Contractor dossier
54 projects on file, including joint ventures this contractor is part of.
Total projects
54
Total budget
₱2.4B
Average progress
91.4%
Completion rate
83.3%
Average risk score
51.6
Medium risk on average, out of 100
Flagged as unusual
3
5.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 38 | ₱1.7B | 56.5 | 3 | 87.8% |
| Region IV-B | 16 | ₱653.3M | 39.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 20 | ₱931.8M | 48.3 | 2 | 90.1% |
| Flood Control and Drainage | 17 | ₱763.4M | 46.1 | 0 | 100.0% |
| Buildings and Facilities | 12 | ₱272.5M | 58.4 | 1 | 80.3% |
| OTHER | 3 | ₱249.1M | 71.0 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱95.1M | 82.3 | 0 | 71.3% |
| Bridges | 1 | ₱45.4M | 39.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CL0191CONSTRUCTION OF DIKE (LEVEES) OF MARANGLA RIVER, IBA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 71% | High risk82 | —-0.006 |
| 24CL0142CONSTRUCTION OF SLOPE PROTECTION PACKAGE 17 AT BOTOLAN- CAPAZ RD., BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk80 | —-0.045 |
| 23CL0174CONSTRUCTION OF BY-PASS AND DIVERSION ROADS IBA-BOTOLAN, ZAMBALES (PHASE 2) | Region III | Zambales 1st DEO | On-Going | ₱95.2M | 0% | High risk78 | Flagged0.058 |
| 25CL0216CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS GYMNASIUM), BRGY. CARAEL, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱48.9M | 0% | High risk77 | —-0.002 |
| 23CL0165CONSTRUCTION OF ACCESS ROAD/DIVERSION ROAD DAANG KALIKASAN TO UACON P3, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱94.7M | 100% | High risk77 | Flagged0.040 |
| 24CL0073CONSTRUCTION OF MULTI-PURPOSE BUILDING, ZAMBALES NATIONAL HIGH SCHOOL, ZONE 6, IBA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱30.2M | 89% | High risk73 | —-0.025 |
| 24CL0103CONSTRUCTION OF MULTI-PURPOSE BUILDING (BAHAY KALINGA), IBA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱39M | 75% | High risk73 | —-0.023 |
| 24CL0194CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS GYMNASIUM COMPLEX), BRGY. CARAEL, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱19.6M | 100% | High risk73 | —-0.063 |
| 24CL0082CONSTRUCTION OF MULTI-PURPOSE BUILDING/FACILITIES AND GROUND IMPROVEMENTS, BRGY. CARAEL, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱19.5M | 100% | High risk73 | —-0.064 |
| 24CL0155CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, BARANGAY CARAEL, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱19.5M | 100% | High risk73 | —-0.064 |
| 21CL0038CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO PRAWN FRY HATCHERIES AND RESORTS AND SURFING AREA,SAN FELIPE, ZAMBALES, PACKAGE II | Region III | Zambales 1st DEO | Completed | ₱92.9M | 100% | High risk72 | —-0.023 |
| 24CL0120CONSTRUCTION OF GUISGUIS FLOOD CONTROL AT NAYUM RIVER, BRGY. GUISGUIS, STA. CRUZ, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱47.7M | 100% | High risk71 | —-0.050 |
| 24CL0121CONSTRUCTION OF GUINABON FLOOD CONTROL AT NAYUM RIVER, BRGY. GUINABON, STA. CRUZ, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱47.7M | 100% | High risk71 | —-0.050 |
| 22CL0011CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO PRAWN FRY HATCHERIES AND RESORTS AND SURFING AREA, SAN NARCISO,ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱64.5M | 100% | High risk71 | —-0.032 |
| 22CL0013CONSTRUCTION OF SAN NARCISO COASTAL ROAD, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱91.7M | 100% | High risk70 | —-0.024 |
| 21CA0064CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM TIKAS) - CONCRETING OF ROAD, SITIO ALIKABOK, BRGY. BAYANORAN | Region III | Bataan 1st DEO | Completed | ₱9.8M | 100% | High risk70 | —-0.067 |
