Contractor dossier
102 projects on file, including joint ventures this contractor is part of.
Total projects
102
Total budget
₱14.1B
Average progress
86.7%
Completion rate
59.8%
Below 70%
Average risk score
61.9
High risk on average, out of 100
Flagged as unusual
17
16.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 31 | ₱6.2B | 68.2 | 11 | 77.9% |
| Region II | 17 | ₱1.7B | 56.3 | 0 | 100.0% |
| National Capital Region | 12 | ₱1.1B | 69.6 | 2 | 83.7% |
| Region IV-A | 12 | ₱1.3B | 64.5 | 0 | 67.8% |
| Region III | 9 | ₱589.3M | 48.0 | 0 | 91.2% |
| Region IV-B | 8 | ₱506.4M | 45.5 | 0 | 100.0% |
| Region I | 4 | ₱335.1M | 66.6 | 1 | 100.0% |
| Region VI | 4 | ₱443.1M | 54.9 | 2 | 97.1% |
| Central Office | 3 | ₱1.1B | 76.2 | 1 | 99.6% |
| Region V | 1 | ₱482.5M | 68.2 | 0 | 100.0% |
| Region XI | 1 | ₱193M | 57.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 40 | ₱5.1B | 60.4 | 5 | 91.2% |
| Roads | 33 | ₱3.6B | 55.4 | 0 | 92.6% |
| Buildings and Facilities | 16 | ₱3.2B | 64.0 | 4 | 73.8% |
| OTHER | 10 | ₱2B | 77.6 | 7 | 75.5% |
| GAA 2025 OO-2 | 2 | ₱96.5M | 89.0 | 0 | 60.0% |
| GAA 2025 SSP | 1 | ₱49M | 93.8 | 1 | 82.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OA0049CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN BARANGAY TANZA (PHASE 3), NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱49M | 83% | High risk94 | Flagged0.008 |
| 25OA0025CONSTRUCTION OF BOX CULVERT, E. RODRIGUEZ ST., BARANGAY TANZA 1, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱47.5M | 29% | High risk89 | —-0.007 |
| 25OA0001CONSTRUCTION OF RIVERWALLS ALONG TANGOS RIVER, PHASE 4, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱49M | 91% | High risk89 | —-0.020 |
| 24I00375BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS CENTER), TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱197.9M | 62% | High risk84 | Flagged0.030 |
| 24I00395SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES - CONSTRUCTION (COMPLETION) OF EASTERN VISAYAS MEDICAL CENTER, CANCER CENTER, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱482.2M | 24% | High risk84 | Flagged0.046 |
| 23I00128CLUSTER 5: PROJECT 1. BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF THREE-STOREY BUILDING, DPWH REGIONAL OFFICE VIII, EQUIPMENT MANAGEMENT DIVISION, PHASE II, BARANGAY PAWING, PALO, LEYTE; PROJECT 2 | Region VIII | Region VIII | On-Going | ₱277.7M | 81% | High risk84 | Flagged0.044 |
| 24I00141CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF MOTHER & CHILD AND OUT-PATIENT BUILDING OF SAMAR ISLAND MEDICAL CENTER, CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱385.9M | 59% | High risk84 | Flagged0.044 |
| 23I00131CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱222.9M | 87% | High risk83 | Flagged0.034 |
| 23IF0127CONSTRUCTION OF MULTI-PURPOSE BUILDING (CULTURAL CENTER), BRGY. JUATON, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱148.4M | 100% | High risk83 | Flagged0.022 |
| 17IK0001CLUSTER I - PREVENTIVE MAINT. WRIGHT OLD ROUTE, KO826+797-KO826+182; SAN JUANICO-BASEY-SOHOTON ROAD, KO896+290-KO900+500 & KO900+850-KO907+450; SAN JUANICO-BASEY-SOHOTON ROAD, KO909+278-KO909+422 | Region VIII | Samar 2nd DEO | Completed | ₱27.9M | 100% | High risk78 | —-0.035 |
| 17O00021CONSTRUCTION OF NAVOTAS COASTAL DIKE, NAVOTAS CITY, STA. 0+000 - STA. 0+(-425) (NAVOTAS TERMINAL) | Central Office | Flood Control Management Cluster | Completed | ₱183.9M | 100% | High risk77 | —-0.049 |
| 17Z00010RAISING OF FOLDER DIKE INCLUDING SLOPE PROTECTION WORKS (PHASE 4: STA 2+030 TO STA. 2+530, PHASE 5: STA. 5+720 TO STA. 5+200, PHASE 6) BRGY. DAMPALIT, MALABON CITY | Central Office | Flood Control Management Cluster | On-Going | ₱284.5M | 99% | High risk77 | Flagged0.014 |
