |
| 16DE0187MFO-2 FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG LOBO RIVERBANKS, POBLACION, LOBO, BATANGAS, 2ND LD | Region IV-A | Batangas 2nd DEO | Completed | ₱77.2M | 100% | High risk73 | —-0.052 |
| 16DE0186MFO-2 FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG LOBO RIVERBANKS, TAYUMAN, LOBO, BATANGAS, 2ND LD | Region IV-A | Batangas 2nd DEO | Completed | ₱77.2M | 100% | High risk73 | —-0.052 |
| 24IL0106FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE ALONG STO. ROSARIO - BUNGA, PADRE BURGOS, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱125.3M | 31% | High risk72 | Flagged0.045 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00395SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES - CONSTRUCTION (COMPLETION) OF EASTERN VISAYAS MEDICAL CENTER, CANCER CENTER, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱482.2M | 24% | High risk84 | Flagged0.046 |
| 24IL0106FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE ALONG STO. ROSARIO - BUNGA, PADRE BURGOS, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱125.3M | 31% | High risk72 | Flagged0.045 |
| 24I00141CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF MOTHER & CHILD AND OUT-PATIENT BUILDING OF SAMAR ISLAND MEDICAL CENTER, CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱385.9M | 59% | High risk84 | Flagged0.044 |
| 23I00128CLUSTER 5: PROJECT 1. BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF THREE-STOREY BUILDING, DPWH REGIONAL OFFICE VIII, EQUIPMENT MANAGEMENT DIVISION, PHASE II, BARANGAY PAWING, PALO, LEYTE; PROJECT 2 | Region VIII | Region VIII | On-Going | ₱277.7M | 81% | High risk84 | Flagged0.044 |
| 24IL0105FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE ALONG LUNGSODAAN - DINAHUGAN SECTION, PADRE BURGOS, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱120.5M | 46% | High risk72 | Flagged0.042 |
| 23I00131CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱222.9M | 87% | High risk83 | Flagged0.034 |
| 24I00375BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS CENTER), TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱197.9M | 62% | High risk84 | Flagged0.030 |
| 25I00193BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (SAMAR ISLAND MEDICAL CENTER BUILDING), CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱482.2M | 23% | High risk76 | Flagged0.025 |
| 23IF0127CONSTRUCTION OF MULTI-PURPOSE BUILDING (CULTURAL CENTER), BRGY. JUATON, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱148.4M | 100% | High risk83 | Flagged0.022 |
| 17AB0239REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER, (BREACHED & ERODED DIKE) RIGHT BANK, BRGY. BARESBES, DINGRAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱47.7M | 100% | High risk63 | Flagged0.015 |
| 22I00108CONSTRUCTION OF OFFICE OF CIVIL DEFENSE (OCD) REGIONAL OFFICE 8 BUILDING, GOVERNMENT CENTER, BRGY. CANDAHUG, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱216.2M | 16% | High risk69 | Flagged0.015 |
| 24OD0028CONSTRUCTION OF REINFORCED CONCRETE BOX CULVERT ALONG A. MABINI ST., CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱94.3M | 52% | High risk68 | Flagged0.015 |
| 17Z00010RAISING OF FOLDER DIKE INCLUDING SLOPE PROTECTION WORKS (PHASE 4: STA 2+030 TO STA. 2+530, PHASE 5: STA. 5+720 TO STA. 5+200, PHASE 6) BRGY. DAMPALIT, MALABON CITY | Central Office | Flood Control Management Cluster | On-Going | ₱284.5M | 99% | High risk77 | Flagged0.014 |
| 21G00028CONSTRUCTION OF THREE-STOREY DPWH REGIONAL OFFICE VI BUILDING, FORT SAN PEDRO, ILOILO CITY | Region VI | Region VI | On-Going | ₱193M | 89% | High risk62 | Flagged0.014 |
| 25OA0049CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN BARANGAY TANZA (PHASE 3), NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱49M | 83% | High risk94 | Flagged0.008 |
| 19G00112CONSTRUCTION OF MUSEUM/AUDITORIUM, BACOLOD CITY, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱157.4M | 100% | High risk62 | Flagged0.007 |
| 24I00058REHABILITATION OF FLOOD CONTROL, PAGSANGA-AN RIVER, ORMOC CITY | Region VIII | Region VIII | On-Going | ₱274.3M | 65% | High risk67 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24I00352BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF AIRPORT FACILITY, TACLOBAN AIRPORT, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱494.9M | 85% | High risk69 | —-0.009 |
| 27 | 22I00108CONSTRUCTION OF OFFICE OF CIVIL DEFENSE (OCD) REGIONAL OFFICE 8 BUILDING, GOVERNMENT CENTER, BRGY. CANDAHUG, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱216.2M | 16% | High risk69 | Flagged0.015 |