| 21CA0083CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM- TIKAS) CONCRETING OF ROAD FROM ROMAN EXPRESSWAY LEADING TO SAN PE | Region III | Bataan 1st DEO | Completed | ₱9.8M | 100% | High risk69 | —-0.056 |
| 25CL0138REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS TARLAC RD - K0 197 + (-560) - K0197 + (-292), K0201 + 322 - K0201 + 720, CHAINAGE 65M (S01163LZ), K0202 + 285 - K0203 + 200, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱36.5M | 3% | High risk69 | —-0.010 |
| 24CL0123CONSTRUCTION OF GAMA RIVER SLOPE PROTECTION/FLOOD CONTROL STRUCTURE PHASE 3, STA. CRUZ, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱47.7M | 100% | High risk69 | —-0.050 |
| 24CL0122CONSTRUCTION OF GAMA RIVER SLOPE PROTECTION/FLOOD CONTROL STRUCTURE PHASE 2, STA. CRUZ, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱47.7M | 100% | High risk69 | —-0.050 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23CL0174CONSTRUCTION OF BY-PASS AND DIVERSION ROADS IBA-BOTOLAN, ZAMBALES (PHASE 2) | Region III | Zambales 1st DEO | On-Going | ₱95.2M | 0% | High risk78 | Flagged0.058 |
| 23CL0165CONSTRUCTION OF ACCESS ROAD/DIVERSION ROAD DAANG KALIKASAN TO UACON P3, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱94.7M | 100% | High risk77 | Flagged0.040 |
| 25CL0251CONSTRUCTION OF MUNICIPAL GYM, BARANGAY DIRITA, IBA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱19.6M | 0% | High risk68 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 22EH0019CONSTRUCTION/REHABILITATION OF DULANGAN FLOOD MITIGATING STRUCTURE (UPSTREAM) ALONG DULANGAN RIVER CONTROL, STA. 09+408 - STA. 09+655.20 (R/S), STA. 09+408 - STA. 09+508 (L/S), MAGDIWANG, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱47.5M | 100% | Medium risk43 | —-0.069 |
| 27 | 19EH0065CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE LOCAL PROJECTS - SUGOD - CAWAYAN ROAD LEADING TO BLUE HOLE (PACKAGE I), SAN AGUSTIN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱47.8M | 100% | Medium risk42 | —-0.084 |
| 28 | 19EH0058CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION - ACCESS ROAD LEADING TO TUBURAN FALLS (PACKAGE I), STA. 00 + 000 - STA. 01 + 355, BRGY. TUBURAN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱47.8M | 100% | Medium risk42 | —-0.091 |
| 29 | 19EH0066CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE LOCAL PROJECTS - PROGRESO ESTE TO GARING FALLS - MALILICO PACKAGE I, ODIONGAN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱49M | 100% | Medium risk42 | —-0.086 |
| 30 | 18CL0061CONSTRUCTION / IMPROVEMENT OF ACCESS ROAD LEADING TO SEAPORTS, SAN MIGUEL PORT BOULEVARD, SAN ANTONIO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱65.9M | 100% | Medium risk41 | —-0.092 |
| 31 | 19CA0065CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, STA. ISABEL SAN RAMON DIVERSION ROADDINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱49M | 100% | Medium risk40 | —-0.100 |
| 32 | 19EH0067CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE LOCAL PROJECTS - PROGRESO ESTE TO GARING FALLS - MALILICO PACKAGE II, ODIONGAN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱45.4M | 100% | Medium risk40 | —-0.046 |
| 33 | 22EB0053CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAGBAHAN RIVER, BARANGAY ALACAAK, STA. CRUZ, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱22.6M | 100% | Medium risk38 | —-0.073 |
| 34 | 19EH0012CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF BUDIONG RIVER CONTROL, STA. 0 + 000 - STA. 0 + 334 (R/S), BUDIONG, ODIONGAN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱38.4M | 100% | Medium risk38 | —-0.068 |