| 25I00193BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (SAMAR ISLAND MEDICAL CENTER BUILDING), CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱482.2M | 23% | High risk76 | Flagged0.025 |
| 17BD0024MF02: CONSTRUCTION OF FLOOD CONTROL SYSTEM, NAMABBALAN, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱92M | 100% | High risk76 | —-0.010 |
| 17Z00006REHABILITATION OF DIKE SYSTEM ALONG SOLSONA RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Central Office | Flood Control Management Cluster | Completed | ₱669.3M | 100% | High risk75 | —-0.002 |
| 25CC0257CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY SAN MARCOS, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱14.5M | 73% | High risk74 | —-0.033 |
| 24CC0223CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱14.8M | 48% | High risk74 | —-0.017 |
| 16DE0187MFO-2 FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG LOBO RIVERBANKS, POBLACION, LOBO, BATANGAS, 2ND LD | Region IV-A | Batangas 2nd DEO | Completed | ₱77.2M | 100% | High risk73 | —-0.052 |
| 16DE0186MFO-2 FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG LOBO RIVERBANKS, TAYUMAN, LOBO, BATANGAS, 2ND LD | Region IV-A | Batangas 2nd DEO | Completed | ₱77.2M | 100% | High risk73 | —-0.052 |
| 24IL0106FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE ALONG STO. ROSARIO - BUNGA, PADRE BURGOS, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱125.3M | 31% | High risk72 | Flagged0.045 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00395SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES - CONSTRUCTION (COMPLETION) OF EASTERN VISAYAS MEDICAL CENTER, CANCER CENTER, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱482.2M | 24% | High risk84 | Flagged0.046 |
| 24IL0106FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE ALONG STO. ROSARIO - BUNGA, PADRE BURGOS, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱125.3M | 31% | High risk72 | Flagged0.045 |
| 24I00141CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF MOTHER & CHILD AND OUT-PATIENT BUILDING OF SAMAR ISLAND MEDICAL CENTER, CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱385.9M | 59% | High risk84 | Flagged0.044 |
| 23I00128CLUSTER 5: PROJECT 1. BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF THREE-STOREY BUILDING, DPWH REGIONAL OFFICE VIII, EQUIPMENT MANAGEMENT DIVISION, PHASE II, BARANGAY PAWING, PALO, LEYTE; PROJECT 2 | Region VIII | Region VIII | On-Going | ₱277.7M | 81% | High risk84 | Flagged0.044 |
| 24IL0105FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE ALONG LUNGSODAAN - DINAHUGAN SECTION, PADRE BURGOS, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱120.5M | 46% | High risk72 | Flagged0.042 |
| 23I00131CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱222.9M | 87% | High risk83 | Flagged0.034 |
| 24I00375BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS CENTER), TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱197.9M | 62% | High risk84 | Flagged0.030 |
| 25I00193BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (SAMAR ISLAND MEDICAL CENTER BUILDING), CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱482.2M | 23% | High risk76 | Flagged0.025 |
| 23IF0127CONSTRUCTION OF MULTI-PURPOSE BUILDING (CULTURAL CENTER), BRGY. JUATON, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱148.4M | 100% | High risk83 | Flagged0.022 |
| 17AB0239REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER, (BREACHED & ERODED DIKE) RIGHT BANK, BRGY. BARESBES, DINGRAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱47.7M | 100% | High risk63 | Flagged0.015 |
| 22I00108CONSTRUCTION OF OFFICE OF CIVIL DEFENSE (OCD) REGIONAL OFFICE 8 BUILDING, GOVERNMENT CENTER, BRGY. CANDAHUG, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱216.2M | 16% | High risk69 | Flagged0.015 |