| 28 | 21I00082CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL, BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱386M | 100% | High risk69 | —-0.001 |
| 29 | 17B00011MFO 1: NATIONAL ROAD NETWORK SERVICES: ASSET PRESERVATION OF NATIONAL ROADS: REHABILITATION /RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT | Region II | Region II | Completed | ₱94M | 100% | High risk68 | —-0.033 |
| 30 | 22F00050OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR EXPRESSWAY (PACKAGE 4), SAN FERNANDO-MINALABAC, CAMARINES SUR(2ND LEGISLATIVE DISTRICT) | Region V | Region V | Completed | ₱482.5M | 100% | High risk68 | —-0.052 |
| 31 | 23I00183CONSTRUCTION OF SAMAR ISLAND MEDICAL CENTER (PHASE 1), BARANGAY GADGARAN, CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱477.7M | 88% | High risk68 | —-0.005 |
| 32 | 18AA0103REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, MANILA NORTH RD. - K0578+015 - K0578+092, PAGUDPUD, ILOCOS, NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱96.5M | 100% | High risk68 | —-0.066 |
| 33 | 24OD0028CONSTRUCTION OF REINFORCED CONCRETE BOX CULVERT ALONG A. MABINI ST., CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱94.3M | 52% | High risk68 | Flagged0.015 |
| 34 | 24D00041CONSTRUCTION OF REVETMENT ALONG MALAKING ILOG RIVER, PHASE 4, BRGY. LIPAHAN, SAN JUAN, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱159.9M | 74% | High risk67 | —-0.016 |
| 35 | 23D00148CONSTRUCTION OF SLOPE PROTECTION ALONG MALAKING ILOG RIVER, BRGY. LIPAHAN, SAN JUAN, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱168.8M | 99% | High risk67 | —-0.018 |
| 36 | 24D00040CONSTRUCTION OF REVETMENT ALONG MALAKING ILOG RIVER (UPSTREAM), BRGY. LIPAHAN, SAN JUAN, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱150.4M | 76% | High risk67 | —-0.018 |
| 37 | 22OD0123CONSTRUCTION OF FLOOD CONTROL RIVER WALL (ROAD DIKE) ALONG VEINTE REALES CREEK (RIGHT SIDE BANK), BRGY. VEINTE REALES, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱199.7M | 100% | High risk67 | —-0.050 |
| 38 | 18I00041CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 5+640 - STATION 6+080, SECTION 5 PHASE 13, BRGY. CALOGCOG, TANAUAN, LEYTE | Region VIII | Region VIII | Completed | ₱147.8M | 100% | High risk67 | —-0.051 |
| 39 | 18OD0181CONSTRUCTION OF REVETMENT WALL ALONG POLO RIVER, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱210.6M | 100% | High risk67 | —-0.051 |
| 40 | 24D00166FY2024 DPWH INFRA PROG-CONVERGENCE & SPECIAL SUPPORT PROG-BASIC INFRA PROG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS/ FACILITIES-CONSTRUCTION OF REVETMENT ALONG MALAKING ILOG RIVER (DOWNSTREAM), BRGY. LIPAHAN, SAN JUAN, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱144.7M | 80% | High risk67 | —-0.024 |
| 41 | 24I00058REHABILITATION OF FLOOD CONTROL, PAGSANGA-AN RIVER, ORMOC CITY | Region VIII | Region VIII | On-Going | ₱274.3M | 65% | High risk67 | Flagged0.005 |
| 42 | 23IM0093CONSTRUCTION OF MULTI-PURPOSE FACILITIES (VIEWING DECK AND BOARDWALK) NEAR SAN JUANICO BRIDGE (PHASE 2), TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱96.4M | 7% | High risk66 | —-0.002 |
| 43 | 24OA0001ASSET PRESERVATION PROGRAM-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-TERTIARY ROADS-M. NAVAL ST-K0011 + (-888)-K0011 + (-206), NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱49M | 91% | High risk65 | —-0.004 |
| 44 | 24I00095ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR), K0718+581 - K0718+815, K0747+179 - K0751+090, SAMAR 1ST | Region VIII | Region VIII | On-Going | ₱254.1M | 91% | High risk65 | —-0.015 |
| 45 | 25D00018CONSTRUCTION OF REVETMENT ALONG MALAKING ILOG RIVER, PHASE 1, BARANGAY MARAYKIT, SAN JUAN, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱94.1M | 20% | High risk65 | —-0.022 |
| 46 | 24OD0047CONSTRUCTION OF REINFORCED CONCRETE BOX CULVERT ALONG 2ND STREET, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱94.2M | 80% | High risk65 | —-0.034 |
| 47 | 24D00039REHABILITATION OF LAIYA - MALABRIGO ROAD, PHASE 3, BRGY. HUGOM, SAN JUAN, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱159.9M | 53% | High risk65 | —-0.031 |
| 48 | 23DD0178CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MALAKING ILOG (PHASE 1), BRGY. LIPAHAN, SAN JUAN, BATAN | Region IV-A | Batangas 4th DEO | Completed | ₱96M | 100% | High risk65 | —-0.073 |
| 49 | 22IL0178CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY (SPORTS COMPLEX), TAM-IS, MAASIN CITY, SOUTHERN L | Region VIII | Southern Leyte 1st DEO | On-Going | ₱241.1M | 100% | High risk65 | —-0.009 |
| 50 | 24OE0175REHABILITATION OF DRAINAGE SYSTEM ALONG MALABON ST., MANILA | National Capital Region | North Manila DEO | On-Going | ₱98.4M | 90% | High risk64 | —-0.035 |