| 35 | 19EH0011CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF TUBURAN RIVER CONTROL, STA. 0 + 963.60 - STA. 0 + 384.40(R/S), TUBURAN, ODIONGAN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱38.3M | 100% | Medium risk38 | —-0.076 |
| 36 | 18EH0034CONSTRUCTION OF POCTOY FLOOD CONTROL STRUCTURE ALONG TABLAS CIRCUMFERENTIAL ROAD, ODIONGAN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱40.4M | 100% | Medium risk38 | —-0.075 |
| 37 | 19EH0010CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF LIBERTAD RIVER CONTROL, STA. 0 + 000 - STA. 0 + 266.00 (R/S), STA. 0 + 180 - STA. 0 + 240 (L/S), LIBERTAD, ODIONGAN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱37.6M | 100% | Medium risk38 | —-0.075 |
| 38 | 19EH0068CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE LOCAL PROJECTS - PROGRESO ESTE TO GARING FALLS - MALILICO PACKAGE III, ODIONGAN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱45.5M | 100% | Medium risk38 | —-0.086 |
| 39 | 18EH0090REHABILITATION/IMPROVEMENT OF LINAWAN ROAD GOING TO MABLARAN FALLS, SAN ANDRES, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱37.5M | 100% | Medium risk37 | —-0.093 |
| 40 | 23CL0126CONSTRUCTION OF PMMA ACCESS ROAD TO NATIONAL HIGHWAY INCLUDING FACILITIES, BRGY. NATIVIDAD, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱29.2M | 100% | Medium risk37 | —-0.053 |
| 41 | 19EH0064CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE LOCAL PROJECTS - SUGOD - CAWAYAN ROAD LEADING TO BLUE HOLE (PACKAGE II), SAN AGUSTIN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱26.3M | 100% | Medium risk36 | —-0.090 |
| 42 | 21CA0057CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-(TRIP)-CONCRETING OF ROAD AT BRGY. PITA LEADING TO DINALUPIHAN AGRO-TOURISM AREA-DINALUPIHAN, | Region III | Bataan 1st DEO | Completed | ₱39.2M | 100% | Medium risk36 | —-0.080 |
| 43 | 19EH0055CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION - ACCESS ROAD LEADING TO TUBURAN FALLS (PACKAGE II), K001 + 355 - K001 + 744.30, BRGY. TUBURAN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱15.4M | 100% | Medium risk36 | —-0.089 |
| 44 | 19CL0056CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS LIPAY-DINGIN-PANIBUATAN BOULEVARD, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱26.9M | 100% | Medium risk35 | —-0.096 |
| 45 | 21CL0042CONSTRUCTION OF BARRACKS WITH PARKING BAY AT NAVAL STATION LEOVIGUILDO GANTIOQUI (NSLG), SAN ANTONIO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱14.8M | 100% | Medium risk35 | —-0.098 |
| 46 | 23CL0074CONSTRUCTION OF MARANGLA RIVER FLOOD CONTROL STRUCTURE, PACKAGE 1, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱49M | 100% | Medium risk34 | —-0.084 |
| 47 | 23CL0093CONSTRUCTION OF GAMA RIVER FLOOD CONTROL STRUCTURE, PACKAGE 1, STA. CRUZ, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱48.1M | 100% | Medium risk33 | —-0.080 |
| 48 | 21CA0075LOCAL PROGRAM -CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-BUILDINGS AND OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN PABLODINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱7.4M | 100% | Medium risk33 | —-0.102 |
| 49 | 21CA0078LOCAL PROGRAM -CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-BUILDINGS AND OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN BENITODINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱7.3M | 100% | Medium risk33 | —-0.102 |
| 50 | 21CA0077LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-BUILDINGS AND OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY OLD SAN JOSEDINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱7.4M | 100% | Medium risk33 | —-0.103 |