| 24OD0028CONSTRUCTION OF REINFORCED CONCRETE BOX CULVERT ALONG A. MABINI ST., CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱94.3M | 52% | High risk68 | Flagged0.015 |
| 17Z00010RAISING OF FOLDER DIKE INCLUDING SLOPE PROTECTION WORKS (PHASE 4: STA 2+030 TO STA. 2+530, PHASE 5: STA. 5+720 TO STA. 5+200, PHASE 6) BRGY. DAMPALIT, MALABON CITY | Central Office | Flood Control Management Cluster | On-Going | ₱284.5M | 99% | High risk77 | Flagged0.014 |
| 21G00028CONSTRUCTION OF THREE-STOREY DPWH REGIONAL OFFICE VI BUILDING, FORT SAN PEDRO, ILOILO CITY | Region VI | Region VI | On-Going | ₱193M | 89% | High risk62 | Flagged0.014 |
| 25OA0049CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN BARANGAY TANZA (PHASE 3), NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱49M | 83% | High risk94 | Flagged0.008 |
| 19G00112CONSTRUCTION OF MUSEUM/AUDITORIUM, BACOLOD CITY, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱157.4M | 100% | High risk62 | Flagged0.007 |
| 24I00058REHABILITATION OF FLOOD CONTROL, PAGSANGA-AN RIVER, ORMOC CITY | Region VIII | Region VIII | On-Going | ₱274.3M | 65% | High risk67 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 19OE0020ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - BANK IMPROVEMENT ALONG ESTERO DELA REINA, (LS) STA. 0+312.40 TO STA. 0+423.20, STA. 0+434.44 TO | National Capital Region | North Manila DEO | Completed | ₱93.1M | 100% | High risk64 | —-0.027 |
| 52 | 18B00012OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MNG'T PROGRAM: CONST'N / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: FLOOD CONTROL/URGENT RIVER BANK PROTECTION WORKS, AGASIAN, ILAGAN, ISABELA, STA. 000+000-STA. 1+020 (D | Region II | Region II | Completed | ₱186M | 100% | High risk64 | —-0.034 |
| 53 | 18A00098CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURES ALONG PANGASINAN-NUEVA VISCAYA ROAD, PANGASINAN | Region I | Region I | Completed | ₱144.7M | 100% | High risk64 | —-0.045 |
| 54 | 17AB0239REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER, (BREACHED & ERODED DIKE) RIGHT BANK, BRGY. BARESBES, DINGRAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱47.7M | 100% | High risk63 | Flagged0.015 |
| 55 | 24IM0103REHABILITATION OF MULTI-PURPOSE BUILDING, ABUCAY OLD ANNEX BUILDING, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱79.1M | 50% | High risk63 | —-0.030 |
| 56 | 21G00028CONSTRUCTION OF THREE-STOREY DPWH REGIONAL OFFICE VI BUILDING, FORT SAN PEDRO, ILOILO CITY | Region VI | Region VI | On-Going | ₱193M | 89% | High risk62 | Flagged0.014 |
| 57 | 19G00112CONSTRUCTION OF MUSEUM/AUDITORIUM, BACOLOD CITY, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱157.4M | 100% | High risk62 | Flagged0.007 |
| 58 | 18B00015OO 1: ENSURE SAFE AND RELIABLE NAT'L RD. SYSTEM: NETWORK DEV'T: ROAD WIDENING: PRIMARY ROADS ALONG DAANG MAHARLIKA (LZ), K0423+200 (STA. 423+189) -K0423+304 (STA. 423+293), K0423+355 (STA. 423+344)-K0423+871(STA. 423+860); K0423+1311(STA. 424+300)-K0423+1 | Region II | Region II | Completed | ₱168.4M | 100% | High risk61 | —-0.048 |
| 59 | 19I00004ASSET PRESERVATION - PREVENTIVE MAINT. - PRIMARY ROADS, DAANG MAHARLIKA (LT), KO901+1028-KO903+853, KO906+505-KO907+173 (S00002LT), KO908+(-812)-KO908+563 (S00022LT), TACLOBAN CITY | Region VIII | Region VIII | Completed | ₱121.7M | 100% | High risk61 | —-0.081 |
| 60 | 24D00171REHABILITATION OF LAIYA-MALABRIGO ROAD, BRGY. HUGOM, SAN JUAN, BATANGAS (PHASE 4) | Region IV-A | Region IV-A | On-Going | ₱96.3M | 0% | High risk61 | —-0.029 |
| 61 | 18B00022NETWORK DEV'T: ROAD WIDENING: PRIMARY ROADS ALONG CAGAYAN VALLEY ROAD INCLUDING ROW, K0519+499-K0524+000=STA. 519+524-STA. 524+043.20, ALCALA, CAGAYAN | Region II | Region II | Completed | ₱184M | 100% | Medium risk60 | —-0.048 |
| 62 | 19I00003ASSET PRESERVATION-PREVENTIVE MAINTENANCE-PRIMARY ROADS, PALO-CARIGARA-ORMOC ROAD, KO975+(-061)-KO975+782, KO975+826-KO979+000, KO982+163-KO983+293 (S00075LT), KO940+407-KO942+466 (S00076LT), LEYTE 2ND LD | Region VIII | Region VIII | Completed | ₱110.9M | 100% | Medium risk60 | —-0.082 |
| 63 | 20I00003ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS, BDRY. SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA, K1177+398 - K1183+000 (S00194LT), SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱96.1M | 100% | Medium risk60 | —-0.084 |
| 64 | 20I00022ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS, JCT. HIMAY-ANGAN - SILAGO - ABUYOG BDRY. RD. - K1063+000 - K1068+601, SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱97M | 100% | Medium risk59 | —-0.083 |
| 65 | 22IL0168NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS / MAASIN CITY COASTAL BYPASS ROAD (WEST BYPASS ROAD) SEGMENT 1, SOUTHERN LEYTE, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱96.4M | 100% | Medium risk59 | —-0.075 |
| 66 | 22IL0169NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS / MAASIN CITY COASTAL BYPASS ROAD (WEST BYPASS ROAD) SEGMENT 2, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.075 |
| 67 | 18B00014OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS; FLOOD MNG'T PROGRAM: CONST'N/MAINTENANCE OF FLD. MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONST'N OF REVETMENT WITH STEEL SHEET PILES, STA. 000+000-STA. 000+430, DUGO, CAMALANIUGAN, CAGAYAN | Region II | Region II | Completed | ₱93.4M | 100% | Medium risk58 | —-0.051 |
| 68 | 18L00140CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAVAO OCCIDENTAL GOVERNMENT CENTER) MALITA, DAVAO OCCIDENTAL | Region XI | Region XI | Completed | ₱193M | 100% | Medium risk58 | —-0.040 |
| 69 | 18C00061FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF ERODED PAMPANGA RIVER BANK (SAN JOSE, SAN SIMON AND SUCAD, APALIT SECTION) PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱193M | 100% | Medium risk58 | —-0.048 |
| 70 | 25D00017CONSTRUCTION OF BY-PASS AND DIVERSION ROADSSAN JUAN BYPASS (ROSARIO-SAN JUAN-LAIYA TOURISM BYPASS ROAD) CANDELARIA-SAN JUAN-ROSARIO, PACKAGE 4, SAN JUAN BATANGAS | Region IV-A | Region IV-A | On-Going | ₱89.4M | 11% | Medium risk56 | —-0.039 |
| 71 | 20I00025ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS, BILIRAN CIRCUMFERENTIAL RD. - K1083+170 - K1084+392, K1084+914 - K1086+1000 (S00002BR), BILIRAN LD | Region VIII | Region VIII | Completed | ₱83.1M | 100% | Medium risk56 | —-0.088 |
| 72 | 20I00052MINUHANG (BALUARTE) - BALUD AND BALUD-DUKA ROAD CONNECTING TO BAGAHUPI - BABATNGON - STA. CRUZ - BARUGO - CARIGARA NATIONAL ROAD IN SUPPORT OF THE BARUGO ECO-ZONE, BARUGO, LEYTE | Region VIII | Region VIII | Completed | ₱77.2M | 100% | Medium risk56 | —-0.086 |
| 73 | 21I00006ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL ROADS (S00002BR) - K1070+000 - K1071+950, K1073+000 - K1074+700, BILIRAN LD | Region VIII | Region VIII | Completed | ₱67.5M | 100% | Medium risk55 | —-0.091 |
| 74 | 20I00046ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - PALO - CARIGARA - ORMOC RD. - (S00073LT) K0957+(-212) - K0957+020, (S00080LT) K0939+(-345) - K0939+920, (S00076LT) K0940+(-088) - K0940+407, LEYTE 2ND LD | Region VIII | Region VIII | Completed | ₱87.4M | 100% | Medium risk55 | —-0.087 |
| 75 | 21E00041REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS, DR. DAMIAN REYES ROAD (BOAC SIDE), KO017+000.00-KO017+117.00; KO017+280.00-KO017+415.00, MARINDUQUE | Region IV-B | Region IV-B | Completed | ₱109M | 100% | Medium risk54 | —-0.078 |